Special notice
JMTC Substation A Repair Notice of Intent - Sole Source
JMTC_SUBA_RIA_Brand_Name
Department of the Army, W072 Endist Louisville. Commercial and Institutional Building Construction.
Response deadline
August 19, 2024 at 1:00 PM EDT
Closed 805 days ago. Posted August 6, 2024. Scheduled to archive September 3, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
185 like it are open now in commercial and institutional building construction
- Project Number 657-507, Correct Seismic Deficiencies for Building 14, Marion VAMC, Illinois Construction of New Boiler Plant and Demolition of Existing
Department of Veterans Affairs, Office of Construction & Facilities MGMT
SolicitationSDVOSBNAICS 236220Marion, IL36C10F26R0085Closes in 4 daysNov 6 - FY27 Multiple Award Task Order Contract, SEED PROJECT NO: 550-25-108, Renovate Bathrooms in B103 PRRTP & B64/7 at the VA Illiana Health Care System (VIHCS), Danville IL.
Department of Veterans Affairs, 252-Network Contract Office 12
SolicitationSDVOSBNAICS 236220Danville, IL36C25227R0001Closes in 9 daysNov 11 - RFP 7-B164-P-00002-00 (RR GC BPA FY27)
Department of Energy, Argonne Natl Lab - DOE Contractor
SolicitationNAICS 236220Lemont, IL7-B164-P-00002-00Closes in 9 daysNov 11
All 185 open in commercial and institutional building construction
Description
As published on SAM.gov.
The U.S. Army Corps of Engineers (USACE) Louisville District will be soliciting proposals for the Joint Manufacturing & Technology Center (JMTC) Subsation A Repair Project at Rock Island Arsenal, IL (RIA) this includes upgrades and repairs to the excisting substation A. As part of the construction contract solicitation, the USACE intends to include the following sole source requirements: Fire Alarm Panel - The installation standards require the use of a fire alarm panel that is compatiable with the exsiting infastrucutre.
The only panels that can intergate with the Arsenal is manafactured by Simplex specfically model 4006. SCADA System - The installation standards require the use of a SCADA system that is compatiable with the exsiting infastrucutre. The only I/O cards that can intergate with the Arsenal is manafactured by Allen-Bradley PLC 7xx using an Allen Bradley Controllogix 7xx using an RSLogix 5000 PLC programming software, and FactoryTalk SE software for SCADA.
Electric Metering - The installation standards require the use of a electronic electic meter that is compatiable with the exsiting infastrucutre. The only electric meter that can intergate with the Arsenal is manafactured Schneider Electric specfically model Powerlogic ION 9000.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 6, 2024
Special notice
Due August 19, 2024 at 1:00 PM EDT. SAM.gov, notice 023bdf4aa6e54db7b18c3a4eb5657ab3
Points of contact
- Jacob S. Pridemorejacob.s.pridemore@usace.army.mil5023156228