Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

EVAPCO COOLING TOWER

JBSFB1002

Department of the Air Force, FA3016 502 Cons CL.

Response deadline

August 12, 2025 at 5:30 PM EDT

Closed 446 days ago. Posted July 29, 2025, first published July 28, 2025. Scheduled to archive August 27, 2025.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

Description

As published on SAM.gov.

Joint Base San Antonio has a brand name requirement to procure EVAPCO COOLING TOWER 250 TON, Model ATW 238-3J-2 CLOSED CIRCUIT COOLER, from a singular manufacturer for all current and future renovations of Building 1002 on JBSA-Lackland TX.. EVAPCO Cooling Towers were originally designed and installed on Bldg 1002, the construction period ending in 2002-2003. The system dorms utilize a closed-loop system and only these Evapco Cooling Tower can operate within the buildings existing HVAC system and controls.

This specific cooling tower model is required to maintain the building's unique climate control system. Without it, the safety of the military and civilian members in this building are at risk. The system is not compatible with other models. While cooling towers are available, they do not meet the precise specifications of this system, and no other alternative can provide the same functionality.

This will also reduce the total cost of ownership by eliminating inefficiencies and duplication in cost by reducing the need to train the Building maintainers on multiple different systems, and eliminates the need to install a different control system entirely. Standardization will allow maintenance and repair to be done in house as the primary option versus contracting out these services. This specific cooling tower was installed in the building during initial construction and renovation.

Any interested responsible party that believes they could manufacture a cooling tower that is equally or otherwise uniquely capable of meeting the requirements and functions similarlly within the exsiting system should submit a capability statement. You must also submit supporting evidence in sufficient detail to not only demonstrate the ability to fulfill the requirement but also demonstrate that competition would be more advantageous to the Government.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 28, 2025

    Sources sought

    Due August 12, 2025 at 5:30 PM EDT. SAM.gov, notice 6936c0323d734a4ba8958033a39904a1

  2. July 29, 2025

    Sources sought

    Due August 12, 2025 at 5:30 PM EDT. SAM.gov, notice 49277a47a4114d899ab196c25e7ff3f2

Points of contact