Presolicitation
FMS, QTY: 1, NIIN: 013820706
N0038325Q0135
Department of the Navy, NAVSUP Weapon Systems Support. Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Response deadline
October 10, 2025 at 5:00 PM EDT
Closed 387 days ago. Posted September 25, 2025. Scheduled to archive October 25, 2025.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2025
538 like it are open now in other aircraft parts and auxiliary equipment manufacturing
- Repair of the Attitude Heading Reference System (AHRS) Applicable to the TH-1H Helicopter
Department of the Air Force, FA8524 AFSC Pzaaa
PresolicitationNAICS 336413Anywhere in the USFD20602700066Closes todayNov 1 - MH65 Hose
US Coast Guard, Aviation Logistics Center (Alc)
Combined synopsis and solicitationNAICS 336413Anywhere in the US70Z03827QB0000005Closes tomorrowNov 2 - MH-65 HOSE ASSEMBLY, METALLIC
US Coast Guard, Aviation Logistics Center (Alc)
Combined synopsis and solicitationNAICS 336413Anywhere in the US70Z03827QB0000008Closes tomorrowNov 2
All 538 open in other aircraft parts and auxiliary equipment manufacturing
Description
As published on SAM.gov.
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractors facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.\\
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.\\
Required RTAT: 73.22 days after receipt of asset.\\
Throughput Constraint: Contractor must provide a throughput constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of XXX per month reflects no throughput constraint.\\
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.\\
Reconciliation: A reconciliation modification will be issued after final inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.\\
All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.\\
Early and incremental deliveries are accepted and preferred.\\
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 25, 2025
Presolicitation
Due October 10, 2025 at 5:00 PM EDT. SAM.gov, notice 68b9c22febd5440b8edb91b295c433d2
1 revisions on SAM
- September 25, 2025: publish, presolicitation
Points of contact
- Joseph Pacejoseph.k.pace8.civ@us.navy.mil2156971255