Presolicitation, total small business set-aside
Upgrade/Replace Lift Station and Sump Pit Pumping Systems
JR1153869
Animal and Plant Health Inspection Service, MRPBS Minneapolis MN. Water and Sewer Line and Related Structures Construction.
Status
Presolicitation
Posted July 1, 2025. Scheduled to archive August 30, 2025.
Get the next one like this from Animal and Plant Health Inspection Service by email, the day it is posted.Find my opportunities
This one is not taking offers
25 like it are open now in water and sewer line and related structures construction
- YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hod
Departmental Offices, National Park Service Contracting Activity
Sources soughtNAICS 237110Location not published140PP027R0009Closes tomorrowNov 2 - Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements
Department of the Army, W072 Endist Louisville
Sources soughtNAICS 237110Lockwood, CAW912QR-PDB-FHLWATERCloses in 2 daysNov 3 - GRCA 318719 North Rim & Roaring Springs Rehabilitation Program
Departmental Offices, National Park Service Contracting Activity
PresolicitationNAICS 237110Location not published140PP027R0005Closes in 5 daysNov 6
All 25 open in water and sewer line and related structures construction
Description
As published on SAM.gov.
USDA’s Animal and Plant Health Inspection Service has a requirement to upgrade a lift station at the National Center for Applied Plant Protection facility in Laurel, MD. Due to the multiple maintenance issues, antiquated equipment, and operational criticality for the facility, the current lift station pump system and downstream sump pump systems are obsolete and need replacing. The current system uses six Zoeller Model G294-E pumps (two pumps in three locations) installed in lead/lag configurations for redundancy.
Several key components on the system are either deteriorating or inoperable, including deteriorating guide rails and supports needed for repair and/or replacement of the pumps. The effluent discharge piping has been reworked several times due to clogging with silt and other materials and is undersized for its application, resulting in numerous clogs requiring labor-intensive maintenance. Additionally, the discharge piping is not supported properly and routed improperly to facilitate proper function.
The piping also blocks access to the adjacent pump control panels, creating an additional hazard for personnel maintaining the system. The project includes installation of three new silt and solid handling pump systems within the lift station and downstream sump pump systems, including all required guiderails, supports, controls, valves, and piping modifications. The pumping systems must be fully automated, high efficiency, and equipped with redundant features.
These features will ensure the system is effective and lead to consistent results without making the process cumbersome or inconvenient. Contractor will connect the new pump systems to the existing site/building infrastructure and computer system. Likewise, the pumps must be a “stock unit” for ease of acquiring service and repair. The NAICS code for this project is 237110—Water and Sewer Line and Related Structures Construction, with a small business size standard of $45 million.
The estimated magnitude of the project is between $100,000 and $250,000. The project will be set aside for small business concerns only. The solicitation will be posted on or about July 14, 2025. It is the responsibility of interested parties to monitor this site for the solicitation and amendments, if any. Questions concerning this synopsis should be directed to Jim Roloff, contracting officer, at james.g.roloff@usda.gov.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 1, 2025
Presolicitation
SAM.gov, notice fa4973fd13644aba84159ed82f20b887
Points of contact
- Jim Roloffjames.g.roloff@usda.gov6125907603