Presolicitation, hubzone set-aside
Renovate B203 for C130J Conversion
FA665626B0004
Department of the Air Force, FA6656 910 Aw LGC Yngstn WRN Arpt. Commercial and Institutional Building Construction.
Response deadline
September 9, 2026 at 10:00 AM EDT
Closed 53 days ago. Posted July 17, 2026. Scheduled to archive September 24, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed 53 days ago
184 like it are open now in commercial and institutional building construction
- REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Department of the Army, W072 Endist Louisville
Sources soughtNAICS 236220Wright-Patterson AFB, OHWright-Patterson Air Force BaseW912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFBCloses tomorrowNov 2 - SABER FY 27-32
Department of the Air Force, FA8601 AFLCMC Pzio
Solicitation8(a)NAICS 236220OhioFA860126R0019Closes in 5 daysNov 6 - RWP - Test Site 2 (TS2) Improvements & Modernization, Aerospace Vehicle Survivability Facility (AVSF)
Department of the Air Force, FA9101 Aedc PKP Procrmnt BR
SolicitationNAICS 236220Wright-Patterson AFB, OHFA9101269TS2Closes in 15 daysNov 16
All 184 open in commercial and institutional building construction
Description
As published on SAM.gov.
This project provides the necessary upgrades to building #203 aircraft engine shop, to maintain the required number of new C130J aircraft engines and propellers to support the YARS mission. The renovations to building 203 include the construction of enclosed areas within the existing workshop, facilitating the ability to maintain and store engines on stands, as well as a room to perform repairs of the J-model propeller blades. These rooms will be temperature and humidity-controlled to meet storage and repair requirements. Any current equipment located within the shop space area may need to be altered to accommodate the new climate-controlled spaces. As-builts on the facility are available in base civil engineering. During construction a DD form 1354 is to be filled out and upon completion of work, is to be provided to the Civil Engineering Office as well as red line drawings, as-built drawings, and CAD files detailing changes made to the drawings provided by Civil Engineering. All construction shall meet Unified Facilities Criteria (UFC), National Fire Protection Association (NFPA), National Electric Code (NEC & NFPA 70), as well as all other standards encompassed in the scope of work performed.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Presolicitation.docx17 KB, July 17, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 17, 2026
Presolicitation
Due September 9, 2026 at 10:00 AM EDT. SAM.gov, notice fff110c567e94cc89fd5e95d963a5535
1 revisions on SAM
- July 17, 2026: publish, presolicitation
Points of contact
- Kimberly S. Hitchcockkimberly.hitchcock.1@us.af.mil330-609-1386
- Joseph Perryjoseph.perry.14@us.af.mil3306091212