Sources sought, total small business set-aside
Design/Bid/Build – Renovate Permanent Party Dorm B331, Altus AFB, OK
FA8903RenovatePermanentPartyDormB331AltusAFBOK
Department of the Air Force, FA8903 772 Ess PK. Commercial and Institutional Building Construction.
Response deadline
February 18, 2025 at 3:00 PM EST
Closed 577 days ago. Posted February 14, 2025, first published February 7, 2025. Scheduled to archive March 5, 2025.
Description
As published on SAM.gov.
14 Feb 2025 - The purpose of this posting is to revise Attachment 1. No other changes. The Government plans to execute a FY25 Construction project for a Design-Bid-Build execution to Renovate Permanent Party Dorm B331 at Altus AFB, OK, Project Number AGGN231002. Built in 1984, the 3-Story Dormitory 331 at Altus AFB, OK has received no major upgrades or renovations since construction. The dormitory currently houses 102 Airmen in 33,750 square feet.
The project is planned to repair Dormitory 331 functionality, described the AFI 32-6000, Housing Management. All work shall be accomplished in accordance with (IAW) the contract specifications, drawings, and as directed by the Contracting Officer (CO). This scope of work for this project will include the following:
Replacement of all structural interior design elements Repair of exterior envelope of the dormitory to include, roof, glazing and exterior doors Replace and modernize dormitory communication system Replace existing 2-pipe HVAC system and distribution systems in its entirety Replace entire electrical distribution system Repair site grading to provide appropriate draining, prevent damage to pavements and prevent ponding Retrofit the laundry and day room areas for a tornado shelter Replace all facility related controls with systems that are installed with the cybersecurity measures required by UFC 4-010-06, Cyber Security Related Controls Remediate Asbestos Containing Material (ACM) and Lead Based Paint (LBP) Replace all Furniture, Fixtures, and Equipment (FF&E) Replace all Communications Cabling and Equipment This project does require third party certification of the High Performing Sustainable Building (HPSB) requirements.
The Period of Performance is estimated at 15 Months. The Magnitude of Construction is between $10,000,000 and $25,000,000. All interested Small Businesses, certified HUBZONE, 8(a), WOSB, or SDVOSB contractors should respond to this survey via email by Tuesday, February 18, 2025 by 2:00 PM Central Standard Time.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Samuel Mendezsamuel.mendez@us.af.mil210-854-6081
- Laura Kooglaura.koog@us.af.mil
Also open from this buyer
- Remote Video Game KitsSolicitationNAICS 339930TexasFA890326A067696001Closes in 3 daysSep 21
- Book and Audiobook Point PlanCombined synopsis and solicitationNAICS 516210TexasFA890326A068824Closes in 3 daysSep 21
- Request for Lease Proposal (RFLP) Enhanced Use Lease Project Nellis Air Force Base, NV. Amendment 2SolicitationNAICS 531120Nellis AFB, NVAFCEC-26-R-0007Closes in 6 daysSep 24
- REQUEST FOR INFORMATION MINERAL PROCESSING LEASING OPPORTUNITIESSources soughtNAICS 53119Mountain Home AFB, IDAFCEC-26-R-0011Closes in 21 daysOct 9
- NEW - Air Force Installation and Mission Support Center (AFIMSC) Streamlining Procurement for Effective Execution & Delivery (SPEED) Commercial Solutions Opening (CSO)Combined synopsis and solicitationNAICS 541FA890326SC001Closes in 1441 daysAug 29, 2030