Special notice
C5ISR Center MOSA Management Office (MMO) for CMOSS / VICTORY / MORA
FY22-C5ISR-CMOSS
Department of the Army, W6QK ACC-APG.
Response deadline
March 23, 2027 at 4:00 PM EDT
Closed in 142 days. Posted July 15, 2026, first published October 17, 2024. Scheduled to archive April 7, 2027.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
Description
As published on SAM.gov.
***13 July 2026 - This Update makes an additional Approved for Public Release document, CMOSS IRS v1.3 discoverable and available. Additionally, referenced SOSA(TM) downloads are currently available at https://publications.opengroup.org/standards/sosa/s251
Attachments
DRAS-26-3886-1-CMOSS-IRS-v1-3-DistA.pdf
*** 16 October 2024 - This Update makes additional Approved for Public Release documents, including the new CMOSS IRS v1.2 and related files, discoverable and available. Additionally, referenced SOSA(TM) downloads are currently available at https://publications.opengroup.org/s241 .
Attachments
CMOSS Overview 14SEP23 Dist A 23-1038.pdf
CMOSS-IRS-v1-2-DistA-24-1395-3.pdf
MORA-VDL-Instructions-22Jul22-Dist-A-A1071.pdf
mora-wsdls-and-schemas_MORA-V2.5-DIST_A_APPROVED-23-1003.zip
MORA_Specification_V2.5_20221221_Final_DIST_A_APPROVED-23-1003.pdf
MORA_Specification_V2.5_Revision_Notice_20221221_Final_DIST_A_APPROVED-23-182.pdf
MORA_V2.5_Specification_Atlas_Rev_B_20230609_DIST_A_APPROVED-23-1003.xlsx
MORA_V2.5_Specification_Revision_Overview_Brief_DEVCOM_C5ISR_Center_20221221_Final_DIST_A_APPROVED-23182.pdf
MORA_V2.5_Training_ Session_Three_March_2023_CCDC_C5ISR_Center_DLB_Rev25_DIST_A_APPROVED-23-319.pdf
MORA_V2.5_Training_ Session_Two_March_2023_CCDC_C5ISR_Center_DLB_Rev33_DIST_A_APPROVED-23-319.pdf
MORA_V2.5_Training_Session_One_March_2023_CCDC_C5ISR_Center_DLB_Rev27_DIST_A_APPROVED-23-319.pdf
Signed SAVE-IDD, 15 Feb 23.pdf
VICTORY V1.9 and V1.10 and MORA V2.4 WSDLs and Schemas Dist A Final A921.zip
VICTORY-Spec-Doc-V1-10-DIST_A_APPROVED-23-1003.pdf
VICTORY-Spec-Doc-V1-10-MORA-Appendix-DIST_A_APPROVED-23-1003.pdf
VICTORY-Spec-Doc-V1-9-MORA-Appendix.pdfVICTORY-Training-20220617-Dist-A-A1027.pdf
VICTORY-VDL-Instructions-22Jul22-Dist-A-A1071.pdf
*** 14 July 2022- This Update makes an additional Approved for Public Release document, an Interface Description Document for C5ISR Systems Integration into Army Ground Vehicles, discoverable and available.
*** 22 April 2022- This Update makes additional Approved for Public Release documentation, referenced by the CMOSS Interoperability Requirements Specification v1.1, discoverable and available. Additionally, referenced SOSA(TM) downloads are currently available at https://www.opengroup.org/library/c212 .
