Solicitation
FMS REPAIR OXYGEN SYSTEM, AIRCR
N0038326QL065
Department of the Navy, NAVSUP Weapon Systems Support. Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Response deadline
May 22, 2026 at 4:00 PM EDT
Closed 163 days ago. Posted April 22, 2026. Scheduled to archive June 6, 2026.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2026
538 like it are open now in other aircraft parts and auxiliary equipment manufacturing
- Repair of the Attitude Heading Reference System (AHRS) Applicable to the TH-1H Helicopter
Department of the Air Force, FA8524 AFSC Pzaaa
PresolicitationNAICS 336413Anywhere in the USFD20602700066Closes todayNov 1 - MH65 Hose
US Coast Guard, Aviation Logistics Center (Alc)
Combined synopsis and solicitationNAICS 336413Anywhere in the US70Z03827QB0000005Closes tomorrowNov 2 - MH-65 HOSE ASSEMBLY, METALLIC
US Coast Guard, Aviation Logistics Center (Alc)
Combined synopsis and solicitationNAICS 336413Anywhere in the US70Z03827QB0000008Closes tomorrowNov 2
All 538 open in other aircraft parts and auxiliary equipment manufacturing
Description
As published on SAM.gov.
N0038326PR0R380_FMS
TRANSPORTATION SCHEDULE INSTRUCTIONS:
In accordance with attached packaging sheet
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset
Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is
defined as physical receipt of the F-condition asset at the contractor’s facility as reflected in the Action Date
entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the
contractor is required to accurately report all transactions by the end of the fifth regular business day after
receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
Required RTAT: 26 days after receipt of asset
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs
established in the subsequent contract.
Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be
repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per
month reflects no throughput constraint.
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not
authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting
Officer.
Reconciliation:
The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such
prices are based on the Contractor meeting the RTAT requirements If the Contractor does not meet the
applicable RTAT requirement, described within the schedule page, consideration will be assessed and subject to
negotiation. Price reductions made pursuant to this section shall not limit other remedies available to the
Government for failure to meet required RTATs, including but not limited to the Government's right to
terminate for default.
ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS
DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE
CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN
THE MAIL, TRANSMITTED BY FACSIMILE, ORSENT BY OTHER ELECTRONIC COMMERCE
METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S
PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS
AS DETAILED HEREIN.
Early and incremental deliveries accepted and preferred.
POC: Kristin Clemens
Phone: 771-229-0403
E-mail: kristin.clemens2.civ@us.navy.mil
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 3.01_RFQ_N0038326QL065.pdf1.2 MB, April 22, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 22, 2026
Solicitation
Due May 22, 2026 at 4:00 PM EDT. SAM.gov, notice 722bfd0297c0489c93278006fff7fdeb
1 revisions on SAM
- April 22, 2026: publish, solicitation
Points of contact
- Kristin ClemensKristin.clemens2.civ@us.navy.mil7712290403