Solicitation
P-239, F-35 Flightline Utility Modernization Phase II, Design-Bid-Build Marine Corps Air Station, Cherry Point, North Carolina
N4008523R2576
Department of the Navy, Navfacsyscom Mid-Atlantic. Other Heavy and Civil Engineering Construction.
Response deadline
September 12, 2023 at 2:00 PM EDT
Closed 1148 days ago. Posted February 26, 2024, first published February 26, 2024. Scheduled to archive February 26, 2024.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2023
129 like it are open now in other heavy and civil engineering construction
- P110 CAPE CANAVERAL RAILHEAD AND TRANSFER FACILITIES AT KENNEDY SPACE CENTER, FLORIDA
Department of the Navy, Navfacsyscom Southeast
PresolicitationNAICS 237990Merritt Island, FLN6945027R0006Closes tomorrowNov 4 - Bayou Meto Canal 1000, Phase 4.1, Check Structure
Department of the Army, W07V Endist Memphis
Sources soughtNAICS 237990ArkansasW912EQ27S0003Closes in 2 daysNov 5 - GAOA Grizzly Bear Campground
Forest Service, Black Hills National Forest
SolicitationSmall businessNAICS 237990South Dakota127EAX27Q0004Closes in 2 daysNov 5
All 129 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
P-239, F-35 Flightline Utility Modernization Phase II, Marine Corps Air Station, Cherry Point, North CarolinaThis work includes P239 F-35 Flightline Utility Modernization Phase II, Design Bid Build, Marine Corps Air Station MCAS, Cherry Point. P-239 will upgrade, renovate, and modernize base utilities in the core area to servefuture airfield facilities.
Utility work includes fire protection lines, potable water lines, communication fiber and duct bank, sanitary sewer, electrical distribution lines, substation upgrades, industrial wastewater lines, natural gas,and steam distribution. Project is considered Phase 2 of 2. The project will separate the fire protection system for the deluge sprinkler and existing aqueous film forming foam systems flight line buildings from the existing potablewater system.
The new fire distribution system will include pipeline, fire pumps, fire pump buildings and water storage facilities. The potable water distribution system along A Street will be resized to correct the hydraulics andimprove water quality to the existing buildings. This project will also include new water service connections, advanced meters and the connection to the existing system along A Street. Elevated water storage tanks will berepaired and/or replaced to support the hydraulic changes.
Communications pathways consisting of fiber, duct banks, manholes, and cable will be constructed along A Street. Infrastructure will be modernized to support ALIS.Provide hardware installation/replacement, new splices, expand vault and additional coring. Sanitary sewer system will be a gravity collection system to replace the aged wastewater collection mains, pump station and lift stations.