Award notice, first published as presolicitation
PUMP UNIT,CENTRIFUG
N0010425RZB25
Department of the Navy, NAVSUP Weapon Systems Support Mech. Measuring, Dispensing, and Other Pumping Equipment Manufacturing.
Awarded
Curtiss-Wright Electro-Mechanical Corporation
$1,830,190.10 obligated so far on USAspending
Description
As published on SAM.gov with the solicitation of February 17, 2025.
CONTACT INFORMATION|4|N742.11|WT2|717-605-7574|ashton.k.perry.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001|ONE (1)|365 days|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Certifications - Stand-Alone Receiving Report; Material - Receiving Report & Invoice Combo|Material - Inspect & Accept at Source|TBD|N00104|TBD|Certifications - N45404; Material - TBD|TBD|TBD|N/A|N/A|N/A|Certif ications - N45404|N/A|N/A|See form DD1423|1-866-618-5988 - WAWF Helpdesk| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2025)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|13|333914|750|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| TYPE OF CONTRACT (APR 1984)|1|Firm-Fixed Price (FFP)| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2|X|| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA (MAY 2024))|1|| 1. This is a procurement in support of the TRIPER program.
2. As this procurement is for the TRIPER program , in accordance with FederalLaw, DoD and Navy policy, and in conjunction with the Defense Priorities andAllocation System, this contract shall be rated DX.
3. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be issued by the Government when copies are either deposited inthe mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Governments acceptance of the contractors proposalconstitutes bilateral agreement to issue contractual documents as detailedherein.
4. As this is a TRIPER item, approval of certifications by SUBMEPP (N45404)prior to shipment of material will be required. 5. If requirement will be packaged at a location different from the offeror'saddress, the offeror shall provide the name, address, and CAGE of the facility.
6. This award will be issued bilaterally, requiring the contractor's writtenacceptance prior to execution. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the PUMP UNIT,CENTRIFUG . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence.
Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Design, Manufacture, and Performance - The item furnished under this contract/purchase order must meet the design, manufacture, and performance requirements specified on CAGE ;0UBG9; , Drawing ;RW-166264, RW-166262, RY-166400 & RY-166401; and the applicable SUBMEPP Procurement Instruction ;563C-012-0002 Rev ? Chg.
1 (CSD600); , except as amplified or modified herein. 3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD600; in ECDS at https://register.nslc.navy.mil/ 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- UEI
- WYDAKCJ5K219
- CAGE
- 0UBG9
- Vendor location
- Bethlehem, PA
- Contract
- N0010425FZU03 under N0010423GZU01, delivery order
- Obligated
- $1,830,190.10
- Actions
- 2 between August 12, 2025 and September 4, 2025
- Competition
- Not Competed, 1 offer received
- Set-aside reported
- No Set Aside Used.
- Described as
- Pump Unit,centrifug
- Match
- award number N0010425FZU03 equals the contract number; same awarding office N00104 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 9, 2025
Presolicitation
Due February 9, 2025 at 11:00 PM EST. SAM.gov, notice 29d0f075a309491fb63b359bf3d6d461
February 17, 2025
Solicitation
Due March 3, 2025 at 1:00 PM EST. SAM.gov, notice f1c22cc82a26449b92bcf9ed167da1e4
August 13, 2025
Award notice
Awarded to Curtiss-Wright Electro-Mechanical Corporation for $1,830,190. SAM.gov, notice 6df9ec094bd846b7946936b64af173c7
Points of contact
- MICHAEL THOMAN, N742.6, PHONE (717)605-4608, FAX (717)605-4236, EMAIL MICHAEL.E.THOMAN2.CIV@US.NAVY.MILMICHAEL.E.THOMAN2.CIV@US.NAVY.MIL
Also open from this buyer
- BEARING CARTRIDGE ASolicitationNAICS 332991N0010426RZB69Closes tomorrowSep 17
- ELPI ASSEMBLYSolicitationNAICS 333998N0010426QYA3JCloses tomorrowSep 17
- ELECTRONIC COMPONENSolicitationNAICS 334412N0010426QNE62Closes tomorrowSep 17
- CONTROL MODULESolicitationNAICS 334290N0010426QSD42Closes tomorrowSep 17
- POWER SUPPLYSolicitationNAICS 335931N0010426QXC10Closes tomorrowSep 17