Skip to content
Abierto

Solicitation, 8(a) set-aside, first published as presolicitation

C-17 PSE - Adapter, Cable Breakout

FA8526-24-Q-0007

Department of the Air Force, FA8557 AFLCMC WLMKB. Other Aircraft Parts and Auxiliary Equipment Manufacturing.

Response deadline

March 28, 2024 at 5:00 PM EDT

Closed 903 days ago. Posted March 4, 2024, first published January 25, 2024. Scheduled to archive April 12, 2024.

Description

As published on SAM.gov.

4 MAR 2024- This solicitation is being canceled due to it being a direct 8(a). 1 MAR 2024 - A solicitation amendment is required to change this aquisition to 8(a) only.

Amendment 01 is expected to be released around 15 MAR 2024. *8(a) Competitive Award* The C-17 Program Management Office has a requirement that is for a firm-fixed price contract for two (1) each NSN: 4920-01-299-3556, ADAPTER, CABLE BREAKOUT, P/N 17G410523-1, which includes one (1) First Article, one (1) First Article Test Plan, and one (1) First Article Test Report. The C-17 aircraft has a number of electrical and electro-mechanical devices.

These devices are required to be tested at the organizational and intermediate levels of maintenance. The organizational level, these devices are to be fault isolated by “breaking into” the electrical connectors of the device and providing a means to access the individual electrical conductors. Test instrumentation may now be attached to the circuit to monitor voltage and current levels as well as other parameters such as impedance and data trans-mission.

In addition, requirements exist to disconnect the aircraft interface cables from the LRU and measure the voltages and continuity at the cables as a means of fault isolation. Provisions must be made to prevent damage to the pins of the connector and eliminate the possibility of creating a spark near the aircraft while measurements are being made. A means must be provided to functionally test these LRU in the shop to determine if an item is operating within specified limits and is fit to be used on the aircraft.

Also means to fault isolate to the shop replaceable units (SRU) is to be provided. To achieve this, the input and output lines wil be connected to power sources and loads which will simulate those seen on the aircraft. An interface will be necessary between the device under test and the various pieces of test instrumentation. Delivery is FOB Destination with shipments in the continental United States. This requirement will be solicited as a competitive 100% Small Business-Set-Aside award.

All responsible sources may submit a quotation which shall be considered by the agency. The Government will utilize the Past Performance Information Retrieval System (PPIRS), Excluded Parties List System (EPLS), and other Government databases to determine contractor status before evaluating proposals. Proposals will be evaluated based on the criteria stated in the RFQ. All data for this weapon system is considered EXPORT CONTROLLED. Proposals are due 28 MARCH 2024 by 5:00 PM EST.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 25, 2024

    Presolicitation

    Due February 9, 2024 at 5:00 PM EST. SAM.gov, notice f1325c3bd2534d4ebbd5b5c3c545663b

  2. February 27, 2024

    Solicitation

    Due March 28, 2024 at 5:00 PM EDT. SAM.gov, notice e8c7d78cd9ac4c7aab730c3012c76215

  3. March 1, 2024

    Solicitation

    Due March 28, 2024 at 5:00 PM EDT. SAM.gov, notice 1f586cf1c08c4d7c83a79955966219ad

  4. March 4, 2024

    Solicitation

    Due March 28, 2024 at 5:00 PM EDT. SAM.gov, notice e19ca2b9b9a045989f09ceb38ae8df2d

Points of contact