Solicitation, total small business set-aside
ALS Lead Shielding Panels
JS-2025-003
Department of Energy, Berkeley Natl Lab - DOE Contractor. Fabricated Structural Metal Manufacturing.
Response deadline
July 16, 2025 at 6:00 PM EDT
Closed 428 days ago. Posted July 9, 2025, first published May 5, 2025. Scheduled to archive July 31, 2025.
Description
As published on SAM.gov.
Amendment 3 is hereby issued to this RFP on July 9, 2025 to extend the Proposal Due Date until July 16, 2025. All other terms of this RFP remain the same. Please ensure that you have reviewed all prior Amendments and all attachments hereto. Submissions must be in accordance with Section 2 (SOLICITATION RESPONSE REQUIREMENTS AND EVALUATION FOR AWARD) of RFP-BVSS-JS-2025-003.pdf attached hereto. Failure to submit the required Cover Letter, Technical Volume, Business Volume and any other requested documentation may render your submission nonresponsive.
Amendment 2 is hereby issued to this RFP on June 27, 2025 to:
1. Revise "06 AL-1790-6401A ALS-U SR New Lead Panel Structural Steel Sheet List" to DRAFT REV. B 2. Revise "08 AL-1791-1369B Statement of Work" to DRAFT REV. C 3. Revise "09 Attachment A ALS Lead Shielding Panel Pricing and Delivery Matrix" to REV. 1 *PLEASE ENSURE Attachment A REV. 1 is the document included with you finalized RFP submission* 4. Revise "10 Sample SubK Lead Shielding Panels" to REV. 1 5. Add "ALS Lead Shielding - Basis of Design AL-1816-3759" *The DRAFT Documents noted above are presently routing through LBNL internal approvals process and are not anticipated to change under a finalized award. Below is a brief summary of the specific changes to the Statement of Work:
1. Removed the potential for a (2) batch or (2) award approach. LBNL now intends to make (1) award for the complete lot of panels.
2. Addition of consultation services during installation.
3. Updates to the schedule.
4. Clarified that the current drawings are at the 95% design stage. 5 . Minor language clarifications throughout. All other terms of this RFP remain the same.
Amendment 1 is hereby issued to this RFP on June 10, 2025 to extend the Proposal Due Date until July 9, 2025. An Amendment 2 will be issued on or about June 27, 2025 to accomplish the following 2 Items in additional detail: Item 1) Clarify that the design drawing set provided by LBNL is currently at 95% completion, not 100%. LBNL will issue 100% drawings based on subcontractor recommendations as described in SOW Section 3.2.1.1.
Additionally, the panel widths in the 100% drawings may increase or reduce in size by up to 1” based on as-built measurements being performed by LBNL; height and thickness of the panels will remain unchanged. Item 2) Add project management support scope - to be further defined in the revised SOW - as a priced option after panel delivery. This support would cover consultation during installation and panel handling & storage requirements.
Changed Primary Point of Contact to Arielle Anoop. June 23, 2025 Adding Vendor Q & A 6 from Vendor Drawing Meeting June 9 , 2025 please reference attachments Adding Video of Vendor Drawing only questions June 4, 2025 please reference attachments Vendor Q&A Question 5 is added as of June 3, 2025 - please reference attachments Vendor Q&A Question 4 is added as of May 21, 2025 - please reference attachments Vendor Q&A Questions 2 & 3 are added as of May 20, 2025 - Please reference attachments Vendor Q&A Question 1 is added as of May 14, 2025 - please reference attachments
Project Definition – ALS-U Storage Ring Lead Panel Shielding Completion of 95% Drawings. Fabricate and install new lead panels to the inside face of the storage ring outer precast walls to improve radiation shielding performance. This project is part of the Advanced Light Source. Upgrade storage ring shielding.
The structural design and anchorage detailing for the new lead shielding panels is based on the current ASCE 7-16, California Building Code (CBC), 2019 edition, Part 10 (California Existing Building Code, University of California Seismic Safety Policy, Geotechnical Data and Interpretation Report and Site-Specific Seismic Hazard Analyses and Development of Design Ground Motions Report. The seismic analysis and retrofit design of the existing structure have been performed in a previous task.
The design considers the combination of gravity and seismic loading resisted by the anchorage to the precast walls. Please reference attached documetation for additional infromation.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 5, 2025
Solicitation
Due June 15, 2025 at 6:00 PM EDT. SAM.gov, notice 1f1857b251944ba3abe887db82e31757
May 14, 2025
Solicitation
Due June 15, 2025 at 6:00 PM EDT. SAM.gov, notice 130b570dda31487cbf63ef55d8d55934
May 20, 2025
Solicitation
Due June 15, 2025 at 6:00 PM EDT. SAM.gov, notice c707c2d18aae47a1a89bffadf8b62a34
May 21, 2025
Solicitation
Due June 15, 2025 at 6:00 PM EDT. SAM.gov, notice 127ec878e5cd41faba60d7c8ff6f77c6
June 3, 2025
Solicitation
Due June 15, 2025 at 6:00 PM EDT. SAM.gov, notice 159789df20ad4cbaae6f39f96e87732f
June 4, 2025
Solicitation
Due June 15, 2025 at 6:00 PM EDT. SAM.gov, notice 20dd67368b2c486f864143e4e9243001
June 9, 2025
Solicitation
Due June 15, 2025 at 6:00 PM EDT. SAM.gov, notice 646aea829b2e4706880e454922a5450d
June 10, 2025
Solicitation
Due July 9, 2025 at 6:00 PM EDT. SAM.gov, notice 02593378f0a14d87b5a124427b71c786
June 26, 2025
Solicitation
Due July 9, 2025 at 6:00 PM EDT. SAM.gov, notice ba80fba2a9914428816d0df45f322c23
June 27, 2025
Solicitation
Due July 9, 2025 at 6:00 PM EDT. SAM.gov, notice bf27f38489f04253ad6ffdb8fa1ba26e
July 9, 2025
Solicitation
Due July 16, 2025 at 6:00 PM EDT. SAM.gov, notice bf7c7f2c355542bb92b431df1b90aa51
Points of contact
- Arielle Anoopaanoop@lbl.gov5104865519
- Arielle Anoopaanoop@lbl.gov5104865519
Also open from this buyer
- Beamline 4.3.1 Monochromator systemPresolicitationNAICS 334516Berkeley, CAJG-0909-26Closes in 29 daysOct 16