Presolicitation
Renovation of High Reservoir #2
GDP-B0061-5P
Department of the Army, 0409 Aq HQ Contract. Water and Sewer Line and Related Structures Construction.
Response deadline
July 22, 2026 at 11:00 AM EDT
Closed 102 days ago. Posted July 8, 2026, first published July 8, 2026. Scheduled to archive August 6, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
25 like it are open now in water and sewer line and related structures construction
- YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hod
Departmental Offices, National Park Service Contracting Activity
Sources soughtNAICS 237110Location not published140PP027R0009Closes tomorrowNov 2 - GRCA 318719 North Rim & Roaring Springs Rehabilitation Program
Departmental Offices, National Park Service Contracting Activity
PresolicitationNAICS 237110Location not published140PP027R0005Closes in 5 daysNov 6 - Turnout Buildings
Departmental Offices, Reclamation Contracting Activity
SolicitationNAICS 237110Location not published140R4026B0002Closes in 9 daysNov 10
All 25 open in water and sewer line and related structures construction
Description
As published on SAM.gov.
W564KV26AB003 Solicitation Synopsis: Renovation of High-Water Reservoir Nr. 2
(i) Description of the supplies or services required
The project entails the renovation of High-Water Reservoir Nr. 2 (Building #8444) at the Baumholder Military Community. Full details of the project are included in the attached Statement of Work (SOW) and affiliated attachments (1-5).
(ii) Statement of intent to use the two-step method
This solicitation and resulting contract are utilizing a Two-Step Sealed Bidding procurement method as described in RFO Part 14.211. Step One is a request for technical proposals only, and offerors determined to be acceptable will be notified of Step Two via receipt of the Invitation for Bid (IFB) solicitation document.
(iii) Requirements of the technical proposal
The technical proposal must include at least the following:
- Set up so that no additional explanations and information are required.
- Indication of the applied German Institute for Standardization, or Deutsches Institut für Normung (DINs), Regulations and Standards.
- Sketches/Drawings, if necessary.
- Submitted in English.
- Provided in electronic PDF format.
- Provide all information/documents requested in the technical evaluation criteria.
(iv) Evaluation criteria, including all factors and any significant subfactors
Proposals will be evaluated to be "Acceptable", "Reasonably susceptible of being made acceptable", or "Unacceptable" based on the following technical criteria:
- FACTOR 1: Offerors shall show method of accomplishment and materials to be used. Offerors must submit a copy of specifications and materials proposed, describing how the project will be accomplished as required by the SOW. Proposed materials and methods must meet or exceed minimum applicable DIN standards.
- FACTOR 2: Offerors shall provide a Progress Schedule outlining the plan to meet the 270 calendar day delivery time for all specification requirements, including the timeframe for deliverables, materials possession, preparation, mobilization dates, and planned sequence of work.
- FACTOR 3: Offerors shall provide documentation, specifically one copy of their Certificates for doing business in Germany, authorizing the firm to conduct business in Germany.
(v) Statement regarding prices or pricing information
The submission requirements of Step One, Request for Technical Proposal, shall not include any prices or pricing information. Technical Proposals MUST NOT include prices.
(vi) Date and hour by which the technical proposal must be received
05 August 2026 at 17:00 Central European Summer Time (CEST). This date is subject to change at the time of solicitation.
(vii) Statement regarding the second step
(A) In Step Two, only bids based upon technical proposals determined to be acceptable, either initially or because of discussions from Step One, will be considered for award.
(B) Each bid in Step Two must be based on the bidder's own technical proposal that was submitted, evaluated, and determined to be acceptable in Step One.
(viii) Statement regarding acceptability and further information
(A) Bidders should submit technical proposals that are acceptable without additional explanation or information.
(B) The Government may make a final determination regarding a technical proposal's acceptability solely on the basis as submitted.
(C) The Government may proceed with the second step without requesting further information from any bidder; however, the Government may request additional information from bidders of bids that it considers "reasonably susceptible of being made acceptable" and may discuss bids with their bidders.
(ix) Statement regarding notice of unacceptability
If the Government finds a technical proposal unacceptable during evaluations, a notice of unacceptability will be forwarded to the offeror upon completion of the technical evaluation.
(x) Statement regarding multiple technical proposals
Bidders are welcome and encouraged to submit multiple technical proposals presenting different basic approaches. Each technical proposal submitted will be separately evaluated, and the submitter will be notified as to its acceptability.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- SOW_ 26 May 2026.pdf793 KB, July 8, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 8, 2026
Presolicitation
Due July 22, 2026 at 11:00 AM EDT. SAM.gov, notice 4275a8429f9c4c049ebf87dca1062177
2 revisions on SAM
- July 8, 2026: publish, presolicitation
- July 8, 2026: publish, presolicitation
July 8, 2026
Presolicitation
Due July 22, 2026 at 11:00 AM EDT. SAM.gov, notice b75354611afb4839b8e3047037135e0b
3 revisions on SAM
- August 12, 2026: publish, solicitation
- July 8, 2026: publish, presolicitation
- July 8, 2026: publish, presolicitation
Points of contact
- Rebekah Stonerabekah.e.stone.civ@army.mil
- Daniel Willdaniel.h.will.civ@army.mil