Sources sought
Repair, Spares, & Engineering Services Enterprise Contract Embedded Global Positioning System (GPS)/Inertial Navigation System (EGI)
FA8524-27-D-0602
Department of the Air Force, FA8524 AFSC Pzaaa. Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing.
Offers due
November 3, 2026 at 1:30 PM EST
10 days from now. Posted October 19, 2026, first published October 15, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Next from this buyer
- Repair of the Attitude Heading Reference System (AHRS) Applicable to the TH-1H HelicopterPresolicitationNAICS 336413Anywhere in the USFD20602700066Closes in 8 daysNov 1
Similar, open now
- FARO Focus Core 100M Scanner
Department of the Air Force, FA8571 Maint Contracting AFSC Pzim
Combined synopsis and solicitationNAICS 334511Anywhere in the USFA857127Q0015Closes in 5 daysOct 29 - PROCESSOR,SIGNAL DATA
Defense Logistics Agency, DLA Land and Maritime
PresolicitationNAICS 334511Anywhere in the USSPRAL127R0001Closes in 11 daysNov 4 - Cross Over Network Waveguide Assembly Qualification and Production (P/Ns G638416-1)
Department of the Air Force, FA8507 Alcmc Eskc
Sources soughtNAICS 334511Anywhere in the USFA8507_CrossOverNetwork_SourcesSoughtCloses in 25 daysNov 18
Description
As published on SAM.gov.
This follow-on effort is planned for a nine-year Period of Performance (PoP) spanning 10 September 2029 through 9 September 2038. The initial forecasted repair requirements are detailed in the attached RFI_Master List of NSNs, though the government reserves the right to modify specific NSN requirements in future correspondence. The government does not possess nor have rights to the technical data for these items. Furthermore, the government has designated these systems as commercial items. Prospective sources are advised that physical samples of these items are not available for evaluation.
The contractor shall furnish all material, support equipment, tools, test equipment, and services. The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor’s facility. Contractor furnished material or parts used for replacement shall equal or exceed the quality of the original material or parts
Contractors/Institutions responding to this RFI are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- RFI_NGSC_EGI.pdf254 KB, October 15, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 15, 2026
Sources sought
Due October 30, 2026 at 1:30 PM EDT. SAM.gov, notice d634729633ac46fcbf7543d4accb8c0d
1 revisions on SAM
- October 15, 2026: publish, sources sought
October 19, 2026
Sources sought
Due November 3, 2026 at 1:30 PM EST. SAM.gov, notice c5ffc9ffe2be4117a129ed808d24741d
2 revisions on SAM
- October 19, 2026: publish, sources sought
- October 15, 2026: publish, sources sought
Points of contact
- (PCO) Leigh Ann Taylorleigh.taylor.3@us.af.mil4782311259
- Teresa Smithteresa.taylor.1@us.af.mil