Skip to content
Abierto

Solicitation

PUMP,CENTRIFUGAL

N0010425QSD43

Department of the Navy, NAVSUP Weapon Systems Support Mech. Measuring, Dispensing, and Other Pumping Equipment Manufacturing.

Awarded

Carver Pump Company

$3,000.00 obligated so far on USAspending

Description

As published on SAM.gov.

All freight is FOB Origin.\\ This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor’s written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. \\ The Government is seeking a Repair Turnaround Time (RTAT) of:

200 days\ Government Source Inspection (GSI) is required.\ Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.\\ Your quote should include the following information:\\

QUOTE AMOUNT AND RTAT

\ • Unit Price:

\ • Total Price:

\ • Repair Turnaround Time (RTAT):

days\\ If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints?\

\

\

\ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor’s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.

In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. \\ *Check one: Firm-fixed-Price

Estimated

Not-to Exceed (NTE):

\ *Return Material Authorization # (RMA), if applicable:

\\ *Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :

\\

TESTING AND EVALUATION IF BEYOND REPAIR

\ * T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $

associated with the repair effort to reflect the BR status of the equipment.\ * The T&E fee (if asset is determined BR/BER) was determined/computed based on:

.\\

AWARDEE INFO & PERFORMANCE LOCATION

\ • Awardee CAGE:

\ *Inspection & Acceptance CAGE, if not same as ""awardee CAGE"":

\ * Facility/Subcontractor CAGE (where the asset should be shipped), if not same as ""awardee CAGE"":

\\

IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW

\ *New unit price:

\ *New unit delivery lead-time:

\\ The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein.

Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. \\ IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction.

If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a ""reconciliation modification"" at the end of the contract performance.

Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. \ In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: 1% of unit price, per unit, per month.\\

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
W547TUQXJ8Y4
CAGE
10941
Vendor location
Muscatine, IA
Contract
N0010426PSA37, purchase order
Obligated
$3,000.00
Actions
2 between February 2, 2026 and May 28, 2026
Competition
Not Competed Under SAP, 1 offer received
Set-aside reported
No Set Aside Used.
Described as
Pump,centrifugal
Match
solicitation number N0010425QSD43 equals the FPDS solicitation identifier; same awarding office N00104 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. October 9, 2025

    Solicitation

    Due August 11, 2025 at 4:00 PM EDT. SAM.gov, notice bc369f99d2504bb9a4022663864bbb4d

Points of contact