Combined synopsis and solicitation
BK27 IPC Base Life Support (BLS) Service in Philippines (Amendment 1)
M68450-26-Q-H006
Department of the Navy, Commanding General. Facilities Support Services.
Response deadline
August 9, 2026 at 11:59 AM EDT
Closed 84 days ago. Posted August 7, 2026, first published August 4, 2026. Scheduled to archive August 24, 2026.
Get the next one like this from Department of the Navy by email, the day it is posted.Find my opportunities
This one closed in 2026
36 like it are open now in facilities support services
- Türkiye Base Operations Support Acquisition (T-BOS)
Department of the Air Force, FA5641 764 Ess PK
PresolicitationNAICS 561210Outside the USFA564126R0005Closes todayNov 1 - Indefinite Delivery/Indefinite Quantity (IDIQ) Custodial, Pest Control, and Grounds Maintenance Service Contract at U.S. Marine Corps Air Station (MCAS) Iwakuni, Japan
Department of the Navy, Navfacsyscom FAR East
SolicitationNAICS 561210Outside the USN4008426R1026Closes in 2 daysNov 3 - Vehicle Maintenance for Daegu, Gimhae, Gwangju, Suwon, and Cheongju
Department of the Army, 0411 Aq HQ Contract Aug
Sources soughtNAICS 561210Location not publishedW91QVN27RA993Closes in 10 daysNov 11
Description
As published on SAM.gov.
Amendment 1:
See attached “D1. Performance Work Statement (PWS) (Amendment 1)” and “D1. Solicitation M68450-26-Q-H006 BK27 IPC BLS (Amendment 1)” for detail.
Required lead time: changed from “equal or shorter than 7 days” to “equal or shorter than 5 days”.
The rental requirement of “room dividers” has been removed, and the 5-ton forklift has been replaced by 1-ton forklift.
After careful consideration, the contracting officer shortened the required lead time to ensure enough time for quotes evaluation. Thank you very much for your understanding.
Questions and Answers:
Question 1: Room dividers - what is the preferred height and acceptable minimum/maximum height range?
Answer: removed “room dividers” from the BLS requirement.
Question 2: For Material handling equipment (5 Ton forklift), is flight line access needed inside the airport?
Answer: Will not be used on flight line. However, the area the forklift will be used in has some trees that cannot be removed, therefore requires 1-ton forklift to work around the trees. Forklift larger than 1-ton forklift will not be technically acceptable. Contractor must provide the fuel necessary for the forklift to operate.
Question 3: Forklift hours – Does the Operators and equipment need to be available 24 hours on Call?
Answer: Operation hours will be limited to 0800-1800. “24-hours on call” is not required.
Question 4: Hazardous waste – what is the Hazardous Waste Generator (HWG) ID?
Answer: Unable to provide. The Government Technical Point of Contact (TPOC) currently does not have the answer.
Question 5: MHE operations – what are the necessary lifting accessories?
Answer: Only lifting accessories necessary will be fork extenders, which the government TPOC will provide.
Question 6: Summary of the Requirements –
• Generator Fuel - 2 drums x 50gallons
• 1-ton Forklift
• Hazmat Collection
Room Dividers are removed from the requirement. They are no longer needed.
RFQ/Solicitation Number: M68450-26-Q-H006
RFQ Date: 4 Aug 2026 (California time), Amendment 1 date: 7 August 2026 (California time)
PROJECT: Base Life Support Service for BK27 IPC (Generator Fuel, Room Divider rental, HAZMAT collection & MHE)
QUESTION CLOSE: 7 Aug 2026 at 11:59 pm [Philippines standard time]
RFQ CLOSE: 9 Aug 2026 at 11:59pm [Philippines standard time]
Period of Performance: see attached Performance Work Statement (PWS) (Amendment 1).
Location: Philippines, see attached PWS (Amednment 1).
This is a Request for Quote. This is NOT an order. This document is not legally binding and does not commit the US Government in anyway.
Upon completion of this quote, please email your response to both Capt Annie A. Berg at annie.berg@usmc.mil and SSgt Liu, Jacie at jacie.liu@usmc.mil. All quotes are due to the Contracting Officer no later than 9 Aug 2026 at 11:59pm [Philippines standard time]. Quotes may not be accepted past the RFQ close date & time specified unless determined to be in the best interest of the Government by the Contracting Officer.
General Requirements. Quotes shall consist of, at a minimum:
1.Completed this Solicitation document with all required information filled. All yellow highlighted ares needs to be completed by quoters. RFQ with required information and applicable representations and certifications.
• Contractor information on the first page.
• Total amount, lead time, signature and date on the first page.
• Check “[ ] does or [ ] does not” in provision 52.204-26
• Check “[ ] does or [ ] does not” in provision 252.204-7016
• Check “[ ] will or [ ] will not” in provision 252.204-7017
2. One page quotation in PDF form.
3. Provide a 1-2 page service plan/technical capability statement, providing specifications of all BLS services outlined within the PWS throughout the period of performance.
4. Completed FORIEGN VENDOR INFORMATION FORM.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- D1. Solicitation M68450-26-Q-H006 BK27 IPC BLS.pdf266 KB, August 4, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 4, 2026
Combined synopsis and solicitation
BK27 IPC Base Life Support (BLS) Service in Philippines
Due August 9, 2026 at 11:59 AM EDT. SAM.gov, notice 600e2a008c8e4a0096d2a2ad55631ce0
2 revisions on SAM
- August 7, 2026: publish, combined synopsis and solicitation
- August 4, 2026: publish, combined synopsis and solicitation
August 7, 2026
Combined synopsis and solicitation
Due August 9, 2026 at 11:59 AM EDT. SAM.gov, notice 250dc70014a54ba9b22f652068840f42
2 revisions on SAM
- August 7, 2026: publish, combined synopsis and solicitation
- August 4, 2026: publish, combined synopsis and solicitation
Points of contact
- Jacie Liujacie.liu@usmc.mil7607635760
- Annie Bergannie.berg@usmc.mil