Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

Operation & Maintenance of the South Bay Wastewater Treatment Plant

FY26OMSBIWTP

International Boundary and Water Commission: US-Mexico, Internat. Boundary and Water Comm.. Sewage Treatment Facilities.

Response deadline

January 16, 2026 at 7:00 PM EST

Closed 288 days ago. Posted January 14, 2026, first published June 12, 2025. Scheduled to archive January 31, 2026.

Get the next one like this from International Boundary and Water Commission: US-Mexico by email, the day it is posted.Find my opportunities

This one closed in 2026

5 like it are open now in sewage treatment facilities

All 5 open in sewage treatment facilities

Description

As published on SAM.gov.

Amendment 0008: aditional Q&As. 

Amendment 0007: Clarification on Page Limits and Proposal Requirements

Ammendment 006

Update section L04B Access Request Deadline: All access requests must be submitted no later than 01/15/2026, at 12:00 PM MST. SharePoint Access Period: Vendors will be granted access to upload proposals starting January 15, 2026Proposal Submission Deadline: All proposals must be uploaded by Friday, January 16th, 2026, at 5:00 PM MST. Late uploads will not be accepted, and expired links will not be reactivated.

Amendment 005 corrects the Governemt's responce to Q&A #110 removing "Hard Copy and Electronic Copy: Both are required."

Corrected response: 

Page Size and Limits: Standard Page Size: 8.5" x 11", Maximum Length: Technical Proposal: 20 double-sided pages (or 40 single-sided), Qualifications Proposal (Phase One): 10 double-sided pages (or 20 single-sided); Exclusions from Page Count: Cover page, table of contents, resumes, client authorization letters, divider pages, and OSHA forms.11" x 17" Sheets: Allowed only for schedules or organizational charts. Counted as one 8.5" x 11" page toward the page limit. Font and Readability: Minimum Font Size: 10-point for body text. This does not apply to graphics, captions, tables, and charts. Legibility: Proposals must be clear, easy to read, and logically presented. Submission Format: Electronic Format: PDF only. Must be either a high-quality scan or a document produced directly to PDF. Page Numbering: All pages must be consecutively numbered, including tables and exhibits.

Amendment 004 incorporates the O&M PWS amended 16 December 2025 and updates the RFI. Both are added to the attachments of this solicitation. 

Amendment 003 Amendment 003 incorporates changes to the PWS, Q&A, adds attachments, and changes the due date of proposal to 16 January 2026. Question due date has passed but questions can still be submitted in accordance with instructions below, but the Contracting Officer has the discretion if an answer is warranted.  

Note - PWS added as attachment. Amendment 002 is adding updating Clauses and changing dates below:

Key Deadlines & Due Dates

Questions & Clarifications

•             Deadline to Submit Questions changed to 10:00 AM PST (11:00 AM MST), November 26, 2025

Proposal Submission

•             SharePoint Access Request Deadline changed to December 5, 2025, 12:00 PM MST

•             SharePoint Upload Window Opens changed to December 8, 2025

Solicitation Close

•             Solicitation Closing Date changed to December 22, 2025, 5:00 PM MT 

Questions shall be submitted via- SharePoint: request access to philip.johnson@ibwc.gov, seone.jones@ibwc.gov and suzette.smith@ibwc.gov, once access is requested you will receive confirmation. Each vendor must submit all solicitation and site visit questions in writing by 10:00 AM PST (11:00 AM MST) on November 17, 2025 referencing Solicitation No. 191BWC26R0001.

Only the individual who requested access will be granted permission to the vendor’s designated Q&A folder. Access links are unique and must not be shared or forwarded.

All questions must be uploaded directly to that folder, then an email notification must be sent to Philip.Johnson@ibwc.gov confirming submission.

Each question must identify the specific solicitation page or section it refers to.

File Naming Convention
File name must follow this format:
[YYYYMMDD]_[CompanyName]_191BWC26R0001_QA.docx
Example: 20251105_ABC_Engineering_191BWC26R0001_QA.docx

Submission Requirements
1. Upload one consolidated document per company.
2. Use Word or Excel format only.
3. Include page or section references for each question.
4. Do not include photos or unrelated attachments.
5. Questions will be answered publicly through the SAM.gov.