Attachments
- MORA_Specification_V2.4_20210301_Final_DIST_A A519 .pdf
- MORA_Specification_V2.4_Revision_Notice_20210301_Final_DIST_A A520.pdf
- MORA_V2.4_ Specification_Atlas_Rev_F_Final_DIST_A A521.xlsx
- mora-wsdls-and-schemas-v2.4-DistA-20210225.zip
- VICTORY-Spec-Doc-V1-9-Dist-A-A787.pdf
- VICTORY_Architecture_A_DistroA_20190402.pdf
--------------------------------------------------------------------------------------------------------------------------------------------------
This Special Notice initially aims to make the Approved for Public Release, "Command, Control, Communication, Computers, Cyber, Intelligence, Surveillance and Reconnaissance / Electronic Warfare (C5ISR/EW) Modular Open Suite of Standards (CMOSS) Interoperability Requirements Specification" (CMOSS IRS) widely discoverable and available. The intent is to periodically modify this Special Notice to:
- make additional Approved for Public Release and/or Controlled Unclassified Information documentation discoverable and available (Public download, Transmittal upon Request, or link to Authoritative Sources, as appropriate);
- broadcast syndicated announcements for events or opportunities of interest to members of the CMOSS-enabled ecosystem
The purpose of the CMOSS Interoperability Requirements Specification is to provide a common, configuration-controlled, Science, Technology, Engineering, Experimentation, Test & Evaluation and Acquisition minimum baseline technical requirements document. This allows US Army (T), and Joint, Interagency, Intergovernmental, Multinational (JIIM) (O), materiel developers and integrators to ensure CMOSS compliant/conformant solutions are over-the-interface(s)-interoperable with other components/systems developed to the same "shalls". The requirements within this document should be incorporated by reference in contracts, citing the document title, revision number, and effective date of publication. 'CMOSS#####' Unique Identifiers (UID) will typically be linked as 'parent requirements' from which materiel system, subsystem, component, etc. 'child requirements' are derived. This CMOSS Interoperability Requirements Specification is under the configuration control of the chartered C5ISR Center MOSA Management Office (MMO).
MOSA MANAGEMENT OFFICE RESPONSIBILITIES
- Coordinate MOSA usage across C5ISR Center
- Review S&T projects and identify cross cutting opportunities to include MOSA
- Allocate MOSA implementation funding for labs, experimentation, and matrixed SME support
- Provide MOSA training for directorate SME’s
- Facilitate technology transition
- Manage and mature standards
- Develop and maintain the CMOSS and VICTORY specifications
- Develop compliance tools and support compliance verification
- C5ISR Center lead for standards bodies such as the SOSA(TM) Consortium
- Coordinate with external MOSA activities
- Provide MOSA support to the acquisition community
- Consolidate resource requests for MOSA support facilities and staff
- Support inclusion of MOSA in policy and programs
- Coordinate/represent MOSA with external partners
- CMOSS is a suite of standards to support the reduction of the size, weight and power of C5ISR and EW systems while increasing the flexibility and adaptability of these systems
- Universal A-Kit
- Project Managers field capabilities as cards into a common chassis
- Pooled radio resources such as antennas and amplifiers for Communications, Electronic Warfare (EW), and Signals Intelligence (SIGINT) systems
- Shared processing resources such as computers and displays
- Shared data services such as Position, Navigation, and Time (PNT)
- Foundation for enhanced interoperability and simultaneity between C5ISR systems
- Reduced life cycle cost through increased competition, smaller logistics tails with common sparing, and upgrading to the latest hardware as parts are replaced
- Rapid insertion of new technology/capability
Attachments
20220310-CMOSS-IRS-v1-1-Dist-A-A518.pdf (Public)
and
CMOSS Overview 18Mar22 Dist A A758.pdf (Public)
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 20220310-CMOSS-IRS-v1-1-Dist-A-A518.pdf1.2 MB, March 24, 2022
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 17, 2024
Special notice
Due March 23, 2027 at 4:00 PM EDT. SAM.gov, notice d9bd12398f1d4791855dba898e3d69ec
July 15, 2026
Special notice
Due March 23, 2027 at 4:00 PM EDT. SAM.gov, notice fed0b08539ab448c8374cc0de4286470
5 revisions on SAM
- July 15, 2026: publish, special notice
- October 17, 2024: publish, special notice
- July 14, 2022: publish, special notice
- April 22, 2022: publish, special notice
- March 24, 2022: publish, special notice
Points of contact
- Jason DirnerMMO@army.mil
- John Nilsenusarmy.apg.devcom-c5isr.mbx.mmo@army.mil