Award notice, first published as solicitation
PUMP UNIT,CENTRIFUG-IN REPAIR/MODIFICATION OF
N0010426QJB31
Department of the Navy, NAVSUP Weapon Systems Support Mech. Measuring, Dispensing, and Other Pumping Equipment Manufacturing.
Awarded
$26,350.00 obligated so far on USAspending
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one was awarded in 2026
41 like it are open now in measuring, dispensing, and other pumping equipment manufacturing
- Hydraulic Fluid Bulk Dispensing Unit
Department of the Navy, NAVAIR Warfare CTR Aircraft Div
Sources soughtNAICS 333914Anywhere in the USN6833527Q1002Closes tomorrowNov 4 - CYLINDER,PUMP
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 333914Anywhere in the USN0010426QFC81Closes tomorrowNov 4 - SEAL ASSEMBLY,SHAFT,SP
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationNAICS 333914Anywhere in the USSPE4A527T2005Closes in 2 daysNov 4
All 41 open in measuring, dispensing, and other pumping equipment manufacturing
Description
As published on SAM.gov with the solicitation of April 22, 2026.
** CASREP ** ACCELERATED DELIVERY IS ENCOURAGED AND ACCEPTED AT NO ADDITIONAL
COST TO GOVERNMENT.
All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be
issued bilaterally, requiring the contractor’s signed acceptance prior to
execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 110 days
Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset
Visibility (CAV) Statement of Work.
Your quote should include the following information:
***************QUOTE AMOUNT AND RTAT ***************
* Unit Price:__________
* Total Price:__________
* Repair Turnaround Time (RTAT): _______ days
If your company is not quoting the Government’s Required Repair Turnaround
Time (RTAT) or earlier, provide your company’s capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement
is measured from asset Return to the date of asset acceptance under the terms
of the contract. For purposes of this section, Return is defined as physical
receipt of the F-condition asset at the contractor’s facility as reflected in
the Action Date entry in the Commercial Asset Visibility (CAV) system. In
accordance with the CAV Statement of Work, the contractor is required to
accurately report all transactions by the end of the fifth regular business
day after receipt and the Action Date entered in CAV must be dated to reflect
the actual date of physical receipt. The Contractor must obtain final
inspection and acceptance by the Government for all assets within the RTATs
established in this contract.
* Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___
* Return Material Authorization # (RMA), if applicable:__________
* Delivery Vehicle (if Delivery Order requested) (if your company has a
current BOA/IDIQ, for example) :__________________
*** IF ITEM NOT PREVIOUSLY PURCHASED BY NAVSUP WSS - or - PRICES INCREASED ***
* Provide the NSN of a similar item or, if current NSN is an upgrade part,
provide the previous NSN.
* If previously sold to another buying activity or in the commercial
marketplace, provide a copy of your company’s invoice (redacted versions are
acceptable).
* If pricing is not in line with historical pricing, provide the basis of your
company’s pricing.
***************TESTING AND EVALUATION IF BEYOND REPAIR***************
* T&E fee/price (if asset is determined BR/BER): If an item is determined BR,
and the contractor provides documentation that costs were incurred during
evaluation and determination of BR, the contracting officer will negotiate a
reduced contract price, not-to exceed (NTE) $___________associated with the
repair effort to reflect the BR status of the equipment.
* The T&E fee (if asset is determined BR/BER) was determined/computed based
on:______________________________________.
***************AWARDEE INFO & PERFORMANCE LOCATION***************
* Awardee CAGE: __________
* Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________
* Facility/Subcontractor CAGE (where the asset should be shipped), if not same
as ""awardee CAGE"":__________
*************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************
* New unit price:__________
* New unit delivery lead-time:__________
The Government intends to add an option quantity to the resultant contract.
In reference to the option quantity, the Government may increase the quantity
of supplies called for in the Schedule at the unit price specified. The
Contracting Officer may exercise the option by written notice to the
Contractor within the number of days in FAR 52.217-6 herein. Delivery of the
added items shall continue at the same rate as the like items called for under
the contract, unless the parties otherwise agree.
IMPORTANT NOTE: Any asset for which the contractor does not meet the required
RTAT will incur a price reduction per unit/per month the contractor is late -
any delay determined to be excusable (e.g. Government Delay) will not result
in a price reduction. If a price reduction is required due to inexcusable
contractor delay, the Contracting Officer will implement the aforementioned
price reduction via a ""reconciliation modification"" at the end of the
contract performance. Price reductions made pursuant to this section shall
not limit other remedies available to the Government for failure to meet
required RTATs, including but not limited to the Government’s right to
terminate for default.
In reference to the above important note, the contractor provides the
following price reduction amount per unit per month the contractor does not
meet the RTAT: $__________, up to a maximum of: $_________.
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
POC EMAIL: ALEXANDER.S.CRAFT.CIV@US.NAVY.MIL
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 3.01_RFQ_Solicitation_N0010426QJB31_26104-0170.pdf632 KB, April 22, 2026
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Carver Pump Company
- UEI
- W547TUQXJ8Y4
- CAGE
- 10941
- Vendor location
- Muscatine, IA
- Contract
- N0010426PJB64, purchase order
- Obligated
- $26,350.00, potential $52,700
- Actions
- 1 between May 5, 2026 and May 5, 2026
- Competition
- Not Competed Under SAP, 1 offer received
- Set-aside reported
- No Set Aside Used.
- Described as
- Pump Unit,centrifug
- Match
- award number N0010426PJB64 equals the contract number; same awarding office N00104 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 22, 2026
Solicitation
PUMP UNIT,CENTRIFUG
Due April 30, 2026 at 4:00 PM EDT. SAM.gov, notice 2d60f67036294f15b920eed20bae81b5
2 revisions on SAM
- May 6, 2026: publish, award notice
- April 22, 2026: publish, solicitation
May 6, 2026
Award notice, originally solicitation
Awarded to Carver Pump Company for $52,700. SAM.gov, notice 9f46d733fb854833ac24e2df5b824dc4
2 revisions on SAM
- May 6, 2026: publish, award notice
- April 22, 2026: publish, solicitation