Solicitation
VALVE ASSEMBLY,FAIL, 287870-1001
N0038326QH082
Department of the Navy, NAVSUP Weapon Systems Support. Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Response deadline
August 23, 2026 at 2:00 PM EDT
Closed 70 days ago. Posted July 23, 2026. Scheduled to archive September 7, 2026.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2026
538 like it are open now in other aircraft parts and auxiliary equipment manufacturing
- Repair of the Attitude Heading Reference System (AHRS) Applicable to the TH-1H Helicopter
Department of the Air Force, FA8524 AFSC Pzaaa
PresolicitationNAICS 336413Anywhere in the USFD20602700066Closes todayNov 1 - MH65 Hose
US Coast Guard, Aviation Logistics Center (Alc)
Combined synopsis and solicitationNAICS 336413Anywhere in the US70Z03827QB0000005Closes tomorrowNov 2 - MH-65 HOSE ASSEMBLY, METALLIC
US Coast Guard, Aviation Logistics Center (Alc)
Combined synopsis and solicitationNAICS 336413Anywhere in the US70Z03827QB0000008Closes tomorrowNov 2
All 538 open in other aircraft parts and auxiliary equipment manufacturing
Description
As published on SAM.gov.
NOTE:
NO FAST PAY.
CAV REPORTING IS REQUIRED UNDER SUBJECT AWARD.
THE CONTRACTOR IS REQUIRED TO SHIP BY TRACEABLE MEANS.
SEND A NOTIFICATION OF SHIPMENT TO BOTH THE PCO AND NAVSUP WSS REPAIR MANAGER: BALDEMAR CANTU,BALDEMAR.CANTU.CIV@US.NAVY.MIL,
GOVERNMENT SOURCE INSPECTION IS REQUIRED.
CONTACT DCMC TRANSPORTATION OFFICER FOR SHIPPING INSTRUCTIONS.
PACKAGING AND MARKING SHALL BE IN ACCORDANCE WITH BEST STANDARD COMMERCIAL PACKAGING FOR OVERSEAS SHIPMENT. IF AN ITEM IS FOUND TO BE EITHER BEYOND ECONOMICAL REPAIR (BER) OR BEYOND REPAIR (BR), THE CONTRACTOR SHALL NOTIFY THE DEFENSE CONTRACT MANAGEMENT AGENCY (DCMA) QUALITY ASSURANCE REPRESENTATIVE (QAR) FOR VERIFICATION OF THE ITEM'S CONDITION. THE QAR WILL PROVIDE THEIR ASSESSMENT OF THE ITEM'S CONDITION ALONG WITH ANY OTHER PERTINENT INFORMATION TO THE DCMA ADMINISTRATIVE CONTRACTING OFFICER (ACO). THE ACO WILL ROUTE THE INFORMATION TO THE NAVSUP WSS PROCUREMENT CONTRACTING OFFICER (PCO). THE CONTRACTOR SHALL NOT SCRAP OR CANNIBALIZE THE ITEM UNTIL WRITTEN AUTHORIZATION IS PROVIDED BY THE NAVSUP WSS PCO.
THROUGHPUT CONSTRAINT, AND INDUCTION EXPIRATION DATE INCLUDED IN CLIN REMARKS BELOW ARE DEFINED AS FOLLOWS:
REPAIR TURNAROUND TIME (RTAT): THE CONTRACTUAL DELIVERY REQUIREMENT IS MEASURED FROM ASSET RETURN TO THE DATE OF ASSET ACCEPTANCE UNDER THE TERMS OF THE CONTRACT (DAYS). FOR PURPOSES OF THIS SECTION, RETURN IS DEFINED AS PHYSICAL RECEIPT OF THE F-CONDITION ASSET AT THE CONTRACTOR’S FACILITY AS
REFLECTED IN THE ACTION DATE ENTRY IN THE COMMERCIAL ASSET VISIBILITY (CAV) SYSTEM. IN ACCORDANCE WITH THE CAV STATEMENT OF WORK, THE CONTRACTOR IS REQUIRED TO ACCURATELY REPORT ALL TRANSACTIONS BY THE END OF THE FIFTH REGULAR
BUSINESS DAY AFTER RECEIPT AND THE ACTION DATE ENTERED IN CAV MUST BE DATED TO REFLECT THE ACTUAL DATE OF PHYSICAL RECEIPT.
