Award notice, total small business set-aside, first published as presolicitation

Results - Demolish Bulk Fuel Facility Cutler

N4008524B2507

Department of the Navy, Navfacsyscom Mid-Atlantic. Oil and Gas Pipeline and Related Structures Construction.

Awarded

Specpro Environmental Services LLC

$11,898,741.50 obligated so far on USAspending

Description

As published on SAM.gov with the solicitation of July 19, 2024.

The work includes all labor, material, equipment, transportation, supervision, and incidental related work to demolish three existing bulk tanks and associated piping in the bulk tank area at NSA Cutler in Cutler, Maine. It also includes the demo of the four transient fuel tanks and their corresponding dog houses covering the utility pits. A total of four new 50,000 gal tanks will be installed in the existing bulk tank area and four 20,000 gal tanks will be installed in the transient fuel area.

There are 11 bid options. Bid option 1: Includes the demo of the bulk tank berm oil water separator. Bid option 2: Includes providing a 6 inch concrete slab on abandoned bulk tank foundation. Bid option 3: Includes the demo of cantilevered concrete pan at transient tank dog house. Bid option 4: Includes providing a reinforced membrane waterproofing system to building. Bid option 5: Includes providing concrete repairs inside transient utility tunnel - Crack Injection.

Bid option 6: Includes providing concrete repairs inside transient utility tunnel - Type B Spall. Bid option 7: Includes painting the bulk fuel tank support pipes. Bid option 8: Includes mill and overlay of roadways around project area. Bid option 9: Includes Fuel oil delivery and tank filling upon completion of Phase 2. Bid option 10: Includes on site temporary fuel storage for fuel oil removed as part of Phase 2. Bid option 11: provides for the installation of bollards for transient tank parking lot.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
NLCRUT3KG9R6
CAGE
39HU1
Vendor location
Knoxville, TN
Contract
N4008524C0027, definitive contract
Obligated
$11,898,741.50
Actions
1 between August 2, 2024 and August 2, 2024
Competition
Full and Open Competition After Exclusion of Sources, 3 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
Base Bid - Demolish Bulk Fuel Facility
Match
award number N4008524C0027 equals the contract number; same awarding office N40085 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 23, 2024

    Presolicitation

    Demolish Bulk Fuel Facility Cutler

    Due June 7, 2024 at 12:00 PM EDT. SAM.gov, notice 9576d255ba4841e1909250c0ad0acaba

  2. June 12, 2024

    Solicitation, originally presolicitation

    Demolish Bulk Fuel Facility Cutler

    Due July 12, 2024 at 11:00 AM EDT. SAM.gov, notice c90dfb69ba3a4a88a0940a1cfc2c6911

  3. July 8, 2024

    Solicitation

    AMENDMENT 0001 - Demolish Bulk Fuel Facility Cutler

    Due July 12, 2024 at 11:00 AM EDT. SAM.gov, notice 4c973563139f4d5d9b5a740736795b67

  4. July 9, 2024

    Solicitation

    AMENDMENT 0002 - Demolish Bulk Fuel Facility Cutler

    Due July 19, 2024 at 11:00 AM EDT. SAM.gov, notice 73aeb7c64b4c4946a682844874a6b28d

  5. July 19, 2024

    Solicitation

    Due July 19, 2024 at 11:00 AM EDT. SAM.gov, notice b86ba6e138614ba2a6e0bfdbe6b1012d

  6. August 2, 2024

    Award notice, originally solicitation

    Awarded to SPECPRO ENVIRONMENTAL SERVICES LLC Knoxville for $11,898,742. SAM.gov, notice 477dc6f0c4ce40baa9d6db924d87fe47