 

------------------------------------------------

Attachment 14 was revoked 

Amendment 001 - Changing Site Visit date to Friday, 7 November 2025

Current contract 191BWC20C0003 

INTRODUCTION

The United States Section of the International Boundary and Water Commission (USIBWC), has a requirement for contract for the operation and maintenance (O&M) of the South Bay International Wastewater Treatment Plant (SBIWTP) and facilities located in San Diego County, California.  Type of contract, Firm Fixed Priced, Cost Reimbursable, Hybrid, etc. to be determined.  

The Contractor shall provide, all labor, material, management (including bi-national participation with Mexico), and other resources required to perform full-service O&M of the SBIWTP and its conveyance system, plus Canyon Collectors, Pump Stations, and South Bay Land Outfall (SBLO). Full service operation and maintenance is defined as complete facility operation and maintenance, including but not limited to providing day-to-day contract management, planning, supervision, administration, personnel; plant influent and effluent sampling and laboratory testing; equipment operation, maintenance, servicing, repair and replacement; system monitoring and operation; data recording, markups of plant as built, management and reporting; quality control; capital improvements; vehicles and vehicle fleet management, operation, maintenance and repair; housekeeping; grounds maintenance; consumable supplies including chemicals, and other services related to the operation and maintenance of the SBIWTP.   

BACKGROUND  

The SBIWTP is a twenty-five (25) million gallon per day (MGD) wastewater treatment plant located at 2995 Clearwater Way, in San Diego, San Diego County, California, , north of the International Boundary, and near the intersections of Monument and Dairy Mart Roads.  Construction of the plant’s advanced primary treatment phase was completed in September 1997, and construction of the secondary treatment phase was completed in January 2011.  The plant is treating wastewater originating in Tijuana, Baja California, Mexico and the SBIWTP is operated under the authority of the United States Section, International Boundary and Water Commission (USIBWC).  An average of twenty five million gallons per day (25 MGD) of effluent is being discharged through the South Bay Ocean Outfall (SBOO), and is subject to the requirements of the National Pollutant Discharge Elimination System (NPDES) Permit, Permit Number CA0108928, Order Number R9-2023-0009; the California Regional Water Quality Control Board (CRWQCB) Monitoring and Reporting Program, Number: R9-2023-0009; and the California Ocean Plan.   

In 2024, USIBWC awarded a $600M contract for the design and construction of the rehabilitation and expansion of the SBIWTP. USIBWC awarded the contract to PCL Construction (PCL) of Long Beach, California. In turn, PCL selected Stantec Consulting Services, Inc. (Stantec), of San Diego, as the design firm. The project was awarded using the Progressive Design-Build (PDB) contract delivery method consistent with Government contracting practices and regulations. 

Expansion of Capacity 

According to USIBWC's timeline, the design process of the plant’s expansion will unfold in strategic phases, with the complete plant expansion targeted for completion by 2027. The initial phase of the plant’s expansion encompasses design development for the entire SBIWTP scope, while subsequent phases will implement rehabilitation efforts concurrent with the ongoing expansion work. 

During the expansion, the PDB team will work closely with the future SBIWTP Operator of this Contract to rehabilitate the plant while also expanding it. The USIBWC and PDB team aims to enhance the plant's treatment capacity from the current 25 MGD to 35 MGD by 2025, with a subsequent expansion to 60 MGD projected for completion by 2027. This will likely be done in incremental increases of, for example, 10 MGD or 20 MGD at a time, with a maximum potential capacity of 60 MGD. Throughout the incremental expansion period, the Operations and Maintenance contract will be adjusted as needed to accommodate the changing requirements and milestones of the Progressive Design-Build project. While the PDB project team will retain responsibility for all construction activities, modifications to this contract will undergo review and receive appropriate authorization when necessary. 

