Skip to content
Abierto

Solicitation

RUDDER,AIRCRAFT

N0038326QHA66

Department of the Navy, NAVSUP Weapon Systems Support. Other Aircraft Parts and Auxiliary Equipment Manufacturing.

Response deadline

September 8, 2026 at 4:30 PM EDT

Closed 8 days ago. Posted August 6, 2026. Scheduled to archive September 23, 2026.

Description

As published on SAM.gov.

CONTACT INFORMATION|4|N722.30|B5F|albert.j.russo17.civ@us.navy.mil|771-229-0549| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo) Type||DFAS|N00383|DCMA|DCMA|See Schedule|Source||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| This requirement is for the repair of the items herein thissolicitation.

Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.

In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.

Required RTAT:

days after receipt of asset.

Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of

per month reflects no throughput constraint.

Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT.

Such prices are based on the Contractormeeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.

ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS AND MODIFICATIONS)RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE"CONTRACTUAL DOCUMENTS AS DETAILED HEREIN.

Early and incremental deliveries accepted and preferred. \ 1. SCOPE ITEM MUST BE REPAIR/OVERHAULED IAW STATEMENT OF WORK DATED AND SIGNED 04OCT2024 FOR E-2 RUDDER ASSEMBLY, INBOARD, UPPER (RH) THIS IS A HARDCOPY SOW AND CDRLS. HARDCOPY SOW AND CDRL CAN BE OBTAINED FROM N231 SOURCE DEVELOPMENT. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE First Article Inspection (FAI) of the first item repaired is required. DCMA and FST shall be present for FAI.

The inspection will be performed at the contractor?s facility. The complete cleaning, inspection, assembly and testing of the part shall be verified to ensure compliance with all repair publications. See Testing Requirements within HARDCOPY SOW. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 6, 2026

    Solicitation

    Due September 8, 2026 at 4:30 PM EDT. SAM.gov, notice 5c5503766abe4a748081ad21239f8102

Points of contact