Solicitation, total small business set-aside
Tunnel 9 Pitch Upgrade
FA9101T9PU
Department of the Air Force, FA9101 Aedc PKP Procrmnt BR. Fluid Power Valve and Hose Fitting Manufacturing.
Offers due
November 6, 2026 at 11:00 AM EST
3 days from now. Posted November 2, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Next from this buyer
- RWP - Advanced Navigation Simulation Environment Laboratory (ANSEL)SolicitationNAICS 541330Holloman AFB, NMFA9101269ANSELCloses in 9 daysNov 12
- RWP - Test Site 2 (TS2) Improvements & Modernization, Aerospace Vehicle Survivability Facility (AVSF)SolicitationNAICS 236220Wright-Patterson AFB, OHFA9101269TS2Closes in 13 daysNov 16
- Small CNC Vertical Milling MachineSources soughtSmall businessNAICS 333517Anywhere in the USFA910127QB0XX_Small_CNC_Vertical_Milling_MachineCloses in 368 daysNov 6, 2027
Similar, open now
- VALVE,HYDRAULIC,DUMP
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 332912Anywhere in the USSPE7MC27Q0030Closes tomorrowNov 3 - VALVE,BLEEDER,HYDRAULI
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 332912Anywhere in the USSPE7MC27Q0023Closes in 2 daysNov 4 - Dewatering Panel Swagelok
Department of the Navy, Norfolk Naval Shipyard GF
SolicitationNAICS 332912Anywhere in the USN4215827QE004Closes in 2 daysNov 5
All 18 open in fluid power valve and hose fitting manufacturing
Description
As published on SAM.gov.
The Arnold Engineering Development Complex (AEDC) Tunnel 9, located in Silver Spring, MD, requires the comprehensive modernization of a high-performance hydraulic motion system. The scope of this Firm Fixed-Price (FFP) requirement includes the design, engineering, procurement, off-site fabrication, pre assembly, on-site demolition, installation, and commissioning of core system components. All components must comply with ASME B31.1, ASME BPVC VIII, and ISO 4406 standards. Core components include:
• Primary control valve (step response time of 55 ms or less) • Main actuating cylinder (working stroke of 120.5” capable of achieving a linear speed of 13 ft/s) • Hydraulic Power Unit (HPU) • Dedicated filtration and cooling "kidney" loop.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 2, 2026
Solicitation, originally sources sought
Due November 6, 2026 at 11:00 AM EST. SAM.gov, notice 512b434e9f0a40e4bad9899a41cc7fba
Points of contact
- Maddux Goldenmaddux.golden@us.af.mil
- Erica Anglinerica.anglin@us.af.mil