Skip to content
  • 7,401 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation, first published as presolicitation

MOUNTING BASE,ELECT, IN REPAIR/MODIFICATION OF

N0038326QNA01

Department of the Navy, NAVSUP Weapon Systems Support. Machine Shops.

Response deadline

November 17, 2025 at 3:30 PM EST

Closed 358 days ago. Posted October 17, 2025, first published October 1, 2025. Scheduled to archive December 2, 2025.

Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities

This one closed in 2025

35 like it are open now in machine shops

  • U Bolt For Watervliet Arsenal

    Department of the Army, W6QK ACC Wva

    SolicitationSmall businessNAICS 332710Anywhere in the USWatervliet ArsenalW911PT27QA021
    Closes todayNov 10
  • CONDUIT ASSEMBLY,ME

    Defense Logistics Agency, Sprmm1 DLA Mechanicsburg

    SolicitationNAICS 332710Anywhere in the USSPRMM127QGA28
    Closes in 2 daysNov 12
  • CABLE ASSY TORPEDO,

    Defense Logistics Agency, DLA Aviation at Philadelphia, PA

    SolicitationNAICS 332710Anywhere in the USSPRPA127QYA13
    Closes in 2 daysNov 12

All 35 open in machine shops

Description

As published on SAM.gov.

CONTACT INFORMATION|4|n731.55|n00383|771-229-3309|taylor.m.oconnor2.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|invoice and receiving reports (combo)||n/a|n00383|n/a|n/a|n/a|n/a||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 year after date of delivery|45 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|335931|500||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| The Small Business Administration representative at NAVSUP WSS has reviewed this requirement and determined that a set-aside recommendation was not applicable for this procurement. This RFQ is for repair. NAVSUP WSS requests that contractors submit a quote that includes either a firm-fixed price or estimate costs to repair this item. This contract/delivery order/purchase order/modification is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to issue this contract/delivery order/purchase order/modification. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS MOUNTING BASE,ELECT , ;MOUNTING BASE,ELECT; , ;7RH 5975 01 266 0904 LC; , 7RH 5975-01-266-0904 JT 3.1 Applicable Documents 3.1.1 The contractor shall perform the necessary work to return the subject item to Ready-For-Issue (RFI) serviceable operating condition and insure compliance with the requirements of the following drawings and specifications: 1. MOUNTING BASE,ELECT Drawing ( ;13499; ) ;622-5148-004; Rev ;Latest; . 2. All inspections, evaluations, repair/overhaul, and testing functions shall be in compliance with: ;all specifications, standards, test plans, and other related technical data.; 3.2 Work Requirements: 3.2.1 All units determined by the contractor to be beyond economical repair (cost of repair/rework not to exceed ;80; of the original cost of the item) shall bear a confirmation by DCMC and shall accompany the contract evaluation and quote to the Contracting Officer. In the event that an item is received with one or more subassemblies missing, the contractor shall promptly obtain confirmation of such finding from the DCMC (QAR) and upon confirmation notify the PCO 3.2.2 Acceptance testing shall be conducted under the surveillance of the DCMC (QAR). These tests shall include all tests necessary to assure that the material serviced conforms to the performance required to provide Ready-For-Issue material. The DCMC shall retain the authority to conduct or reconduct any tests deemed necessary to insure compliance with the applicable documents and specifications that are cited in paragraph 1 of the requirements section. 3.2.3 A copy of the DD Form 250 shall be packed with each unit processed under this contract. One copy of the DD Form 250 shall be forwarded to the Procurement Contracting Officer. 3.2.4 The contractor shall perform Testing and Evaluation (T&E) of all units submitted for work. T&E shall be conducted in accordance with the repair manual or specifications stated in section 1 of this statement of work. Based on the results of the T&E, severity of the failure, and total operational hours accumulated since the last repair/overhaul, the contractor shall make its recommendations to either repair or overhaul the unit to the DCMC (QAR). The contractor shall not begin work before receiving approval from the DCMC (QAR). 3.2.5 Upon receiving DCMC (QAR) approval, the contractor shall overhaul or repair the subject item to a Ready-For-Issue (RFI), serviceable operating condition and insure compliance with the requirements of the documents and specifications listed in paragraph 1 of the requirement's section. 3.2.6 For the purpose of the statement of work, "Overhaul" is defined as follows: All items regardless of their condition shall be subjected to all of actions outlined in the documents and specifications listed in section 1. The contractor shall inspect all components and repair/refurbish/replace those components that fail to meet the limits specified in the documents and specifications listed in paragraph 1 of the requirement's section. Parts exceeding the dimensional limits shall be scrapped or repaired in accordance with documents and specifications listed in section 1 of this SOW. Parts that cannot be repaired/refurbished shall be scrapped and material review (MRB) will not be granted on these components/parts. 3.2.7 For the purposes of this statement of work, "REPAIR" is defined as follows: Items deemed repairable shall be subjected only to the actions necessary to correct the failed/non-operational condition. All work shall be performed as outlined in the documents and specifications listed in section 1 of this SOW. The contractor shall inspect only those components/areas identified in the Testing and Evaluation phase as being defective, and repair, replace and or refurbish those failing to meet the limits specified in the documents and specifications listed in section 1 of this SOW. Parts exceeding the dimensional limits shall be scrapped or repaired in accordance with the documents and specifications listed in section 1. Parts that cannot be repaired/refurbished shall be scrapped and material review (MRB) will not be granted for these items. 3.2.8 Services required to accomplish the above objectives shall be in accordance with the contractor's established industrial shop methods and existing special tools and test equipment. 3.2.9 ;applies; Service change bulletins or modifications, except as specified herein, shall not be incorporated by the contractor without prior approval from the contracting officer. 3.2.10 ;not apply; Change modifications ;not apply; shall be incorporated for the items under this contract. Reworked/upgraded items will be reidentified as follows: ;not apply; 3.3 In the event that the contractor requests a waiver, deviation or modification for parts/subassemblies, all Engineering Change Proposals, waivers, and deviations shall be prepared in accordance with MIL-STD-973. 3.4 Quality Assurance: 3.4.1 During the performance of this contract, the contractor shall maintain a Quality Assurance System in accordance with MIL-I-45208, or equivalent (e.g. ISO-9001, ISO-9002, MIL-Q-95208) 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. October 1, 2025

    Presolicitation

    Due November 16, 2025 at 11:00 PM EST. SAM.gov, notice afe43a2d323f424495ab6c605bbf1ce7

    1 revisions on SAM
    • October 1, 2025: publish, presolicitation
  2. October 17, 2025

    Solicitation

    Due November 17, 2025 at 3:30 PM EST. SAM.gov, notice fc74f3a124984e4db8cc43a3822441a1

    1 revisions on SAM
    • October 17, 2025: publish, solicitation

Points of contact