Combined synopsis and solicitation
Isolation Transformers
N3904026Q3133
Department of the Navy, Portsmouth Naval Shipyard GF. Other Commercial and Industrial Machinery and Equipment Rental and Leasing.
Response deadline
July 30, 2026 at 5:00 PM EDT
Closed 94 days ago. Posted July 30, 2026, first published July 23, 2026. Scheduled to archive August 14, 2026.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2026
20 like it are open now in other commercial and industrial machinery and equipment rental and leasing
- Rental of Propane Water Heater (600,000 BTU/hr) and associated components
Department of the Navy, Portsmouth Naval Shipyard GF
Combined synopsis and solicitationSmall businessNAICS 532490CaliforniaN3904027Q3102Closes in 2 daysNov 3 - Karl Storz Brand Name or Equal Equipment Lease
Department of Veterans Affairs, 241-Network Contract Office 01
Combined synopsis and solicitationNAICS 532490Maine36C24127Q0039Closes todayNov 1 - Rental of AC Unit with Heaters
Department of the Navy, Norfolk Naval Shipyard GF
Sources soughtNAICS 532490Portsmouth, VANNSY-1200N-0005Closes tomorrowNov 2
All 20 open in other commercial and industrial machinery and equipment rental and leasing
Description
As published on SAM.gov.
For all transformers we are requesting primary side and secondary side electrical isolation disconnect switches/devices. One on each side, they can be of the fused or breaker style but must meet the ampacity of the circuit through each switch. 400, 800, 1200….
If the switches are installed on the transformer or on the skid it will be the responsibility of the vendor to electrically connect from the (load side) of the primary switch to the transformer and the (line side) secondary side to the transformer. The government will tie into the (line side from NAVFAC) of the primary switch and the (Load side to equipment to be powered) of the secondary disconnect switch. I have attached a basic skid figure of what we are looking (switches mounted to transformer or skid).
If the switches are independent (stand-alone units) the government will install all cabling on the switches and the transformers to meet project request.
We understand that the safety disconnects, over 400 amps, can get large and the skid mounted units may not be available. Reason why we added in the flexibility of stand along units in the SOW.
We do not want to parallel transformers, main reason why we are requesting larger KVA transformers.
Requirement Title: Rental of fourteen; (12) 400A Isolation Transformers, (1) 800A & (1) 1200A in
accordance with the SOW.
Solicitation Number: N3904026Q3133
Response Deadline: 07/30/2026 @ 11AM EST
POC: Christie Ashcraft Cell: (207) 651-0355
GENERAL INFORMATION:
1. This is a combined synopsis/solicitation for commercial products or commercial services prepared in
accordance with the format in FAR subpart 12 using Simplified Acquisition Procedures, as
supplemented with additional information included in this notice. This announcement constitutes the
only solicitation; proposals are being requested and a written solicitation will not be issued Paper copies
of this solicitation will not be available. This combined synopsis/solicitation SHALL be posted on
SAM.gov.
2. This solicitation documents and incorporates provisions and clauses in effect through FAC 2026-01 and
DFARS Change Notice 20260507. It is the responsibility of the contractor to be familiar with the
applicable clauses and provisions. The clauses may be accessed in full text at these addresses:
https://www.acquisition.gov/browse/index/far and
http://www.acq.osd.mil/dpap/dars/change_notices.html.
3. This solicitation is being issued as a(n): Request for Quotation (RFQ)
4. This acquisition is for: Full and Open Competition
5. North American Industry Classification System Code (NAICS): 532490
6. The size standard is: $40 Million Dollars
REQUIREMENT INFORMATION:
The Portsmouth Naval Shipyard requests responses from sources capable of providing the following:
Period of Performance:
. Base: 8/14/2026 – 8/12/2027 (52 Weeks)
. Option 1: 8/13/2027 – 9/23/2027 (6 Weeks)
. Option 2: 9/24/2027 – 10/21/2027 (4 Weeks)
. Option 3: 10/22/2027 – 11/18/2027 (4 Weeks)
Place of performance is Point Loma, San Diego, CA
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- N3904026Q3133 Combined Synopsis.pdf1.1 MB, July 23, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 23, 2026
Combined synopsis and solicitation, originally sources sought
Due July 30, 2026 at 11:00 AM EDT. SAM.gov, notice 68bb516c30a94d67ae5803e1f0eb9838
3 revisions on SAM
- July 30, 2026: publish, combined synopsis and solicitation
- July 23, 2026: publish, combined synopsis and solicitation
- June 26, 2026: publish, sources sought
July 30, 2026
Combined synopsis and solicitation
Due July 30, 2026 at 5:00 PM EDT. SAM.gov, notice 0c6a8d3395254d6396b846179accaac0
4 revisions on SAM
- August 27, 2026: publish, award notice
- July 30, 2026: publish, combined synopsis and solicitation
- July 23, 2026: publish, combined synopsis and solicitation
- June 26, 2026: publish, sources sought