Solicitation
B103 Repair Mechanical Systems and Building Improvements
N40080-24-R-3956
Department of the Navy, Navfacsyscom Washington. Commercial and Institutional Building Construction.
Response deadline
June 3, 2024 at 2:00 PM EDT
Closed 889 days ago. Posted May 3, 2024. Scheduled to archive June 18, 2024.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2024
190 like it are open now in commercial and institutional building construction
- COOLING TOWER 2 AND 3 REPAIR
Department of Veterans Affairs, 245-Network Contract Office 5
PresolicitationSmall businessNAICS 236220Baltimore, MD36C24527Q0038Closes in 15 daysNov 24 - NIH MULTIPLE-AWARD CONSTRUCTION CONTRACT (MACC) FOR GENERAL CONSTRUCTION SERVICES
National Institutes of Health, NIH a E Construction
SolicitationNAICS 236220Bethesda, MD75N99027R00002Closes in 36 daysDec 15 - Building 143 Concrete Scale Pad Expansion and Dock Leveler Replacement
Department of the Navy, NSWC Carderock
PresolicitationNAICS 236220Location not publishedN00167-27-SIMACQ-CD-102-0003Closes todayNov 9
All 190 open in commercial and institutional building construction
Description
As published on SAM.gov.
The project includes but is not limited to replacement of deteriorating (27) hydronic floor mounted fan coil units to include associated fittings, piping, valves, and accessories. (2) 7.5 ton rooftop package units to include associated, disconnect switches, circuit breakers, conduits, wirings, piping, valves, temperature sensors, controls, and accessories.
(2) Mini-split type a/c unit to include associated disconnect switches, circuit breakers, conduits, wirings, piping and accessories located in IDF room and locker room. (4) Ceiling exhaust fans and associated accessories located in first floor toilet male and female rooms, locker room, and weather office room– 104. (1) Baseboard heater unit and associated accessories located in second floor corridor 100 entryway. The new work includes of the following:
1) Provide and install (27) new ceiling cassette type fan coil units to include associated fittings, valves, piping, insulation, hanger support, digital control, and accessories. Provide fan coil units that match the existing chiller unit brand.
2) Modify existing fan coil units piping (cold/hot) as required for proper installation of new ceiling cassette type units. Remove any unused piping, fittings, valves, and associated accessories. Where required, drywall is removed add layer of ½ rigid expanded polystyrene (EPS) foam.
3) Provide and install (2) new 7.5 ton rooftop package units to include associated, disconnect switches, circuit breakers, conduits, wirings, piping, valves, temperature sensors, digital controls, and accessories. Provide necessary equipment required for ductwork cleaning. At no time both units will be down. Provide and install (2) pole metal mounted for disconnect switches.
4) Provide and install new (2) mini-split type a/c unit with cooling only to include associated disconnect switches, circuit breakers, conduits, wirings, piping and accessories located in IDF room and locker room. Existing housekeeping pads may reused if good condition is acceptable.
5) Provide and install new (4) ceiling exhaust fans located in first floor toilet male and female rooms, locker room, and weather office room– 104.
6) Provide and install new baseboard heater unit and associated accessories located in second floor corridor 100 entryway.
7) Provide and install new ceiling exhaust fan in second floor room 205; shower and toilet rooms to include circuit breakers, conduits, wirings, and associated accessories.
8) Provide and install new dedicated outdoor air system (DOAS) unit to include associated ductwork, housekeeping pad, disconnect switch, circuit breakers, conduits, wirings, control, sensors, and accessories. Provide design for DOAS unit to include ductwork and electrical systems. Perform load calculation to determine appropriate size unit.
9) Provide and install new acoustical ceiling tiles and associated accessories that match the existing patterns and finishes.
10) Modify existing electrical panel to adapt serve new DOAS unit and ceiling exhaust fans. Existing electrical wiring may reused if capacity is adequate and in good condition. Building will remain occupied during construction. Very important, heating, cooling, and dehumidification shall be maintained in the Air Traffic control operation room during this project.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 3, 2024
Solicitation
Due June 3, 2024 at 2:00 PM EDT. SAM.gov, notice d3222a37d03c4f958cc55a380a4d2381
Points of contact
- Jennifer Bowlingjennifer.l.bowling5.civ@us.navy.mil2025384189
- Keetje Straubkeetje.straub@navy.mil2027354002