There will be a sixty (60) day phase in/outperiod. The Contract will consist of a Base Year from date of award 6March 30, 2027 plus four (4) one-year option periods.  This is anticipated to be an unrestricted procurement under the NAICS code 221320 (Sewage Treatment Facilities), the small business size standard is $50 million. 

List of Attachments: 

  1. SOM- Submittal Registry (aka deliverables) 
  2. Quality Assurance Surveillance Plan (QASP) 
  3. Required Performance Metrics (RPM) 
  4. NPDES Permit R9-2023-0009; 4A CDO-R9-2025-0139
  5. List of Permits 
  6. SBIWTP Asset Registry  
  7. SBIWTP Condition Assessment Report- January 2024 
  8. SBIWTP Asset Maintenance Schedule 
  9. SBIWTP Capital Project List- April 2024 
  10. Monthly Chemical Dosage from March 2024- March 2025, updated Sep-Oct 2025
  11. Canyon Collector Daily Inspection Template 
  12. NPDES Annual Biosolids Report 2024 
  13. SBIWTP O&M Manual 
  14. SBIWTP System Security Plan (Need to Request access through file share), updated 042020
  15. NIST SP 800-17r3 
  16. Plans/Drawings 
  17. Maps 
  18. NIST SP 199 
  19. SBIWTP Sequence of Operations (SOO) 
  20. Wage Determination (WD) 
  21. IBWC Spill and Transboundary Plan 2021
  22. USIBWC SDFO Org Chart 22A 2019 Contractor Org Chart
  23. IBWC SBIWTP Capital Improvement Plan 2025-2029
  24. 2025 2025 IBWC Risk Assessment Final
  25. 2025 Tijuana wastewater flow diagram
  26. Emergency Response Plan
  27. SBIWTP PDB O&M Contract PWS 2020
  28. SBIWTP PDB Expansion PWS section 01.31.83.01
  29. CUI_SBIWTP PDB Early Work Package 1C replacement in kind
  30. Temp_Capacity_Incr_BOD_TM8 (need to request access through file share)
  31. Temp_Capacity_Inc_OM_TM10 (need to request access through file share)
  32. Plant Flow Diagram_2025_Temp_increase 35 mgd (need to request through file share)
  33. Thickening & Dewatering Service (need to request through file share)
  34. 12 months O&M reports (need to request through file share)
  35. 12 months NPDES Reports (need to request through file share)

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 12, 2025

    Sources sought

    Operation & Maintenance of the South Bay Wast Water Treatment Plant

    Due August 18, 2025 at 6:00 PM EDT. SAM.gov, notice 289f91fdc57c423e9746612da262fcfc

  2. June 20, 2025

    Sources sought

    Due August 18, 2025 at 6:00 PM EDT. SAM.gov, notice 8e47dd5fc2354450bc6f0526a6c41242

  3. July 3, 2025

    Sources sought

    Due August 18, 2025 at 6:00 PM EDT. SAM.gov, notice 80cf35d1a8f54c2e819de092cabe3776

  4. October 21, 2025

    Sources sought

    Due December 12, 2025 at 7:00 PM EST. SAM.gov, notice d45f47036af0441aa5608666f3d6c5e8

    14 revisions on SAM
    • January 14, 2026: publish, sources sought
    • January 13, 2026: publish, sources sought
    • January 12, 2026: publish, sources sought
    • January 6, 2026: publish, sources sought
    • December 19, 2025: publish, sources sought
    • December 16, 2025: publish, sources sought
    • November 13, 2025: publish, sources sought
    • November 12, 2025: publish, sources sought
    • October 29, 2025: publish, sources sought
    • October 22, 2025: publish, sources sought
    • October 21, 2025: publish, sources sought
    • July 3, 2025: publish, sources sought
    • June 20, 2025: publish, sources sought
    • June 12, 2025: publish, sources sought
  5. October 22, 2025

    Sources sought

    Due December 12, 2025 at 7:00 PM EST. SAM.gov, notice 21042ec8187844c2a2ab99cbd60b6906

