Sources sought, total small business set-aside
Expeditionary Refueling System
JL1234
Department of the Air Force, FA4855 27 Socons LGC. Measuring, Dispensing, and Other Pumping Equipment Manufacturing.
Response deadline
April 2, 2025 at 6:00 PM EDT
Closed 580 days ago. Posted March 26, 2025. Scheduled to archive April 17, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
41 like it are open now in measuring, dispensing, and other pumping equipment manufacturing
- Hydraulic Fluid Bulk Dispensing Unit
Department of the Navy, NAVAIR Warfare CTR Aircraft Div
Sources soughtNAICS 333914Anywhere in the USN6833527Q1002Closes tomorrowNov 4 - CYLINDER,PUMP
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 333914Anywhere in the USN0010426QFC81Closes tomorrowNov 4 - SEAL ASSEMBLY,SHAFT,SP
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationNAICS 333914Anywhere in the USSPE4A527T2005Closes in 2 daysNov 4
All 41 open in measuring, dispensing, and other pumping equipment manufacturing
Description
As published on SAM.gov.
**SOURCES SOUGHT** Product Description: Expeditionary Tank and Ground Refueling System employed as a fully integrated system and when required, the pump, filter separator, hoses, and components are capable of being operated independently of the platform system.
Salient Characteristics: 1. Off-road run flat tires 2. Pump
Ohler Model 36 aluminum pump, Hatz IB50 engine 250 GPM @ 30 PSI, 155 GPM @ 50 PSI and max pressure up to 70 PSI 3. Fuel Storage
6,000 gallons of collapsible fuel storage bladders, MIL-PRF-32233C compliant 4. Hoses
300 feet of 2" lay flat hose. 75 foot sections and are outfitted with cam-lock ends. 30 feet of hard suction hose - 15 foot sections, 3" diameter 5. Fuel Separator
Single fuel separator filter, 200-240 GPM, two flow meter/totalizers Please see attachment if your business is able to provide this item or an 'or equal' capability.
Contractor Response Instructions: Include any detailed brochures, pamplets, and/or technical specificiations.
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 26, 2025
Sources sought
Due April 2, 2025 at 6:00 PM EDT. SAM.gov, notice 64a810ee591b468595e888676403b345
Points of contact
- SrA Josh Leejosh.lee.1@us.af.mil