Presolicitation
Repair & Maintain Airfield Stormwater System Phase II
FGWB21000AB_3
Department of the Air Force, FA6703 94TH Contracting Flight PK. Water and Sewer Line and Related Structures Construction.
Response deadline
August 10, 2026 at 2:00 PM EDT
Closed 37 days ago. Posted June 24, 2026. Scheduled to archive August 25, 2026.
Description
As published on SAM.gov.
While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield.
In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 24, 2026
Presolicitation
Due August 10, 2026 at 2:00 PM EDT. SAM.gov, notice e13bbe6329794a52b4592844b9d10915
Points of contact
- Kevin Songkevin.song@us.af.mil6786553695
- Kenneth Jacobkenneth.jacob.1@us.af.mil6786555745
Also open from this buyer
- Cable Fiber Install ATC Tower Dobbins ARBSolicitationSmall businessNAICS 238210GeorgiaFA670326Q0015Closes in 2 daysSep 18
- Laundry and Dry-Cleaning CBRNE Mobility GearCombined synopsis and solicitationSmall businessNAICS 812320FA670326Q0014Closes in 7 daysSep 23
- TRCS-T1A-TAN FreezerSolicitationSmall businessNAICS 333415GeorgiaFA670326Q0013Closes in 8 daysSep 24