    14 revisions on SAM
    • January 14, 2026: publish, sources sought
    • January 13, 2026: publish, sources sought
    • January 12, 2026: publish, sources sought
    • January 6, 2026: publish, sources sought
    • December 19, 2025: publish, sources sought
    • December 16, 2025: publish, sources sought
    • November 13, 2025: publish, sources sought
    • November 12, 2025: publish, sources sought
    • October 29, 2025: publish, sources sought
    • October 22, 2025: publish, sources sought
    • October 21, 2025: publish, sources sought
    • July 3, 2025: publish, sources sought
    • June 20, 2025: publish, sources sought
    • June 12, 2025: publish, sources sought
  6. October 29, 2025

    Sources sought

    Due December 12, 2025 at 7:00 PM EST. SAM.gov, notice 92f3fce567fb4312a2ff271b68cf062d

    14 revisions on SAM
    • January 14, 2026: publish, sources sought
    • January 13, 2026: publish, sources sought
    • January 12, 2026: publish, sources sought
    • January 6, 2026: publish, sources sought
    • December 19, 2025: publish, sources sought
    • December 16, 2025: publish, sources sought
    • November 13, 2025: publish, sources sought
    • November 12, 2025: publish, sources sought
    • October 29, 2025: publish, sources sought
    • October 22, 2025: publish, sources sought
    • October 21, 2025: publish, sources sought
    • July 3, 2025: publish, sources sought
    • June 20, 2025: publish, sources sought
    • June 12, 2025: publish, sources sought
  7. November 12, 2025

    Sources sought

    Due December 12, 2025 at 7:00 PM EST. SAM.gov, notice 932db63c9bf74d938153beef67284f7a

    14 revisions on SAM
    • January 14, 2026: publish, sources sought
    • January 13, 2026: publish, sources sought
    • January 12, 2026: publish, sources sought
    • January 6, 2026: publish, sources sought
    • December 19, 2025: publish, sources sought
    • December 16, 2025: publish, sources sought
    • November 13, 2025: publish, sources sought
    • November 12, 2025: publish, sources sought
    • October 29, 2025: publish, sources sought
    • October 22, 2025: publish, sources sought
    • October 21, 2025: publish, sources sought
    • July 3, 2025: publish, sources sought
    • June 20, 2025: publish, sources sought
    • June 12, 2025: publish, sources sought
  8. November 13, 2025

    Sources sought

    Due December 12, 2025 at 7:00 PM EST. SAM.gov, notice 66c4a08397d54489b7747544fe85a34e

    14 revisions on SAM
    • January 14, 2026: publish, sources sought
    • January 13, 2026: publish, sources sought
    • January 12, 2026: publish, sources sought
    • January 6, 2026: publish, sources sought
    • December 19, 2025: publish, sources sought
    • December 16, 2025: publish, sources sought
    • November 13, 2025: publish, sources sought
    • November 12, 2025: publish, sources sought
    • October 29, 2025: publish, sources sought
    • October 22, 2025: publish, sources sought
    • October 21, 2025: publish, sources sought
    • July 3, 2025: publish, sources sought
    • June 20, 2025: publish, sources sought
    • June 12, 2025: publish, sources sought
  9. December 16, 2025

    Sources sought

    Due January 16, 2026 at 7:00 PM EST. SAM.gov, notice 92e0cf84b59d40ab86d136b5ec7bcdb1

    14 revisions on SAM
    • January 14, 2026: publish, sources sought
    • January 13, 2026: publish, sources sought
    • January 12, 2026: publish, sources sought
    • January 6, 2026: publish, sources sought
    • December 19, 2025: publish, sources sought
    • December 16, 2025: publish, sources sought
    • November 13, 2025: publish, sources sought
    • November 12, 2025: publish, sources sought
    • October 29, 2025: publish, sources sought
    • October 22, 2025: publish, sources sought
    • October 21, 2025: publish, sources sought
    • July 3, 2025: publish, sources sought
    • June 20, 2025: publish, sources sought
    • June 12, 2025: publish, sources sought
  10. December 19, 2025

    Sources sought

    Due January 16, 2026 at 7:00 PM EST. SAM.gov, notice 9e4b3358d348456bbc667d4856297b05

