Building 311 2nd Floor HVAC Renovation Naval Support Activity, Mechanicsburg, Pennsylvania

ML-23-56

Department of the Navy, Navfacsyscom Mid-Atlantic. Commercial and Institutional Building Construction.

Awarded

Belt Built Contracting, LLC

$212,142.61 obligated so far on USAspending, September 26, 2023, contract N4008523F6787

Description

As published on SAM.gov.

The use of the indicated brand name programmable building controllers in Section 2 will be required for all projects providing programmable building controllers that will be connected to the identified (existing or currently under development) installation networked FRCS commonly referred to as the Mechanicsburg EMCS.

Building-level Programmable controllers are categorized as FRCS's and include, but are not limited to, network controllers and routers, digital controllers, zone controllers, variable air volume controllers, unitary and equipment controllers, and expansion modules.

Network-capable programmable digital controllers include, but are not limited to network controllers and routers, building level supervisory controllers, zone controllers, variable air volume controllers, unitary and equipment controllers, and expansion modules. It does not include the physical system components (such as air handling units, chillers, boilers, condensing units, actuators, dampers, wiring, and similar).

The Specified Manufacturers and Product Lines controllers will be configured and programmed using Government-licensed software from the respective Specified Manufacturer[s]. This requirement does not restrict who can install, commission, test, maintain, or operate the controllers, and there are Several known sources who can provide such services.

The total estimated value for the use of Specified Manufacturers and Product Lines equipment through 30 May 2026 is-based on the estimated number of projects expected to utilize this equipment. The cost of programmable building controllers typically represents approximately 20 percent of the cost of the total controls installation effort, and is a miniscule percentage of the total cost of any building construction effort.

All required programmable building controllers are authorized under this CJ&A regardless of method of execution or procurement strategy (i.e., contracted, in-house shop forces, base operating support contracts, or materials supply chain .contractor).

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
L3PEDEHACZY3
CAGE
68J60
Vendor location
Crofton, MD
Contract
N4008523F6787 under N4008520D0159, delivery order
Obligated
$212,142.61, current value $8,581,604
Actions
3 between July 21, 2024 and February 10, 2026
Competition
Full and Open Competition After Exclusion of Sources, 5 offers received
Described as
B311 2ND Floor HVAC Renovation, Naval Support Area, Mechanic. Modification to Incorporate PC 02 (No Cost Time Extension). the Contract Completion Date (Ccd) Has Been Revised from 12 May 2025 to 4 August 2025.
Match
award number N4008523F6787 equals the contract number; same awarding office N40085 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 31, 2024

    Justification, originally combined synopsis and solicitation

    SAM.gov, notice 62753f78c3714b3f9193065add9e3eb9

Points of contact