Skip to content
Abierto

Solicitation

VALVE,BUTTERFLY

N0010424QLB36

Department of the Navy, NAVSUP Weapon Systems Support Mech. Other Metal Valve and Pipe Fitting Manufacturing.

Response deadline

January 29, 2024 at 4:30 PM EST

Closed 962 days ago. Posted January 16, 2024, first published January 9, 2024. Scheduled to archive February 13, 2024.

Description

As published on SAM.gov.

CONTACT INFORMATION|4|N713.34|GLM|717-605-3020|EMMA.J.HIPPENSTEEL.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO||TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| EQUAL OPPORTUNITY (SEP 2016)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC (NOV2023))|5|||||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2023))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|332919|750 EMP|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ The government drawings for this requirement will be posted to contract opportunities for all potential sources to submit a quotation since this is a full and open requirement allowing all sources to quote in regards to the drawing.

The subject solicitation is for a head of family NIIN requirement, therefore it will be awarded under a new folder once offers are evaluated and a new NSN is established. All freight is FOB Origin. This RFQ is for a buy. The resultant award of this solicitation will be issued bilaterally, requiring the contractors written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. Government source inspection is required.

Unit Price:

FIRM Total Price:

FIRM Procurement Turnaround Time (PTAT):

Awardee CAGE:

Inspection & Acceptance CAGE, if not at source:

Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :

Important Traceability Notice: If you are not the manufacturer of the material you are offering, you must provide a letter/official email from the OEM confirming your company is authorized an authorized distributor of their items.

Option Remarks: The Contract Officer would like to exercise a 100% option quantity within365-days of the effective date of the contract award. The contractor willprovide the same delivery turnaround as the base line items. A modificationwill be completed at the time the option is exercised and all current contract terms and conditions will apply to the option quantity. Please indicate if the Contracting Officer may exercise the 100% optionquantity for the procurement contract. Yes

or No

Please indicate the pricing for the option quantity.

Price Each: $

\ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the VALVE,BUTTERFLY .

2. APPLICABLE DOCUMENTS DRAWING DATA=1749102 |53711| C| |D|0001 | C|49998|1432827 DOCUMENT REF DATA=MIL-STD-130 | | |M |051202|A| | | DOCUMENT REF DATA=MIL-V-24624 | | | |840213|A| 1| | |Y|16 |061213 3. REQUIREMENTS 3.1 ;NSN 4820 013542563 IS A GENERIC HEAD AND ALL OFFERS SHOULD BE PRESENTED WITH THEIR OWN ASSOCIATED NSN AND PART NUMBERS.; 3.2 Qualification Requirements - The item furnished under this contract/purchase order shall be products which qualified for listing on Qualified Products List (QPL) ;QPL-24624; .

Only those Offerors whose products have been approved for inclusion on the QPL will be considered. 3.3 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV K, 15 JAN 00.; .

3.4 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order.

When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation.

When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:

Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.

Code 2: Assembly (or set or kit) not furnished - Used following detail parts.

Code 3: Part not furnished separately - Use assembly.

Code 4: Part redesigned - Old and new parts are completely interchangeable.

Code 5: Part redesigned - New part replaces old. Old part cannot replace new.

Code 6: Part redesigned - Parts not interchangeable. 3.5 Design, Manufacture, and Performance - Except as modified herein, the VALVE,BUTTERFLY furnished under this contract/purchase order shall meet the design, manufacture, and performance requirements specified on drawing ;81349 MIL-V-24624 80064 804-1749102; cage ;R8 W/GEAR OPR VALVE, BUTTERFLY; . 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order.

The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order.

Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 9, 2024

    Solicitation

    Due January 29, 2024 at 3:30 PM EST. SAM.gov, notice 2d5ad9fb118144a693e99b16140a9915

  2. January 16, 2024

    Solicitation

    Due January 29, 2024 at 4:30 PM EST. SAM.gov, notice f5c724370e554e9db826b28ebf0afd13

Points of contact