Combined synopsis and solicitation

Isolation Transformers

N3904026Q3133

Department of the Navy, Portsmouth Naval Shipyard GF. Other Commercial and Industrial Machinery and Equipment Rental and Leasing.

Response deadline

July 30, 2026 at 5:00 PM EDT

Closed 48 days ago. Posted July 30, 2026, first published July 23, 2026. Scheduled to archive August 14, 2026.

Description

As published on SAM.gov.

For all transformers we are requesting primary side and secondary side electrical isolation disconnect switches/devices. One on each side, they can be of the fused or breaker style but must meet the ampacity of the circuit through each switch. 400, 800, 1200…. If the switches are installed on the transformer or on the skid it will be the responsibility of the vendor to electrically connect from the (load side) of the primary switch to the transformer and the (line side) secondary side to the transformer.

The government will tie into the (line side from NAVFAC) of the primary switch and the (Load side to equipment to be powered) of the secondary disconnect switch. I have attached a basic skid figure of what we are looking (switches mounted to transformer or skid). If the switches are independent (stand-alone units) the government will install all cabling on the switches and the transformers to meet project request.

We understand that the safety disconnects, over 400 amps, can get large and the skid mounted units may not be available. Reason why we added in the flexibility of stand along units in the SOW. We do not want to parallel transformers, main reason why we are requesting larger KVA transformers.

Requirement Title: Rental of fourteen; (12) 400A Isolation Transformers, (1) 800A & (1) 1200A in accordance with the SOW.

Solicitation Number:

N3904026Q3133 Response Deadline: 07/30/2026 @ 11AM EST POC:

Christie Ashcraft Cell: (207)

651-0355 GENERAL INFORMATION:

1. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in FAR subpart 12 using Simplified Acquisition Procedures, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued Paper copies of this solicitation will not be available. This combined synopsis/solicitation SHALL be posted on SAM.gov.

2. This solicitation documents and incorporates provisions and clauses in effect through FAC 2026-01 and DFARS Change Notice 20260507. It is the responsibility of the contractor to be familiar with the applicable clauses and provisions. The clauses may be accessed in full text at these addresses: https://www.acquisition.gov/browse/index/far and http://www.acq.osd.mil/dpap/dars/change_notices.html.

3. This solicitation is being issued as a(n): Request for Quotation (RFQ) 4. This acquisition is for: Full and Open Competition 5. North American Industry Classification System Code (NAICS): 532490 6. The size standard is:

$40 Million Dollars REQUIREMENT INFORMATION: The Portsmouth Naval Shipyard requests responses from sources capable of providing the following:

Period of Performance: .

Base: 8/14/2026 – 8/12/2027 (52 Weeks) .

Option 1: 8/13/2027 – 9/23/2027 (6 Weeks) .

Option 2: 9/24/2027 – 10/21/2027 (4 Weeks) .

Option 3: 10/22/2027 – 11/18/2027 (4 Weeks) Place of performance is Point Loma, San Diego, CA

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 23, 2026

    Combined synopsis and solicitation, originally sources sought

    Due July 30, 2026 at 11:00 AM EDT. SAM.gov, notice 68bb516c30a94d67ae5803e1f0eb9838

  2. July 30, 2026

    Combined synopsis and solicitation

    Due July 30, 2026 at 5:00 PM EDT. SAM.gov, notice 0c6a8d3395254d6396b846179accaac0