Sources sought
Columbia Bearing Support Structure
N0016726RCLB1
Department of the Navy, NSWC Carderock. Ship Building and Repairing.
Response deadline
August 7, 2026 at 12:00 PM EDT
Closed 40 days ago. Posted July 16, 2026. Scheduled to archive August 22, 2026.
Description
As published on SAM.gov.
This is not a Request for Proposal and award of a contract will not be made as a result of this Request for Information (RFI). Naval Surface Warfare Center, Carderock Division (NSWCCD) requests assistance from industry for conducting market research for the manufacturing & delivery of the COLUMBIA (CLB) Bearing Support Structure (BSS) Inseparable Assembly. The purpose of this RFI is to conduct market research by soliciting industry comments and feedback.
Market research will determine potential socio-economic small and large businesses interested in, and capable of, providing the support services identified herein. This posting is issued in accordance with the requirements of Federal Acquisition Regulation (FAR) Overhaul Part 10. Responses should include the following:
1. Cover letter, not to exceed one (1) page that includes:
(a) Organization name, CAGE Code, and address (b) Point of contact name and contact information (c) Size and type of organization, including if applicable U.S. small business or other status (d) Brief statement of interest that indicates the organization’s interest in applying as a prime or subcontractor.
2. Interested parties shall provide a response (not to exceed 25 pages) to the following questions:
a) The BSS drawing “COLUMBIA Class BSS Inseparable Assembly, DWG C24521200C” assumes standard weld procedures. Is there an alternative welding method(s) (i.e. Robotic, electron beam, friction stir, electro slag) recommended to be used in the production of the BSS? If yes, please see additional questions provided below:
i. How long do you anticipate to qualify the weld procedures, including Government review time? ii. What inspection methods would be required and are they NAVSEA approved?
b) How will you engage foreign vendors and suppliers of either Monel forgings or Monel ingot?
c) The Government will require all sub-vendors of significant material (over $100,000) to be named. Does this present any hardships?
d) Currently the projected period of performance/required manufacturing timeline for the seven (7) BSS’s in this contract will be 30 months for each BSS. Does this timeline present any hardships? If so, what type of hardships and what would you recommend? The Draft Statement of Work and Drawings/PERs are available as part of this announcement. The drawings and PERs are considered a controlled document and is ONLY available to Contractors with an approved Joint Certification Program (JCP).
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 16, 2026
Sources sought
Due August 7, 2026 at 12:00 PM EDT. SAM.gov, notice 7f31da2f326b484bbf1d9816e8c0dff0
Points of contact
- Abeer Ameerabeer.j.ameer.civ@us.navy.mil3012754537
- Douglas Riedeldouglas.a.riedel.civ@us.navy.mil
Also open from this buyer
- Procurement request for Landing Craft Air Cushion (LCAC) 100 Class Composite Propeller Blade AnalysisCombined synopsis and solicitationNAICS 541330N0016726Q1156Closes todaySep 16
- Neutron Probe TrainingCombined synopsis and solicitationSmall businessNAICS 334519N0016726Q1165Closes tomorrowSep 17
- Customize Power ModulePresolicitationSmall businessNAICS 335999CD-73-0028Closes in 2 daysSep 18
- Ref. 1177 - APD Parts ObsolescenceSources soughtNAICS 334519REF_1177-APD_PARTS_OBSOLESCENCECloses in 7 daysSep 23
- N00167-C0231-OSA2026Sources soughtNAICS 541330N00167-C0231-OSA2026Closes in 12 daysSep 28