THROUGHPUT CONSTRAINT: TOTAL ASSETS TO BE REPAIRED MONTHLY AFTER INITIAL DELIVERY COMMENCES. A THROUGHPUT OF 0000/MONTH REFLECTS NO THROUGHPUT CONSTRAINT.
INDUCTION EXPIRATION DATE: ANY ASSET RECEIVED AFTER THIS DATE IN DAYS IS NOT AUTHORIZED TO BE REPAIRED WITHOUT BI-LATERAL AGREEMENT BETWEEN THE VENDOR AND CONTRACTING OFFICER.
THE CONTRACTOR MUST OBTAIN FINAL INSPECTION AND ACCEPTANCE BY THE GOVERNMENT FOR ALL ASSETS WITHIN THE RTATS ESTABLISHED IN THIS CONTRACT. ANY UNITS THAT MEET THE RTAT REQUIREMENT WITHIN THE SUBCLIN REMARKS SHALL BE PRICED AT THE UNIT PRICE ESTABLISHED IN THIS CONTRACT.
THROUGHPUT CONSTRAINT: TOTAL ASSETS TO BE REPAIRED MONTHLY AFTER INITIAL DELIVERY COMMENCES. A THROUGHPUT OF 0000/MONTH REFLECTS NO THROUGH PUT CONSTRAINT.
INDUCTION EXPIRATION DATE: ANY ASSET RECEIVED AFTER THIS DATE IN DAYS IS NOT AUTHORIZED TO BE REPAIRED WITHOUT BI-LATERAL AGREEMENT BETWEEN THE VENDOR AND CONTRACTING OFFICER.
THE CONTRACTOR MUST OBTAIN FINAL INSPECTION AND ACCEPTANCE BY THE GOVERNMENT FOR ALL ASSETS WITHIN THE RTATS ESTABLISHED IN THIS CONTRACT. ANY UNITS THAT MEET THE RTAT REQUIREMENT WITHIN THE SUBCLIN REMARKS SHALL BE PRICED AT THE UNIT PRICE ESTABLISHED IN THIS CONTRACT.
PRICE REDUCTIONS
ANY ASSETS FOR WHICH THE CONTRACTOR DOES NOT MEET THE REQUIRED RTAT WILL INCUR A PRICE REDUCTION OF TBD PER UNIT. THIS ADJUSTMENT WILL BE IMPLEMENTED VIA A RECONCILIATION MODIFICATION AT THE END OF CONTRACT PERFORMANCE. PRICE REDUCTIONS MADE PURSUANT TO THIS SECTION SHALL NOT LIMIT OTHER REMEDIES AVAILABLE TO THE GOVERNMENT FOR FAILURE TO MEET REQUIRED RTATS, INCLUDING BUT NOT LIMITED TO THE GOVERNMENT’S RIGHT TO TERMINATE FOR DEFAULT.
RECONCILIATION
A RECONCILIATION MODIFICATION WILL BE ISSUED AFTER FINAL INSPECTION AND ACCEPTANCE OF ALL ASSETS INDUCTED UNDER THIS CONTRACT. THE PARTIES HAVE AGREED TO A PRICE (SHOWN ON THE SCHEDULE PAGE) FOR EACH UNIT AT THE NEGOTIATED RTAT. SUCH PRICES ARE BASED ON THE CONTRACTOR MEETING THE RTAT REQUIREMENTS DESCRIBED WITHIN THE SCHEDULE PAGE. IF THE CONTRACTOR DOES NOT MEET THE APPLICABLE RTAT REQUIREMENT, THE PRICE ADJUSTMENT AS STATED SHALL BE APPLICABLE.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Solicitation - N0038326QH082.pdf1.3 MB, July 23, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 23, 2026
Solicitation
Due August 23, 2026 at 2:00 PM EDT. SAM.gov, notice 1ce8ce367c9244bb85b78dd8e4863bea
1 revisions on SAM
- July 23, 2026: publish, solicitation
Points of contact
- JEREMY P. BARNEY, N722.10, PHONE (215)697-1234, FAX (215)697-0491, EMAIL JEREMY.BARNEY1@NAVY.MILJEREMY.BARNEY1@NAVY.MIL