Skip to content
  • 8,092 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation

CIRCUIT CARD ASSEMB

N0010426QSC60

Department of the Navy, NAVSUP Weapon Systems Support Mech. Bare Printed Circuit Board Manufacturing.

Response deadline

April 20, 2026 at 6:00 PM EDT

Closed 202 days ago. Posted April 14, 2026. Scheduled to archive May 5, 2026.

Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities

This one closed in 2026

140 like it are open now in bare printed circuit board manufacturing

  • CIRCUIT CARD ASSEMB

    Department of the Navy, NAVSUP Weapon Systems Support Mech

    SolicitationNAICS 334412Anywhere in the USN0010427QDA06
    Closes tomorrowNov 9
  • CIRCUIT CARD ASSEMB

    Department of the Navy, NAVSUP Weapon Systems Support Mech

    SolicitationNAICS 334412Anywhere in the USN0010427QSA07
    Closes tomorrowNov 9
  • CIRCUIT CARD ASSEMB

    Defense Logistics Agency, DLA Aviation at Philadelphia, PA

    SolicitationNAICS 334412Anywhere in the USSPRPA126QYD19
    Closes tomorrowNov 9

All 140 open in bare printed circuit board manufacturing

Description

As published on SAM.gov.

SOLICITATION NOTES:
All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be
issued bilaterally, requiring the contractor's written acceptance prior to
execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 80 days
Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset
Visibility (CAV) Statement of Work.
Your quote should include the following information:
***************QUOTE AMOUNT AND RTAT ***************
Unit Price:__________
Total Price:__________
Repair Turnaround Time (RTAT): _______ days
If your company is not quoting the Government's Required Repair Turnaround
Time (RTAT) or earlier, provide your company's capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement
is measured from asset Return to the date of asset acceptance under the terms
of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in
the Action Date entry in the Commercial Asset Visibility (CAV) system. In
accordance with the CAV Statement of Work, the contractor is required to
accurately report all transactions by the end of the fifth regular business
day after receipt and the Action Date entered in CAV must be dated to reflect
the actual date of physical receipt. The Contractor must obtain final
inspection and acceptance by the Government for all assets within the RTATs
established in this contract.
*Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___
*Return Material Authorization # (RMA), if applicable:__________
*Delivery Vehicle (if Delivery Order requested) (if your company has a current
BOA/IDIQ, for example) :__________________
***************TESTING AND EVALUATION IF BEYOND REPAIR***************
* T&E fee/price (if asset is determined BR/BER): If an item is determined BR,
and the contractor provides documentation that costs were incurred during
evaluation and determination of BR, the contracting officer will negotiate a
reduced contract price, not-to exceed (NTE) $___________associated with the
repair effort to reflect the BR status of the equipment.
* The T&E fee (if asset is determined BR/BER) was determined/computed based
on:______________________________________.
***************AWARDEE INFO & PERFORMANCE LOCATION***************
Awardee CAGE: __________
*Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________
* Facility/Subcontractor CAGE (where the asset should be shipped), if not same
as ""awardee CAGE"":__________
*************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************
*New unit price:__________
*New unit delivery lead-time:__________
The Government intends to add an option quantity to the resultant contract.
In reference to the option quantity, the Government may increase the quantity
of supplies called for in the Schedule at the unit price specified. The
Contracting Officer may exercise the option by written notice to the
Contractor within the number of days in FAR 52.217-6 herein. Delivery of the
added items shall continue at the same rate as the like items called for under
the contract, unless the parties otherwise agree.
IMPORTANT NOTE: Any asset for which the contractor does not meet the required
RTAT will incur a price reduction per unit/per month the contractor is late -
any delay determined to be excusable (e.g. Government Delay) will not result
in a price reduction. If a price reduction is required due to unexcusable
contractor delay, the Contracting Officer will implement the aforementioned
price reduction via a ""reconciliation modification"" at the end of the
contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet
required RTATs, including but not limited to the Government's right to
terminate for default.
In reference to the above important note, the contractor provides the
following price reduction amount per unit per month the contractor does not
meet the RTAT: 1% of unit price, per unit, per month.
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
POC EMAIL: BRETT.A.DEPALMA.CIV@US.NAVY.MIL

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 14, 2026

    Solicitation

    Due April 20, 2026 at 6:00 PM EDT. SAM.gov, notice 7ccce951d8244df09456e4c9a3c7090d

    1 revisions on SAM
    • April 14, 2026: publish, solicitation

Points of contact