Skip to content
  • 7,591 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, women-owned small business set-aside

Battery Backup equipment

N0017325QGF30

Department of the Navy, Naval Research Laboratory. Battery Manufacturing.

Awarded

Eoi Inc.

$42,155.84 obligated so far on USAspending

Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities

This one was awarded in 2025

19 like it are open now in battery manufacturing

  • BATTERY,STORAGE

    Defense Logistics Agency, DLA Weapons Support

    Combined synopsis and solicitationSmall businessNAICS 335910Anywhere in the USSPE7L727T0407
    Closes tomorrowNov 6
  • BATTERY ASSEMBLY

    Defense Logistics Agency, DLA Weapons Support

    Combined synopsis and solicitationSmall businessNAICS 335910Anywhere in the USSPE7L727Q0170
    Closes in 3 daysNov 8
  • ELETRODE ASSEMBLY

    Defense Logistics Agency, DLA Weapons Support

    Combined synopsis and solicitationWOSBNAICS 335910Anywhere in the USSPE7L727T0438
    Closes in 4 daysNov 9

All 19 open in battery manufacturing

Description

As published on SAM.gov.

This is a request for Quotes for battery backup equipment.  The Naval Research Laboratory requires four (4) Emergency Battery Backups, each meeting the following specifications:

5000 watts of Single-phase power with a 4.8 KWH battery bank

120VAC Input/120VAC Output

(6) 20A breakers.

Input conductor size 6 AWG, output conductor size 12 AWG

Surge wattage 10,000

Please submit quotes to the points of contact listed in this announcement prior to the deadline. 

In response to numerous vendor questions the deadline for quote submissions has been extended.  Q&A with vendors is provided below:

Runtime Expectation – Is there a minimum required runtime (in minutes/hours) at the 5,000 W load?  This is load dependant.  This configuration of batteries has a 4.8kWh capacity, so given a 50A breaker at 120VAC = 6000w, at maximum draw that would be 0.8 hrs, but typically the unit is expected to last a minimum of 4 hrs.  The capability of integrated battery expansion is also a feature necessary to this unit, so this runtime number could be expanded by 3X by adding a battery module chassis.

Breakers – Should the six (6) 20A breakers be integrated into the UPS chassis, or may they be provided via a separate distribution panel?  Yes, the (6) breakers are an integral aspect of the UPS chassis.

Scope – Please confirm this is a procurement-only requirement (equipment delivery only), with no installation or commissioning expected.  Equipment delivery only

Certifications – Are there any specific standards required (e.g., UL, NFPA, MIL-STD, TAA compliance)?  At minimum, Inverter: UL 1741, Battery: UL 94V-0

Provide a specification for the battery equipment   Battery Backup, Output capacity: 5k, Battery Capacity: 4.8 kWh @ 48V, Hardwired, Power requirements: 50A, 120 VAC 60 Hz single phase or 240 VAC, Output: six(6) 120 VAC 60 Hz, 20A single phase integrated breakers, Waveform: Pure Sine Wave performance, Transfer time: min 20 ms, Modular battery expansion capability, Wall Mounted - Unit Dimensions: not to exceed 14” w x 75” h x 12” d.

Provide estimated delivery city, state  6-8wks, Naval Research Laboratory, Key West FL 33040

Provide estimated ETA for delivery of equipment   6-8wks

What is the exact delivery location for shipment?   Attn: Matt Krupa, US Naval Research Laboratory, Bldg F-14, Key West, FL 33040

What is your desired timeline for receipt of the units?  6-8 wks

Are there any restrictions on items produced outside of the United States, particularly from China?  USA Source Only

Can you provide any additional specifications, preferred brands, or specific dimensional requirements beyond those listed?  Medi-Products SSH5040, Wall Mounted - Unit Dimensions: not to exceed 14” w x 75” h x 12” d.

Delivery Location – Could you please provide the shipping address or indicate whether delivery is FOB Destination or FOB Origin?  Attn: Matt Krupa, US Naval Research Laboratory, Bldg F-15, Key West, FL 33040

Brand Requirement – Are you seeking a specific brand of battery backup equipment, or will products that meet or exceed the listed specifications be considered acceptable?  Medi-products SSH 5040 unit meets specification and space requirements

Input Voltage

At 5000 W continuous, a 120 VAC input would draw approximately 42 A. Standard commercial battery backup systems of this capacity typically require 208–240 VAC input.  Unit specifications for Input are 50A, 120VAC, single phase 60 Hz, but 240 VAC, single phase only would be acceptable.  Output must be 120 VAC, six 20A integrated breakers

Could the Government confirm whether 208–240 VAC input is acceptable, with the system providing 120 VAC output, or must the system operate on 120 VAC input only?  The unit could use 240 VAC, single phase input.  Output must be 120 VAC, six 20A integrated breakers.

