Repair Interior Ceiling Building 224

FA5270MB224

Department of the Air Force, FA5270 18 Cons PK. Commercial and Institutional Building Construction.

Response deadline

April 2, 2025 at 1:30 AM EDT

Closed 539 days ago. Posted March 18, 2025. Scheduled to archive April 17, 2025.

Description

As published on SAM.gov.

This project shall consist of but not limited to providing all field investigations, surveys, design, plant, labor, materials, equipment, supplies, transportation, third-party services, and incidental related work to design and execute construction work defined in this Statement of Work and the attached documents. The work includes all necessary finishing work to provide the Government with a final product that is fully functional and leaves no areas of the facility that appear incomplete or unfinished.

This project shall accomplish a design-build repair the true ceiling of B224. Work includes full Asbestos-Containing Material (ACM) abatement of the ceiling paint and repair spalls and cracks. Include any site preparation work such as temporary removal of the suspended ceiling, lighting system, alarm, electrical wiring and conduit, and ceiling hung air-condition unit.

Sustainable principles, to include life cycle cost- effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements. The scope of work may require the sampling, removal/abatement, and disposal of ACM, LBP, or other hazardous building materials. The Contractor shall determine the best technical design solution in conformance with current regulations.

The design and construction work shall comply with US federal, Department of Defense, Air Force, and 18 Wing criteria, as well as applicable Japan regulatory requirements not specifically stated elsewhere in this project statement of work to provide a complete and usable facility upon completion. The detailed Scope of Work is described here-in below and the attached supporting documents.

Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 130 (Work Clearance). The Contractor shall coordinate on-site safety requirements through 718th Civil Engineer Squadron (718 CES)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 18, 2025

    Presolicitation

    Due April 2, 2025 at 1:30 AM EDT. SAM.gov, notice 293c69f527c141ae8274e908aba52f61

Points of contact