Skip to content
  • 6,614 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation, first published as presolicitation

VALVE,BUTTERFLY, IN REPAIR/MODIFICATION OF

N0038325RD132

Department of the Navy, NAVSUP Weapon Systems Support. Other Metal Valve and Pipe Fitting Manufacturing.

Response deadline

July 17, 2025 at 2:00 PM EDT

Closed 474 days ago. Posted June 17, 2025, first published May 30, 2025. Scheduled to archive August 1, 2025.

Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities

This one closed in 2025

177 like it are open now in other metal valve and pipe fitting manufacturing

  • VALVE,CHECK

    Department of the Navy, NAVSUP Weapon Systems Support Mech

    SolicitationNAICS 332919Anywhere in the USN0010427QLA04
    Closes tomorrowNov 4
  • NOZZLE ASSEMBLY

    Defense Logistics Agency, DLA Aviation at Philadelphia, PA

    SolicitationNAICS 332919Anywhere in the USSPRPA127QXA18
    Closes tomorrowNov 4
  • FAIRING NOZZLE

    Defense Logistics Agency, DLA Aviation at Philadelphia, PA

    SolicitationNAICS 332919Anywhere in the USSPRPA127QXA14
    Closes tomorrowNov 4

All 177 open in other metal valve and pipe fitting manufacturing

Description

As published on SAM.gov.

COMMERCIAL ITEM PROCUREMENT NOTICE - AWARD|4| | | | | ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19| | | | | | | || | | | | | || | | | | HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X| | | | | | | | INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X| | | | | | | | | | | |X| | || | | | | | | | | | | TIME OF DELIVERY (JUNE 1997)|20| | | || | | | | | | | | | | || | | | | STOP-WORK ORDER (AUG 1989)|1| | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16| INVOICE AND RECEIVING REPORT COMBO TYPE |N/A|TBD|N00383|TBD|TBD|See Schedule|TBD| | |TBD| | | | | | NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1| | INTEGRITY OF UNIT PRICES (NOV 2021)|1| | WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect| | | | | SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9| | | | | || | | | EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2| | | TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2| | | BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11| || | | | | || | | | CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVEORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2025)(DEVIATION 2025-O|81| | || | | | | || | | | | || | | || || | | | | | | | | | | | | | | || | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | || | | || | | || | | | CUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2025)(DEVIATION|16| | | | | || | | | | | | | | | | |13| | | | | | | | | | || | | BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5| || | | | BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1| | ROYALTY INFORMATION (APR 1984)|1| | ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|332919|750| | | | | | || | | | TYPE OF CONTRACT (APR 1984)|1| | NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|DO-A1A |X| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract.

For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.

Required RTAT: 110 days after receipt of asset.

Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of

per month reflects no throughput constraint.

Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred.

1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document.

1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.

1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.

1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4.

2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Items coated with yellow paint shall be totally stripped of yellow paint and repainted with white coating systems as follows:

3.1.1 Primary System a. Pretreatment, for steel only, shall be MIL-C-10578. Pretreatment for aluminum is not authorized. b. Primer shall be epoxy coating MIL-P-53022 Type II (VOC 340 G/L), available from: 1. Sherman Williams, (312) 821-3434 P/N E90WY14/V93VY9 2. PPG (216) 671-0056 P/N W423305 3. Niles (800) 253-7389 P/N 3580 c. If above materials are not available, the following materials are authorized for use:

1. Epoxy coating MIL-P-5302 Type II (VOC 420 G/L). Where permitted by local environmental regulations.

2. Epoxy, water reducible, shall be MIL-P-5303 (VOC 340 G/L).

3. Topcoat Primer-Polyurethane shall be MIL-C-85285, Type II (VOC 340 G/L) color number 17925 CF FED-STD-595. d. All removed yellow paint should be treated as if it contains lead and chromates and proper safety and disposal procedures shall be adhered to.

4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 30, 2025

    Presolicitation

    Due July 15, 2025 at 12:00 AM EDT. SAM.gov, notice 42677b9218fe466e89ee78bdc42bfb33

  2. June 17, 2025

    Solicitation

    Due July 17, 2025 at 2:00 PM EDT. SAM.gov, notice 53194542e0514445814943b3f5503a3d

Points of contact