Skip to content
  • 6,807 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

Combined Synopsis/Solicitation for B6 Security Renovation

H92295-26-Q-B010

US Special Operations Command, Socnorth PB. Commercial and Institutional Building Construction.

Response deadline

July 9, 2026 at 2:00 PM EDT

Closed 115 days ago. Posted July 1, 2026, first published June 17, 2026. Scheduled to archive July 24, 2026.

Get the next one like this from US Special Operations Command by email, the day it is posted.Find my opportunities

This one closed in 2026

184 like it are open now in commercial and institutional building construction

All 184 open in commercial and institutional building construction

Description

As published on SAM.gov.

Mandatory Site Visit: June 25, 2026, at 3:00 PM EDT (12:00 PM Noon local Arizona time)

All questions must be submitted in writing to the Contracting Officer by June 29th 2026.

1. Description of Work

The U.S. Customs and Border Protection (CBP) has a requirement for the renovation and physical security enhancement of a 2,700 SF modular facility (Building #6) at the Tucson Border Patrol Sector Headquarters in Tucson, AZ. This project is critical to support 24-hour operations for Special Operations Command North (SOCNORTH).

The work is detailed in the attached Statement of Work (SOW) and generally includes, but is not limited to, the following key tasks:

  • Demolition and Architectural Repairs: Removal of existing windows and replacement of non-serviceable building skirting.

  • Structural Modifications: Construction of a new security vestibule inside the main entrance, including structural improvements to the sub-flooring and framing to support the installation of a Sensitive Compartmented Information Facility (SCIF) door.

  • SCIF Door and Hardware: Installation of one (1) new door assembly compliant with Intelligence Community Directive (ICD) 705 standards, complete with a GSA-approved X10 high-security lock.

  • HVAC Upgrades: Installation of two (2) new 1-ton mini-split HVAC units.

  • Electrical Systems: Assessment of the building's electrical system to support new and existing loads. The contractor shall propose and install upgrades and a backup power generator solution if the existing system is found to be insufficient.

  • Perimeter Security: Installation of a 6’ high chain-link fence with concertina wire and two access gates.

  • Electronic Security Systems (ESS): Installation of a new CCTV system and an Intrusion Detection System (IDS). The IDS must be compliant with ICD-705 and UL 2050 standards and must be installed by a UL 2050 certified installer.

2. Important Conditions

  • Site Location: The work will be performed on an active, secure federal law enforcement compound. Strict coordination and adherence to all site security policies and procedures are mandatory.

  • Personnel Security: All contractor personnel requiring access to the site must be United States Citizens and must undergo and pass a National Agency Check with Inquiries (NACI) background check facilitated by the government prior to site access.

  • Document Control: The full technical drawings for this project are designated as Controlled Unclassified Information (CUI). Vetted offerors may request access to the drawings through the Contracting Officer after the solicitation is issued.

  • SAM.gov Registration: Offerors must have an active registration in the System for Award Management (SAM.gov) at the time of proposal submission and must maintain it for the life of the contract.

3. Proposal Submission
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6. Proposals should be submitted no later than the response date listed above. Offerors are required to submit a technical proposal that addresses their approach to completing all tasks in the SOW, along with pricing. Key submission requirements include:

  • Proof of a valid SAM.gov registration (UEI and CAGE Code).

  • A detailed technical approach for the work outlined in the SOW.

  • Proof of having a UL 2050 certified installer for the IDS. This is a mandatory requirement.

  • A preliminary project schedule.

  • A completed Quality Control Plan (QCP).

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 17, 2026

    Combined synopsis and solicitation

    Due July 2, 2026 at 2:00 PM EDT. SAM.gov, notice 602599a479c14494a231738ef5fa545e

    5 revisions on SAM
    • July 1, 2026: publish, combined synopsis and solicitation
    • June 30, 2026: publish, combined synopsis and solicitation
    • June 26, 2026: publish, combined synopsis and solicitation
    • June 17, 2026: publish, combined synopsis and solicitation
    • June 17, 2026: publish, combined synopsis and solicitation
  2. June 17, 2026

    Combined synopsis and solicitation

    Due July 2, 2026 at 2:00 PM EDT. SAM.gov, notice f3a78bdbff3143b2add4a229ea495d4f

    5 revisions on SAM
    • July 1, 2026: publish, combined synopsis and solicitation
    • June 30, 2026: publish, combined synopsis and solicitation
    • June 26, 2026: publish, combined synopsis and solicitation
    • June 17, 2026: publish, combined synopsis and solicitation
    • June 17, 2026: publish, combined synopsis and solicitation
  3. June 26, 2026

    Combined synopsis and solicitation

    Due July 2, 2026 at 2:00 PM EDT. SAM.gov, notice be8ea9e99918477cba6fcac1e5193772

    5 revisions on SAM
    • July 1, 2026: publish, combined synopsis and solicitation
    • June 30, 2026: publish, combined synopsis and solicitation
    • June 26, 2026: publish, combined synopsis and solicitation
    • June 17, 2026: publish, combined synopsis and solicitation
    • June 17, 2026: publish, combined synopsis and solicitation
  4. June 30, 2026

    Combined synopsis and solicitation

    Due July 9, 2026 at 2:00 PM EDT. SAM.gov, notice 204f1ad59df649918cc4277f1c8d7604

    5 revisions on SAM
    • July 1, 2026: publish, combined synopsis and solicitation
    • June 30, 2026: publish, combined synopsis and solicitation
    • June 26, 2026: publish, combined synopsis and solicitation
    • June 17, 2026: publish, combined synopsis and solicitation
    • June 17, 2026: publish, combined synopsis and solicitation
  5. July 1, 2026

    Combined synopsis and solicitation

    Due July 9, 2026 at 2:00 PM EDT. SAM.gov, notice e085629a71f7465fbe4943d161141a11

    5 revisions on SAM
    • July 1, 2026: publish, combined synopsis and solicitation
    • June 30, 2026: publish, combined synopsis and solicitation
    • June 26, 2026: publish, combined synopsis and solicitation
    • June 17, 2026: publish, combined synopsis and solicitation
    • June 17, 2026: publish, combined synopsis and solicitation

Points of contact