Solicitation, total small business set-aside
Tinker AFB MAC BOA WWYK230052, Replace Vault and Fuel Tank, B1032
FA813725R0033
Department of the Air Force, FA8137 AFSC Pzioc. Commercial and Institutional Building Construction.
Response deadline
June 26, 2025 at 3:00 PM EDT
Closed 500 days ago. Posted June 18, 2025, first published May 12, 2025. Scheduled to archive December 1, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
190 like it are open now in commercial and institutional building construction
- Minor Construction / Sustainability, Repair and Maintenance
Department of the Army, W6QK ACC-RI
Combined synopsis and solicitationNAICS 236220McAlester, OKW519TC-26-Q-JOC1Closes in 8 daysNov 16 - WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Department of the Air Force, FA8137 AFSC Pzioc
SolicitationWOSBNAICS 236220OklahomaFA813727R0002Closes in 15 daysNov 23 - Child Development Center (CDC), Tinker Air Force Base, Oklahoma
Department of the Army, W076 Endist Tulsa
Closes in 23 daysDec 1
All 190 open in commercial and institutional building construction
Description
As published on SAM.gov.
Only the MAC BOA Holder GCs that attended Site Visit on 22 May 2025 will be able to continue forward toward the award. Updated 18 Jun 2025 Uploaded Revised SOW, Revised Submittal Register, and Technical Specifications.
If any other documents are needed for proposals, email POCs
Only the MAC BOA Holder GCs that attended Site Visit on 22 May 2025 will be able to continue forward toward the award.
Only the MAC BOA Holder GCs that attended Site Visit on 22 May 2025 will be able to continue forward toward the award. Updated 13 Jun 2025 Uploaded WWYK230052 RFI Responses COR Signed.
New Submittal Register will be uploaded when available
Only the MAC BOA Holder GCs that attended Site Visit on 22 May 2025 will be able to continue forward toward the award.
Only the MAC BOA Holder GCs that attended Site Visit on 22 May 2025 will be able to continue forward toward the award. Updated 22 May 2025 Uploaded the Contractor Initial Site Visit Sign-in Sheet Only the MAC BOA Holder GCs that attended Site Visit on 22 May 2025 will be able to continue forward toward the award.
Only the MAC BOA Holder GCs that attended Site Visit on 22 May 2025 will be able to continue forward toward the award. Updated 16 May 2025 Uploaded Solicitation FA813725R0033 Only the MAC BOA Holder GCs that attended Site Visit on 22 May 2025 will be able to continue forward toward the award.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number:
FA813725R0033 Project Title: WWYK230052, Replace Vault and Fuel Tank, B1032 Project Location: Tinker AFB - B1032 Remove existing concrete vault, fuel tank and vault at B1032(diesel) and associated accessories (underground fuel lines, conduit, vent piping, etc) and install4 new fuel tanks, associated accessories, and fill stations inside B1032.1) Construction only contract; Remove the existing concrete vault, fuel tank, and all associated piping andaccessories and install 4 new fuel tanks inside B1032, and all associated piping andaccessories.
This project will require Contractors be a licensed underground storage tank installer / remover with the Oklahoma Corporation Commission. Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to.
Do not include any Sub-Contractor email addresses. Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received by Monday, 19 May 2025 2:00 PM CT.
In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, the site visit will be conducted 22 May 2025, 9:00 AM - 10:00 AM, You must attend the Initial Site Visit for the project to be considered eligible to propose. Current date and time for site visit is 22 May 2025, 9:00 AM CT - 10:00 AM CT Location: Building 1032 This posting is for Tinker AFB - MAC BOA Holders ONLY.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 12, 2025
Solicitation
Due June 26, 2025 at 3:00 PM EDT. SAM.gov, notice e0ec8ab1323a43a49952c237bead2972
May 16, 2025
Solicitation
Due June 26, 2025 at 3:00 PM EDT. SAM.gov, notice 323cfcb537c14030815e6b075acab708
May 22, 2025
Solicitation
Due June 26, 2025 at 3:00 PM EDT. SAM.gov, notice b457795db97046a193061c6275dacfea
June 13, 2025
Solicitation
Due June 26, 2025 at 3:00 PM EDT. SAM.gov, notice c907a05df4024dff9dbe0cd151fa046a
June 18, 2025
Solicitation
Due June 26, 2025 at 3:00 PM EDT. SAM.gov, notice ab9b575b4bb848e5ba8ce6ce0d316b8e
Points of contact
- Eric Owenseric.owens.8@us.af.mil4057363414
- Stephen Palmerstephen.palmer@us.af.mil4057394182