Sources sought
Containerized Dry Ice Production Facility
FA560625QA044
Department of the Air Force, FA5606 52 Cons Da LGC. Industrial Gas Manufacturing.
Response deadline
August 5, 2025 at 7:00 AM EDT
Closed 453 days ago. Posted July 29, 2025. Scheduled to archive August 7, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
9 like it are open now in industrial gas manufacturing
- HYDROGEN,REACTOR GR
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 325120Anywhere in the USN0010427QBB30Closes in 15 daysNov 16 - 501 - Dry Ice - Base 4
Department of Veterans Affairs, 262-Network Contract Office 22
Sources soughtNAICS 325120Albuquerque, NM36C26227Q0076Closes in 3 daysNov 4 - Notice of Intent to Sole Source: Commercial Industrial and Liquid Gases and Cylinder Maintenance
Department of the Army, W6QK ACC-APG Cont CT Tyad Ofc
PresolicitationNAICS 325120Anywhere in the USW51AA1-27-N-0001Closes in 5 daysNov 6
Description
As published on SAM.gov.
- Sources Sought for Market Research Pusposes only - The Propulsion flight is seeking a dry ice maker that is integrated into an ISO Transportable Container, divided into a machine and filling room capable of producing up to 120kg/265lb of dry ice pellets or nuggets per hour. The system must be able to operate in an outdoor environment. The system should be ready to use by supplying electrical power (3 phase 400V + N + PE 50 Hz, 10kW), liquid CO2 (16-22 bar/232-319 psi), and compressed air as a mobile solution.
The minimum container dimensions needed are 2.99m (117 in) Length x 2.45m (96 in) Width x 2.9m (114 in) Height. The unit should weigh less than 3,500kg. The exterior should be painted and have the description and various Safety Warning emblems posted on the outside. It needs integrated lifting slats for easy transportation with a forklift and lift points for a crane. The unit must contain a 3mm (0.125 in) Die Plate capable of producing 3, 10, and 16mm nuggets.
The following items also need to be included: - Armstrong Kit, which regulates the pressure of incoming liquid CO2 - CO2 liquid and gaseous supply piping - Hydraulic Oil operation (ISO 46) - Integrated ventilation and air conditioning system - CO2 Safety Monitoring with visual/acoutstic alarm and 36W Interior lighting in both rooms - Container flilling and automatic stop system - Touchscreen function and self diagnostic system - Lockable motorized roll up door for secure access to filling room - Access door to Pelletizer machine room - Distribution box with circuit breakers and surge protectors - 2x 230V sockets in interior - Ventilation System with minimum airflow of 1000m3 per hour - Exterior paint: Corrosivity category C5, 2-layer 2K epoxy primer and 3-layer PU-paint - Spare parts kit for 2000 hours service The purchase of the hub should include an Engineering and Comissioning Support Services: - Pre-installation plan and customer site layout review - Layout plan and PI-Diagram - Review scope of work and Customer + Project/Activity Plan - Comissioning and Operator Training on customer site - Ability to support on-site customer service needs for repairs/malfunctions - Warranty for 2000 hrs of operation - Operating Temperature Limits: Air conditioning unit must be rated to from + 40 C to -15 C. Minimum Cooling 2,5 kW, Heating: 3,15 kW
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 29, 2025
Sources sought
Due August 5, 2025 at 7:00 AM EDT. SAM.gov, notice 6dbd1162da0a4f3b8cb29455a95534a2
Points of contact
- George Hydegeorge.hyde.de@us.af.mil00496565619549
- SSgt Damon Survinedamon.survine@us.af.mil496565619516