    14 revisions on SAM
    • January 14, 2026: publish, sources sought
    • January 13, 2026: publish, sources sought
    • January 12, 2026: publish, sources sought
    • January 6, 2026: publish, sources sought
    • December 19, 2025: publish, sources sought
    • December 16, 2025: publish, sources sought
    • November 13, 2025: publish, sources sought
    • November 12, 2025: publish, sources sought
    • October 29, 2025: publish, sources sought
    • October 22, 2025: publish, sources sought
    • October 21, 2025: publish, sources sought
    • July 3, 2025: publish, sources sought
    • June 20, 2025: publish, sources sought
    • June 12, 2025: publish, sources sought
  11. January 6, 2026

    Sources sought

    Due January 16, 2026 at 7:00 PM EST. SAM.gov, notice 8299fc4731af45caa57d055b955027a2

    14 revisions on SAM
    • January 14, 2026: publish, sources sought
    • January 13, 2026: publish, sources sought
    • January 12, 2026: publish, sources sought
    • January 6, 2026: publish, sources sought
    • December 19, 2025: publish, sources sought
    • December 16, 2025: publish, sources sought
    • November 13, 2025: publish, sources sought
    • November 12, 2025: publish, sources sought
    • October 29, 2025: publish, sources sought
    • October 22, 2025: publish, sources sought
    • October 21, 2025: publish, sources sought
    • July 3, 2025: publish, sources sought
    • June 20, 2025: publish, sources sought
    • June 12, 2025: publish, sources sought
  12. January 12, 2026

    Sources sought

    Due January 16, 2026 at 7:00 PM EST. SAM.gov, notice 81d4722aadd3499f9d3027b433351501

    14 revisions on SAM
    • January 14, 2026: publish, sources sought
    • January 13, 2026: publish, sources sought
    • January 12, 2026: publish, sources sought
    • January 6, 2026: publish, sources sought
    • December 19, 2025: publish, sources sought
    • December 16, 2025: publish, sources sought
    • November 13, 2025: publish, sources sought
    • November 12, 2025: publish, sources sought
    • October 29, 2025: publish, sources sought
    • October 22, 2025: publish, sources sought
    • October 21, 2025: publish, sources sought
    • July 3, 2025: publish, sources sought
    • June 20, 2025: publish, sources sought
    • June 12, 2025: publish, sources sought
  13. January 13, 2026

    Sources sought

    Due January 16, 2026 at 7:00 PM EST. SAM.gov, notice bcfd42fa8fe64368ab007e0c85cbca50

    14 revisions on SAM
    • January 14, 2026: publish, sources sought
    • January 13, 2026: publish, sources sought
    • January 12, 2026: publish, sources sought
    • January 6, 2026: publish, sources sought
    • December 19, 2025: publish, sources sought
    • December 16, 2025: publish, sources sought
    • November 13, 2025: publish, sources sought
    • November 12, 2025: publish, sources sought
    • October 29, 2025: publish, sources sought
    • October 22, 2025: publish, sources sought
    • October 21, 2025: publish, sources sought
    • July 3, 2025: publish, sources sought
    • June 20, 2025: publish, sources sought
    • June 12, 2025: publish, sources sought
  14. January 14, 2026

    Sources sought

    Due January 16, 2026 at 7:00 PM EST. SAM.gov, notice 7e410c63052f481f8a7c3b9201a4c243

    15 revisions on SAM
    • March 6, 2026: publish, special notice
    • January 14, 2026: publish, sources sought
    • January 13, 2026: publish, sources sought
    • January 12, 2026: publish, sources sought
    • January 6, 2026: publish, sources sought
    • December 19, 2025: publish, sources sought
    • December 16, 2025: publish, sources sought
    • November 13, 2025: publish, sources sought
    • November 12, 2025: publish, sources sought
    • October 29, 2025: publish, sources sought
    • October 22, 2025: publish, sources sought
    • October 21, 2025: publish, sources sought
    • July 3, 2025: publish, sources sought
    • June 20, 2025: publish, sources sought
    • June 12, 2025: publish, sources sought

Points of contact