Sources sought
Repairs of Circuit Card Assemblies, Power Supply, and Electronic Components Assembly for JETCAL® ANALYZER and Environmental Control System Tester
FA8517
Department of the Air Force, FA8517 AFSC Pzaac. Electronic and Precision Equipment Repair and Maintenance.
Response deadline
August 30, 2024 at 5:30 PM EDT
Closed 794 days ago. Posted August 15, 2024. Scheduled to archive August 30, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
53 like it are open now in electronic and precision equipment repair and maintenance
- Presolicitation Notice: Repair of the F-15 Digital Mapping System (DMS) Advanced Display Core Processor (ADCP)
Department of the Air Force, FA8538 AFSC Pzaab
PresolicitationNAICS 811210Warner Robins, GAFA8538-27-R-B004Closes in 3 daysNov 5 - RFI - Repair of C-5 COMPUTER, DIGITAL
Department of the Air Force, FA8538 AFSC Pzaab
Sources soughtNAICS 811210Warner Robins, GA28-00023Closes in 18 daysNov 20 - Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)
Department of the Air Force, FA8538 AFSC Pzaab
SolicitationNAICS 811210Warner Robins, GAFA853826R0017Closes in 23 daysNov 25
All 53 open in electronic and precision equipment repair and maintenance
Description
As published on SAM.gov.
The Government is conducting market research to identify potential sources that possess the data necessary to repair the circuit card assembly components;NSN 5998-01-087-7775 (P/N: BH19994-2)
Circuit Card, NSN 5998-01-300-9619 (P/N: BH27171-1)
Circuit Card, NSN 5998-01-276-1968 (P/N: BH25115-1)
Circuit Card, NSN 5998-01-072-2412 (P/N: BH19999-1)
Electronic Component, NSN 6130-01-586-6003 (P/N: BH27171-8)
Power Supply, NSN 5998-01-300-9618 (P/N: BH26573-1)
Circuit Card, NSN 5998-01-072-2441 (P/N: BH19998-1)
Circuit Card, NSN 5998-01-365-6058 (P/N: BH27443-1) Circuit Card. The level of security clearance and amount of foreign participation in this requirement has not been determined. Contractor shall furnish all material, support equipment, tools, test equipment, and services. The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor’s facility. Contractor furnished material or parts used for replacement shall equal or exceed the quality of the original material or parts. See attachement for more details.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 15, 2024
Sources sought
Due August 30, 2024 at 5:30 PM EDT. SAM.gov, notice 419ef167209842db8ad437aedacc6b06
Points of contact
- Erica Shumateerica.shumate@us.af.mil
- Marwa Fullermarwa.fuller@us.af.mil