Combined synopsis and solicitation, first published as sources sought
E-2D Precision Approach Landing Capability (PALC) A-Kit Manufacture and Delivery
N00019-26-RFPREQ-TPM231-0450
Department of the Navy, Naval Air Systems Command. Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Response deadline
September 23, 2026 at 5:00 PM EDT
Closed 39 days ago. Posted September 23, 2026, first published August 6, 2026. Scheduled to archive October 8, 2026.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed 39 days ago
538 like it are open now in other aircraft parts and auxiliary equipment manufacturing
- F/A-18E/F Infrared Search and Track (IRST) Block II System Surrogate Aft Electronics Assemblies in support of Navy Operational Test Program Sets (OTPS)
Department of the Navy, Naval Air Systems Command
Sources soughtNAICS 336413Anywhere in the USN00019-26-RFPREQ-TPM265-0867Closes in 5 daysNov 6 - Lifetime Buy (LTB) - Xeon D-1559 processor
Department of the Navy, Naval Air Systems Command
Sources soughtNAICS 336413Anywhere in the USN00019-26-RFPREQ-TPM265-1060Closes in 5 daysNov 6 - Lifetime Buy (LTB) - Data Device Corp: Resolver-to-digital Converter Hybrid IC
Department of the Navy, Naval Air Systems Command
Sources soughtNAICS 336413Anywhere in the USN00019-26-RFPREQ-TPM265-1061Closes in 5 daysNov 6
All 538 open in other aircraft parts and auxiliary equipment manufacturing
Description
As published on SAM.gov.
The Naval Air systems command (NAVAIR), Patuxent River, Maryland intends to negotiate an award a sole source contract for the manufacturing, delivery, and support of the Precision Approach Landing Capability (PALC) AN/APN-246 A-Kits for the entire E-2D fleet, including all initial spares. The A-Kit will consist of: (1) antenna(s); (2) harness; (3) mounting tray; (4) power on switch; and (5) accessories. This A-Kit design is currently being developed under a separate, Non-Recurring Engineering (NRE) contract. This manufacturing project shall not last longer than the existing NRE contract. This effort includes, but is not limited to the manufacture, assembly, and delivery of A-kits for the installation on E-2D Aircraft. The Period of Performance (POP) for this contract is 36 months. The first delivery of retrofit A-Kits is required by 1 November 2027. Additional A-Kit deliveries throughout the POP are required in planned increments for both retrofit and spares to outfit the complete E-2D Fleet and source spares for the fleet.
Currently, Northrop Grumman (NG) id the only company that Has the ability, resources, technology, and documentation necessary to develop, produce, maintain, and support this system without causing unacceptable delays in meeting the navy's operational requirements. THIS IS NOT A REQUEST FOR COMPETTIVE PROPOSALS AND NO COMPETTIVE SOLICAIATION WILL BE ISSED. This Acquisition is being pursued on a sole source basis under the authority permitting other than full and open competition Title 10, U.S. Code 2304(c) (1), as implemented by Federal Acquisition Regulation 6.103-1, “Only one responsible source and no other supplies or series will satisfy agency requirements. There is no commitment by the Government to issue a solicitation, make an award or awards, or be responsible for any money expended by interested parties before award or a contract for the effort described above. Information provided herein is subject to change and in no way binds the Government to solicit or award a contract.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 6, 2026
Sources sought
Due August 6, 2026 at 5:00 PM EDT. SAM.gov, notice bb99ea5f5ad74792b1fb0b9f3f70bb9b
2 revisions on SAM
- September 23, 2026: publish, combined synopsis and solicitation
- August 6, 2026: publish, sources sought
September 23, 2026
Combined synopsis and solicitation, originally sources sought
Due September 23, 2026 at 5:00 PM EDT. SAM.gov, notice 81c3044c46eb4ad4ab0ddd7026066f18
2 revisions on SAM
- September 23, 2026: publish, combined synopsis and solicitation
- August 6, 2026: publish, sources sought
Points of contact
- Dariusz McKenziedariusz.m.mckenzie.civ@us.navy.mil
- Brittany Reynoldsbrittany.s.reynolds3.civ@us.navy.mil