Skip to content
  • 7,272 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

TINKER AFB MAC BOA WWYK190099 INSULATE AND INSTALL VAPOR BARRIER ON EXISTING HEATING AND CHILLED WATER PIPE B3708

FA813726R0017

Department of the Air Force, FA8137 AFSC Pzioc. Commercial and Institutional Building Construction.

Response deadline

April 30, 2026 at 3:00 PM EDT

Closed 189 days ago. Posted April 29, 2026, first published April 7, 2026. Scheduled to archive May 1, 2026.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2026

192 like it are open now in commercial and institutional building construction

All 192 open in commercial and institutional building construction

Description

As published on SAM.gov.

***** THIS PROJECT IS CANCELED *****

No responses required from MAC BOA Holder GC's that attended site visit.

Only the MAC BOA Holder GCs that attended Site Visit on 15 April 2026 will be able to continue forward toward the award.

Updated 20 April 2026

Initial site visit sign in sheet attached.  Reminder that RFIs are due 21 April 2026.

Only the MAC BOA Holder GCs that attended Site Visit on 15FApril 2026 will be able to continue forward toward the award.

Only the MAC BOA Holder GCs that attended Site Visit on 15 April 2026 will be able to continue forward toward the award.

Updated 15 April 2026

Solicitation Rev1 is attached, proposals due 18 May 2026

Solicittion Section L & M are attached

Initial site visit sign in sheet attached.  Reminder that RFIs are due 21 April 2026.

As built drawings attached.

If a Prime MAC BOA GC is in need of any other documents to provide a proposal, please contact the CO.

Only the MAC BOA Holder GCs that attended Site Visit on 15FApril 2026 will be able to continue forward toward the award.

This posting is for Tinker AFB - MAC BOA Holders ONLY.  

Project Solicitation Number:  FA813726R0017

Project Title: WWYK190099 – INSULATE AND INSTALL VAPOR BARRIER ON EXISTING HEATING AND CHILLED WATER PIPE
Project Location: Tinker AFB - B3708

The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the replacement of the chilled water piping insulation in B3708 at Tinker Air Force Base (AFB), Oklahoma

The estimated project value is below $25M and is restricted to SB MAC BOA holders only.

Project specific documents are attached to this posting.

If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission.  In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to.  Do not include any Sub-Contractor email addresses.

Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.

This posting is for Tinker AFB - MAC BOA Holders ONLY.  

After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.  Your RSVP email must be received within 3 calendar days from the posting of this project.  In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access.  If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access.   ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.

Initial Site Visit is currently set for 15 April 2026 at 0900 CT, we will meet at the North entrance for B3708.

You must attend the Initial Site Visit for the project to be considered eligible to propose.

This posting is for Tinker AFB - MAC BOA Holders ONLY.  

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 7, 2026

    Combined synopsis and solicitation

    Due May 18, 2026 at 3:00 PM EDT. SAM.gov, notice 2aee1d93248c40c29f2d2da1e118366d

    5 revisions on SAM
    • April 29, 2026: publish, combined synopsis and solicitation
    • April 20, 2026: publish, combined synopsis and solicitation
    • April 15, 2026: publish, combined synopsis and solicitation
    • April 15, 2026: publish, combined synopsis and solicitation
    • April 7, 2026: publish, combined synopsis and solicitation
  2. April 15, 2026

    Combined synopsis and solicitation

    Due May 18, 2026 at 3:00 PM EDT. SAM.gov, notice a14a57d0a85d4880a98d701583cbfe0a

    5 revisions on SAM
    • April 29, 2026: publish, combined synopsis and solicitation
    • April 20, 2026: publish, combined synopsis and solicitation
    • April 15, 2026: publish, combined synopsis and solicitation
    • April 15, 2026: publish, combined synopsis and solicitation
    • April 7, 2026: publish, combined synopsis and solicitation
  3. April 15, 2026

    Combined synopsis and solicitation

    Due May 18, 2026 at 3:00 PM EDT. SAM.gov, notice b1ec0cfbca3a4cfcbde31f015bb19633

    5 revisions on SAM
    • April 29, 2026: publish, combined synopsis and solicitation
    • April 20, 2026: publish, combined synopsis and solicitation
    • April 15, 2026: publish, combined synopsis and solicitation
    • April 15, 2026: publish, combined synopsis and solicitation
    • April 7, 2026: publish, combined synopsis and solicitation
  4. April 20, 2026

    Combined synopsis and solicitation

    Due May 18, 2026 at 3:00 PM EDT. SAM.gov, notice 7c65608d3ca1403b975e1e87715f10df

    5 revisions on SAM
    • April 29, 2026: publish, combined synopsis and solicitation
    • April 20, 2026: publish, combined synopsis and solicitation
    • April 15, 2026: publish, combined synopsis and solicitation
    • April 15, 2026: publish, combined synopsis and solicitation
    • April 7, 2026: publish, combined synopsis and solicitation
  5. April 29, 2026

    Combined synopsis and solicitation

    Due April 30, 2026 at 3:00 PM EDT. SAM.gov, notice f1e4d5f9b54e44e084e426eaed84a2de

    5 revisions on SAM
    • April 29, 2026: publish, combined synopsis and solicitation
    • April 20, 2026: publish, combined synopsis and solicitation
    • April 15, 2026: publish, combined synopsis and solicitation
    • April 15, 2026: publish, combined synopsis and solicitation
    • April 7, 2026: publish, combined synopsis and solicitation

Points of contact