Skip to content
  • 6,500 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

Repair, Spares, & Engineering Services Enterprise Contract Embedded Global Positioning System (GPS)/Inertial Navigation System (EGI)

FA8524-27-D-0602

Department of the Air Force, FA8524 AFSC Pzaaa. Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing.

Offers due

November 3, 2026 at 1:30 PM EST

10 days from now. Posted October 19, 2026, first published October 15, 2026.

Get an email when this is amended, when the deadline moves and when it is awarded.Watch it

Next from this buyer

Similar, open now

All 119 open in search, detection, navigation, guidance, aeronautical, and nautical system and instrument manufacturing

Description

As published on SAM.gov.

This follow-on effort is planned for a nine-year Period of Performance (PoP) spanning 10 September 2029 through 9 September 2038. The initial forecasted repair requirements are detailed in the attached RFI_Master List of NSNs, though the government reserves the right to modify specific NSN requirements in future correspondence. The government does not possess nor have rights to the technical data for these items. Furthermore, the government has designated these systems as commercial items. Prospective sources are advised that physical samples of these items are not available for evaluation.

The contractor shall furnish all material, support equipment, tools, test equipment, and services.  The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor’s facility. Contractor furnished material or parts used for replacement shall equal or exceed the quality of the original material or parts

Contractors/Institutions responding to this RFI are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. October 15, 2026

    Sources sought

    Due October 30, 2026 at 1:30 PM EDT. SAM.gov, notice d634729633ac46fcbf7543d4accb8c0d

    1 revisions on SAM
    • October 15, 2026: publish, sources sought
  2. October 19, 2026

    Sources sought

    Due November 3, 2026 at 1:30 PM EST. SAM.gov, notice c5ffc9ffe2be4117a129ed808d24741d

    2 revisions on SAM
    • October 19, 2026: publish, sources sought
    • October 15, 2026: publish, sources sought

Points of contact