Sources sought, total small business set-aside

Design/Bid/Build – Renovate Permanent Party Dorm B331, Altus AFB, OK

FA8903RenovatePermanentPartyDormB331AltusAFBOK

Department of the Air Force, FA8903 772 Ess PK. Commercial and Institutional Building Construction.

Response deadline

February 18, 2025 at 3:00 PM EST

Closed 577 days ago. Posted February 14, 2025, first published February 7, 2025. Scheduled to archive March 5, 2025.

Description

As published on SAM.gov.

14 Feb 2025 - The purpose of this posting is to revise Attachment 1. No other changes. The Government plans to execute a FY25 Construction project for a Design-Bid-Build execution to Renovate Permanent Party Dorm B331 at Altus AFB, OK, Project Number AGGN231002. Built in 1984, the 3-Story Dormitory 331 at Altus AFB, OK has received no major upgrades or renovations since construction. The dormitory currently houses 102 Airmen in 33,750 square feet.

The project is planned to repair Dormitory 331 functionality, described the AFI 32-6000, Housing Management. All work shall be accomplished in accordance with (IAW) the contract specifications, drawings, and as directed by the Contracting Officer (CO). This scope of work for this project will include the following:

Replacement of all structural interior design elements Repair of exterior envelope of the dormitory to include, roof, glazing and exterior doors Replace and modernize dormitory communication system Replace existing 2-pipe HVAC system and distribution systems in its entirety Replace entire electrical distribution system Repair site grading to provide appropriate draining, prevent damage to pavements and prevent ponding Retrofit the laundry and day room areas for a tornado shelter Replace all facility related controls with systems that are installed with the cybersecurity measures required by UFC 4-010-06, Cyber Security Related Controls Remediate Asbestos Containing Material (ACM) and Lead Based Paint (LBP) Replace all Furniture, Fixtures, and Equipment (FF&E) Replace all Communications Cabling and Equipment This project does require third party certification of the High Performing Sustainable Building (HPSB) requirements.

The Period of Performance is estimated at 15 Months. The Magnitude of Construction is between $10,000,000 and $25,000,000. All interested Small Businesses, certified HUBZONE, 8(a), WOSB, or SDVOSB contractors should respond to this survey via email by Tuesday, February 18, 2025 by 2:00 PM Central Standard Time.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 7, 2025

    Sources sought

    Due February 18, 2025 at 3:00 PM EST. SAM.gov, notice 4236c961a0524a82b69dc2f36b0b48a6

  2. February 14, 2025

    Sources sought

    Due February 18, 2025 at 3:00 PM EST. SAM.gov, notice 0dbaf963c11c4598a20b57a4708b5e03