Sources sought
RPL 300 Ton Chiller Robins AFB GA
FA8501SourcesSought
Department of the Air Force, FA8501 Opl Contracting Afsc/Pzio. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
July 23, 2024 at 4:00 PM EDT
Closed 838 days ago. Posted July 16, 2024, first published July 16, 2024. Scheduled to archive August 7, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
45 like it are open now in plumbing, heating, and air-conditioning contractors
- L7WC02_ B670 Paint Booth and HVAC
Department of the Air Force, FA8571 Maint Contracting AFSC Pzim
Combined synopsis and solicitationNAICS 238220Warner Robins, GAFA857127Q0002Closes in 4 daysNov 12 - CGC SCIOTO WATER MIST FIRE PROTECTION SYSTEM
US Coast Guard, Cg-Sea-C22
Combined synopsis and solicitationSmall businessNAICS 238220Keokuk, IA70ZU0227Q0000282Closes tomorrowNov 9 - B41 Isolation Valve Installation
Department of Veterans Affairs, 256-Network Contract Office 16
Combined synopsis and solicitationSDVOSBNAICS 238220North Little Rock, AR36C25627Q0081Closes tomorrowNov 9
All 45 open in plumbing, heating, and air-conditioning contractors
Description
As published on SAM.gov.
INSTRUCTIONS This RFI contains a description of the requirement provided below. If after reading the description of the requirement below and you desire to participate in the Market Research, you should provide documentation that supports your company’s capability in meeting these requirements. Failure to provide documentation may result in the government being unable to adequately assess your capabilities.
If you lack sufficient experience in a particular area, please provide details explaining how you would overcome the lack of experience/capabilities in order to perform that portion of the requirement (i.e., teaming, subcontracting, etc.) Identify any areas of work that your organization believes should be broken out exclusively for Small Business Both large and small businesses are encouraged to participate in this Market Research. Joint ventures or teaming arrangements are encouraged.
Requirement The government has a requirement to replace chiller 2 (300 ton) at B228 at Robins AFB GA. Work shall include removing the old equipment to include chiller, pumps, pipping as necessary, refrigerant, and controls as necessary associated with chiller being replaced. Installation of new chiller, pumps, pipes, refrigerant, etc. as required for full operation of cooling generation.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- SrA Miranda Hollandmiranda.holland.1@us.af.mil
- ANGELA WHITLEYangela.whitley@us.af.mil4789267989