Description
As published on SAM.gov.
INTRODUCTION Battelle Energy Alliance, LLC (BEA), the Management and Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is inviting Expressions of Interest (EOI) from potential offerors for the design and replacement of five Primary Coolant System heat exchangers at the Advanced Test Reactor Complex (ATR Complex). Interested parties are nuclear certified and qualified prior to submitting their EOI.
BACKGROUND The five primary coolant system heat exchangers at the Advanced Test Reactor (ATR) require replacement due to aging. These essential U-tube, counter-current, crossflow, single-phase heat transfer (liquid-to-liquid) units facilitate the transfer of heat from the primary coolant system (PCS) to the secondary coolant system (SCS), ultimately leading to the cooling tower. Their efficient operation is critical to reactor functionality.
PROCESS The selected subcontractor will be responsible for the design, procurement, and oversight of the installation during the replacement of ATR’s five heat exchangers. The scope of work includes, but is not limited to:
Conducting a detailed assessment of the existing heat exchangers. Developing a comprehensive design plan for the new heat exchangers. Procuring the necessary materials and equipment. Overseeing the installation process to ensure compliance with safety and quality standards. Collaborate with ATR personnel on the above efforts to propose a replacement plan for five primary heat exchangers.
SUBMITTAL REQUIREMENTS Interested firms should submit their expressions of interest via email to the undersigned by close of business on 09/12/2025. Submissions must include detailed information demonstrating the responder’s qualifications, addressing each criterion listed in Section 3 above. Note that responses must be no more than 20 pages in length in PDF format. Only selected respondents, as determined by BEA, will receive an invitation to present their replacement plan.
If you have questions, or need additional information, please contact, via email to Travis.Stoor@inl.gov with the subject line “Response to ATR Heat Exchanger Expression of Interest.” Technical questions must be submitted in writing via email. Proprietary Information Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 19, 2025
Sources sought
Due September 13, 2025 at 1:59 AM EDT. SAM.gov, notice 2b6dd431e3ef4df783ac5c770866508c
Points of contact
- Travis StoorTravis.Stoor@inl.gov
Also open from this buyer
- Long-Duration Energy Storage (LDES) Battery SystemSources soughtIdaho Falls, IDINL-26-050Closes in 8 daysSep 25
- SR-1 Freedom Reactor Radiation Shielding Design/BuildSources soughtIdahoINL-26-053Closes in 8 daysSep 25
- Replace Roll Up Door at SMCSources soughtNAICS 238290Idaho Falls, IDINL-26-032Closes in 23 daysOct 10
- Alternative Fuels & Feedstock Initiative to Add Value to Seed Oil Crops through Improved Preprocessing, Scalability, and Valorization of Product StreamsSources soughtIdahoINL-26-052Closes in 29 daysOct 16
- INL Industry Days EventSources soughtIdahoINL-26-000Closes in 55 daysNov 11