Justification
Justification for Other then Full and Open Competition - DMC Construction MATOC Ceiling Increase
FY26-006
Department of the Army, 0414 Aq HQ Contract Aug. Commercial and Institutional Building Construction.
Awarded
Impresa Costruzioni Filippi Renzo E Figli S.R.L.
$0.00 obligated so far on USAspending, May 11, 2026, contract W912PF24D0010
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one was awarded in 2026
194 like it are open now in commercial and institutional building construction
- MCI East Barracks Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a)
Department of the Navy, Navfacsyscom Mid-Atlantic
SolicitationNAICS 236220Location not publishedN4008526R0276Closes todayNov 5 - Navy Child Development Centers (CDC) Industrialized Construction (IC) Projects via Other Transaction Authority (10 U.S.C. § 2808a)
Department of the Navy, Navfacsyscom Atlantic
SolicitationNAICS 236220Location not publishedN6247027R0003Closes tomorrowNov 6 - Building 143 Concrete Scale Pad Expansion and Dock Leveler Replacement
Department of the Navy, NSWC Carderock
PresolicitationNAICS 236220Location not publishedN00167-27-SIMACQ-CD-102-0003Closes in 4 daysNov 9
All 194 open in commercial and institutional building construction
Description
As published on SAM.gov.
Justification for Other than Full and Open Competition – DMC Construction MATOC Ceiling Increase
The 414th Contracting Support Brigade (CSB), Regional Contracting Office (RCO), Vicenza, Italy, increases the maximum value of the existing Darby Military Community (DMC) Construction Multiple Award Task Order Contract (MATOC) comprised of four (4) Indefinite-Delivery, Indefinite-Quantity (IDIQ) contracts: W912PF24D0010, W912PF24D0011, W912PF24D0012, W912PF24D0013. Pursuant to the requirements of the Competition in Contracting Act (CICA) as implemented by the Federal Acquisition Regulation (FAR) Subpart 6.3 and in accordance with the requirements of FAR 6.303-1, the justification for the use of the statutory authority under FAR Subpart 6.3 is supported by the facts and rationale required under FAR 6.303-2 within the attached justification and approval (J&A) document.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- A02-JA REDACTED_20260403.pdf3.8 MB, May 26, 2026
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- UEI
- F2YFV4BC9MA2
- CAGE
- A9778
- Vendor location
- San Giuliano Terme
- Contract
- W912PF24D0010
- Obligated
- $0.00, potential $15,000,000
- Actions
- 2 between March 4, 2024 and May 11, 2026
- Competition
- Full and Open Competition, 8 offers received
- Set-aside reported
- No Set Aside Used.
- Described as
- Multiple Award Task Order Contract (Matoc) Design-Build and Design-Bid-Build Construction Projects for Darby Military Community (Dmc), Usag, Italy
- Match
- award number W912PF24D0010 equals the contract number; same awarding office W912PF (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 26, 2026
Justification
SAM.gov, notice 0c8a8bb3aee24d3291d3c3eef88dcd68
1 revisions on SAM
- May 26, 2026: publish, justification
Points of contact
- brendan.a.delucabrendan.a.deluca.civ@army.mil00390509658760
- John Orbanjohn.c.orban.civ@army.mil