Skip to content
Abierto

Presolicitation, first published as special notice

MACH1_AOI_Muns_Igloos at Dyess AFB - LOE 1 and LOE 2_Amend 1

FA8903-26-OT003

Department of the Air Force, FA8903 772 Ess PK.

Response deadline

September 9, 2026 at 11:00 AM EDT

Closed 7 days ago. Posted September 2, 2026, first published August 21, 2026. Scheduled to archive September 24, 2026.

Description

As published on SAM.gov.

Update 2 Sept 2026 – Release of Government Responses to Industry Questions.

See attachment: QnA - Gov Responses - 2Sept2026 Amendment 1 (25 Aug 26) Updates: "Presolicitation" This MACH1_AOI opportunity is updated with the following changes: 1. Previous Versions published as a "Special Notice" (Posting Type) were deleted & replaced with this "Presolicitation" posting 2. "Related Notice" block now reflects the associated MACH1_Parent Notice [FA8903-OT-MACH1] Original AOI Posting (21 Aug 2026) "Special Notice" This Area of Interest (AOI) is published under the Modernized Agile Construction Horizons (MACH1) Umbrella Program Notice.

All submissions must adhere to the procedures and guidelines outlined in the parent MACH1 framework document unless otherwise tailored herein. Any resulting agreement will be an Other Transaction Agreement (OTA) executed under the statutory authority of 10 U.S.C. § 2808a.

The 772nd Enterprise Sourcing Squadron (772 ESS) is seeking innovative commercial design and engineering partners to develop a comprehensive, site-specific design package for rapidly deployable Earth-Covered Munitions (ECM) storage facilities at Dyess AFB, Texas. The Government requires rapidly deployable Class V munitions storage facilities to support evolving global threats and warfighter readiness.

Traditional MILCON processes and standard ECM build face structural and procedural bottlenecks—ranging from slow curing times to complex bespoke formwork—that prevent rapid deployment. This AOI seeks architectural and engineering innovations that bypass these traditional bottlenecks.

The Government is looking for design concepts incorporating advanced formwork, rapid-curing materials, modular structural arches, or other commercial methodologies that accelerate the timeline while fully maintaining all required blast resistance, structural integrity, and environmental controls. There are (2) two lines of effort (LOEs) for this requirement: LOE 1 - Design & Planning (Design) and LOE 2 - Physical Construction. See attachment PDF: MACH1_AOI_FA890326OT003_Muns_Igloos_Dyess_ 21 Aug 26.pdf

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 21, 2026

    Special notice

    MACH1_AOI_Muns_Igloos at Dyess AFB - LOE 1 and LOE 2

    Due September 9, 2026 at 11:00 AM EDT. SAM.gov, notice f0e50b48383d44e4b8ed17fab2bef02c

  2. August 25, 2026

    Presolicitation, originally sources sought

    Due September 9, 2026 at 11:00 AM EDT. SAM.gov, notice bcdb53c4b01747f08785b6d18ace12d4

  3. September 2, 2026

    Presolicitation

    Due September 9, 2026 at 11:00 AM EDT. SAM.gov, notice 3f687d26b1264d028b0c707db4823b25

Points of contact