Skip to content
  • 8,092 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

Enterprise General Construction MATOC (RFI 2)

FA664326_0002-1

Department of the Air Force, FA6643 Af Reserve CMD HQ Afrc PK. Commercial and Institutional Building Construction.

Response deadline

March 24, 2026 at 2:00 AM EDT

Closed 228 days ago. Posted March 11, 2026. Scheduled to archive April 8, 2026.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2026

189 like it are open now in commercial and institutional building construction

All 189 open in commercial and institutional building construction

Description

As published on SAM.gov.

CONTRACTING OFFICE ADDRESS

Department of the Air Force, Headquarters (HQ) Air Force Reserves Command (AFRC)/PK, Robins Air Force Base – 741 Lakeside Dr, Warner Robins, Georgia 31098. 

POINT OF CONTACT

Submit Responses to:

Ms. Biannica Glay at biannica.glay@us.af.mil, AND

Mr. Craig Keelen at craig.keelen@us.af.mil

All responses shall be submitted no later than Tuesday, 24 March 2026 by 2:00 pm EST.

REQUIREMENT DESCRIPTION

This is a Request for Information (RFI), NOT a Request for Quote (RFQ) or Request for Proposal (RFP). This RFI will be utilized for market research purposes ONLY, in order to assist with the planning and potential procurement of a Multiple Award Task Order Contract (MATOC) for general construction projects across the continental United States.  

The information provided in the RFI is subject to change and is not binding on the Government. Responses to these notices are not offers and cannot/will not be accepted by the Government to form a binding contract. All submissions become Government property and will not be returned.

An in-depth requirement description may be found in Attachment 1 – Draft Performance Work Statement – AFRC Enterprise MATOC. Please note, this is a “draft” performance work statement (PWS) and is subject to change throughout acquisition planning.

DRAFT SCOPE

General Scope: The overall scope includes the execution of general construction projects, which may involve new construction, alteration, renovation, demolition, and repair of real property and infrastructure. 

Potential Types of Work: The following list is representative of the types of work that may be ordered under this contract but is not exhaustive. The Government reserves the right to order other construction services not explicitly listed that fall within the general scope of this PWS. 

  • Facility Repair and Renovation: Interior and exterior alterations, including, but not limited to, carpentry, drywall installation and finishing, flooring systems (carpet, tile, resilient), painting, furnishing installation, and millwork.
  • Roofing Systems: Repair, replacement, and maintenance of various low-slope and steep-slope roofing systems, including built-up roofing (BUR), modified bitumen, single-ply (TPO, EPDM), and standing seam metal roofs. Includes all associated flashing, insulation, and drainage components.
  • Mechanical Systems: Repair and replacement-in-kind of Heating, Ventilation, and Air Conditioning (HVAC) components and systems, including package units, split systems, chillers, boilers, ductwork, and associated controls, based on Government-provided specifications.
  • Electrical and Plumbing Systems: Upgrades, repair, and maintenance of interior and exterior systems. Includes power distribution, panelboards, lighting, low-voltage systems (fire alarm, communications), interior plumbing, fixtures, and utility connections. 
  • Painting and Coatings: Application of interior and exterior paints and high-performance industrial coatings on various substrates, including surface preparation in accordance with specifications.
  • Horizontal Construction: Paving, repair, and maintenance of asphalt and concrete roads, parking lots, and sidewalks. Includes pavement markings, striping, and related site appurtenances. 
  • Airfield Maintenance: Specialized airfield work to include runway and taxiway rubber removal, spall repair, joint sealing, and minor pavement repairs. 
  • Site Work and Demolition: Includes excavation, grading, storm drainage systems, utility trenching, and demolition of facilities and structures. 

PRIMARY PERFORMANCE LOCATIONS

  • Grissom Air Reserve Base, Indiana
  • March Air Reserve Base, California
  • Niagara Falls Air Reserve Station, New York
  • Pittsburgh Air Reserve Station, Pennsylvania
  • Westover Air Reserve Base, Massachusetts
  • Naval Air Station Joint Reserve Base Ft Worth, Texas
  • Homestead Air Reserve Base, Florida
  • Dobbins Air Reserve Base, Georgia
  • Robins Air Force Base, Georgia
  • Minneapolis St Paul Air Reserve Station, Minnesota
  • Youngstown Air Reserve Station, Ohio

PURPOSE

The purpose of this notice is to conduct additional market research for a known agency requirement. The Government has completed its initial market research based on the responses to our first RFI regarding this requirement. That feedback provided invaluable support in shaping our proposed acquisition strategy. The purpose of this second, more focused RFI is to present our proposed strategy back to industry for final comment and validation before we proceed with drafting the solicitation. This is a crucial final step to ensure the resulting contract is effective, efficient, and structured for robust competition.

The information gathered will be used to refine the scope, structure, and terms of a potential future solicitation.

The Contracting Officer may host one-on-one meetings with any or all potential offerors who provide an adequate response to the RFI/SS, without further public notice.

NAICS CODE

Tentative North American Industrial Classification System (NAICS) Code is 236220 – Commercial and Industrial Building Construction. Please NOTE: this is a tentative NAICS Code and may be subject to change as a result of additional market research.

ANTICIPATED CONTRACT TYPE/PERIOD OF PERFORMANCE

The Government anticipates awarding one or more Indefinite Delivery/Indefinite Quantity (IDIQ) contracts. The resultant contracts will have a continuous five-year ordering period.

Individual task orders issued will be Firm-Fixed-Price (FFP) and will contain their own unique Period of Performance.

Throughout the ordering period, the Government will monitor contractor performance via mechanisms such as Contractor Performance Assessment Reporting System (CPARS). The Government may also include provisions for on-ramping new contractors or off-ramping existing contractors to ensure a robust, competitive, and high-performing industrial base. The solicitation may also include FAR Clause 52.217-9, Option to Extend the Term of the Contract, for a potential six-month extension to the ordering period

PROJECTED CONTRACT AWARD DATE

TBD – FY27

PROJECTED VALUE

$600M+

INFORMATION REQUESTED

All interested vendors must submit their responses by completing the 16-question survey at the following link:

https://forms.osi.apps.mil/r/G9YwyMPnTT

A complete and sufficient response to all questions is mandatory. The Contracting Officer will deem submissions with incomplete or insufficient answers unacceptable.

Please be advised that a capabilities statement or brief is not requested and should not be submitted. Only responses provided through the official Microsoft Forms link will be considered.

The Contracting Officer will review and consider all responses and/or questions received. However, the Contracting Officer is not required to implement any of the feedback and/or suggestions received. The Contracting Officer will not provide a written and/or verbal response to any questions received.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 11, 2026

    Sources sought

    Due March 24, 2026 at 2:00 AM EDT. SAM.gov, notice 97374044703e499e96d3c73d3b24787a

    1 revisions on SAM
    • March 11, 2026: publish, sources sought

Points of contact