20 A Breakers

Must the six (6) 20 A breakers be integrated within the battery backup unit, or may they be provided in a separate PDU or panelboard fed from the unit’s hardwired output?  Breakers should be integral to the battery backup unit.

Do the breakers need to serve a specific receptacle type (e.g., NEMA 5-20R), or is general circuit protection acceptable?  Receptacles will have isolated electrical grounds.

Output Conductor Size

When the RFQ specifies “output conductor size 12 AWG,” does this refer to each branch circuit conductor from the breaker to the outlet?  Yes

Is it acceptable for the UPS to have a larger hardwired output conductor feeding a PDU with 12 AWG branch circuits downstream?  No, the (6) breakers should be integral to the Battery backup chassis.

Battery Chemistry

Does the Government have a preferred battery chemistry (e.g., AGM/VRLA, Lithium-Ion, LiFePO4), or are all commercially available chemistries acceptable?  Typically, AGM Lead-Acid.

Can you please provide the delivery address to estimate shipping cost. Is inside delivery needed with lift gate services, is there a loading dock?  Attn: Matt Krupa, US Naval Research Laboratory, Bldg F-14, Key West, FL 33040,  Forklift available.

Could you please confirm the required size of cable, Input conductor 6 AWG, output conductor 12 AWG?  Use NEC requirements for Input: 50A, 120 VAC, and (6) 120 VAC 20 A branch circuits.

UPS class — Do you require true UPS (double-conversion, UL 1778) or will a standalone inverter/charger (UL 1741 class) meet the need? (Major equipment cost driver.)  UL 1741 is acceptable.

Runtime target — Minimum runtime and load level (e.g., 50% load for 90 min vs 100% for 45 min)? (Determines battery size/cost.).  Battery should have 4.8 KWh capacity.  0.8 Hr runtime at Max load.

Surge requirement — 10 kW surge duration/crest factor expectation? (Affects inverter selection/cost.)  That is acceptable

Enclosure rating — NEMA 1 (indoor) acceptable, or NEMA 3R/4X required? (Cabinet & corrosion protection cost.)  NEMA 1 is acceptable.

Distribution — Six 20 A outputs to hardwired circuits or NEMA 5-20R receptacles? Any GFCI/AFCI needed? (Hardware & labor.).  Just (6) integrated 120 VAC, 20A breakers.  Standard type.

Monitoring — Local HMI only or networked (SNMP/Modbus TCP)? Any cybersecurity controls? (Gateway/licensing/integration.)  Only Local HMI

Compliance level — System-level UL 9540 required, or UL-listed subassemblies acceptable (inverter UL 1741/458, battery UL 1973)? (Certification and model options.)  At minimum, Inverter: UL 1741, Battery: UL 94V-0

Installation scope — Quote supply-only or include on-site install & commissioning as a separate CLIN? (Labor/materials, schedule.)  Supply only

Logistics — Exact ship-to address, dock hours, and need for liftgate/inside delivery/badging? (Freight & site labor.)  Attn: Matt Krupa, US Naval Research Laboratory, Bldg F-14, Key West, FL 33040,  Forklift available.

Schedule — Required delivery date or expedite constraints? (Expedite fees & sourcing.)  6-8 wks

Are you replacing an existing system?  Can you share details on what that system entails so we can find a best fit replacement?  It is not replacing an existing system.

Do you require a rugged, fully isolated solution? Yes

Will this be a 19” rackmounted solution?  Are there any height restrictions?  Unit is wall-mounted. - Unit Dimensions: not to exceed 14” w x 75” h x 12” d.

Is this part of larger potential program need or just a one-off purchase?  One off purchase

Do you expect this will need any NAVSEA S9310 certification for the batteries? We have been certified on few different programs in the past – DCGS-MC, CDN, COC, DDS-M.  Not expected.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

Recipient
Eoi Inc.
UEI
DTKCDS53TB55
CAGE
1MBB2
Vendor location
Lewis Center, OH
Contract
N0017325P0380, purchase order
Obligated
$42,155.84
Actions
1 between September 25, 2025 and September 25, 2025
Competition
Competed Under SAP, 23 offers received
Set-aside reported
Women Owned Small Business
Described as
Battery Backup Systems
Match
solicitation number N0017325QGF30 equals the FPDS solicitation identifier; same awarding office N00173 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 3, 2025

    Combined synopsis and solicitation

    Due September 14, 2025 at 4:00 PM EDT. SAM.gov, notice eb83dc47332e41de88af951ab8e95fe9

    2 revisions on SAM
    • September 11, 2025: publish, combined synopsis and solicitation
    • September 3, 2025: publish, combined synopsis and solicitation
  2. September 11, 2025

    Combined synopsis and solicitation

    Due September 17, 2025 at 12:00 PM EDT. SAM.gov, notice 178c1a5ee0454c3b8de5cc6b6f9165f8

    2 revisions on SAM
    • September 11, 2025: publish, combined synopsis and solicitation
    • September 3, 2025: publish, combined synopsis and solicitation

Points of contact