Country Club west Stoplog Rehabilitation
FY4201010
International Boundary and Water Commission: US-Mexico, Internat. Boundary and Water Comm..
Response deadline
July 10, 2026 at 5:00 PM EDT
Closed 68 days ago. Posted June 25, 2026. Scheduled to archive July 25, 2026.
Description
As published on SAM.gov.
The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation (sealed bid) for the purpose of repairing the Country Club Bridge west stoplog foundation located near Sunland Park in El Paso County, Texas. The project generally consists of installing a new expansion joint and repairing deteriorated concrete at the stoplog structure.
The proposed repairs will restore movement between the roadway and stoplog foundation structure, reduce further deterioration, and maintain a safe and serviceable bridge approach. Construction activities will require traffic control measures including lane or full closure and coordination with local agencies to maintain safe traffic operations during construction.
Major Tasks Include:
1. Mobilization and demobilization.
2. Traffic control permitting, implementation and maintenance.
3. Sawcutting and removal of existing expansion joint materials.
4. Installation of new expansion joint filler, backer rod, and sealant.
5. Repair of deteriorated and spalled concrete surfaces.
6. Disposal of removed materials and construction debris.
7. Final cleanup and closeout activities. Project Location Country Club Rd Bridge, West Levee Approximate Coordinates: 31.846400, -106.606524 Per FAR 36.204, the magnitude of the project is estimated between $25,000 and $100,000. The work is located in El Paso, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price. The anticipated actual construction duration is approximately two (2) weeks.
However, a traffic control permit requires City of El Paso and TxDOT approval for work on the heavily trafficked Country Club Rd. All work shall be completed within ninety (90) calendar days after the Notice to Proceed. The final paperwork for closeout of the Contact shall be completed within thirty (30) calendar days of completion of construction. The time stated for completion shall include final cleanup of the premises.
The Solicitation, plans, and specifications are expected to be posted on or about 10 July 2026 (this is a target date which may slip or change). The Solicitation will be available for a minimum of thirty (30) calendar days. This is a Presolicitation Notice. The Solicitation will include information on how to obtain the
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 25, 2026
Presolicitation
Due July 10, 2026 at 5:00 PM EDT. SAM.gov, notice 65d46e13ee274d71ac63a98d06ff8db9
Points of contact
- Philip Johnsonphilip.johnson@ibwc.gov9152559324
- Angelica Bacaangelica.baca@ibwc.gov
Also open from this buyer
- UV Plus System RehabilitationSolicitationNAICS 333310Arizona191BWC26R0017Closes tomorrowSep 17
- Tire ChangerSolicitationNAICS 423120TexasFY263161064Closes tomorrowSep 17
- Nogales Headworks RebuildCombined synopsis and solicitationNAICS 237110Arizona191BWC26R0019Closes in 2 daysSep 18
- Nogales InstrumentationSolicitationNAICS 334513Arizona191BWC26R0018Closes in 2 daysSep 18
- CLARIFIER EQUIPMENT REPAIR AND REFURBISHMENT SERVICESSolicitationSmall businessNAICS 811310Arizona191BWC26R0016Closes in 2 daysSep 18