Presolicitation, local area set-aside
Repair Interior Ceiling Building 224
FA527025R0009
Department of the Air Force, FA5270 18 Cons PK. Commercial and Institutional Building Construction.
Response deadline
April 2, 2025 at 1:30 AM EDT
Closed 534 days ago. Posted May 29, 2025, first published March 30, 2025. Scheduled to archive August 1, 2025.
Description
As published on SAM.gov.
The purpose of this notice is to notify everyone that the NOTICE ID number for this requirement will change to NOTICE ID number FA527025R0009 for solicitation posting. This project shall consist of but not limited to providing all field investigations, surveys, design, plant, labor, materials, equipment, supplies, transportation, third-party services, and incidental related work to design and execute construction work defined in this Statement of Work and the attached documents.
The work includes all necessary finishing work to provide the Government with a final product that is fully functional and leaves no areas of the facility that appear incomplete or unfinished. This project shall accomplish a design-build repair the true ceiling of B224. Work includes full Asbestos-Containing Material (ACM) abatement of the ceiling paint and repair spalls and cracks.
Include any site preparation work such as temporary removal of the suspended ceiling, lighting system, alarm, electrical wiring and conduit, and ceiling hung air-condition unit. Sustainable principles, to include life cycle cost- effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements.
The scope of work may require the sampling, removal/abatement, and disposal of ACM, LBP, or other hazardous building materials. The Contractor shall determine the best technical design solution in conformance with current regulations.
The design and construction work shall comply with US federal, Department of Defense, Air Force, and 18 Wing criteria, as well as applicable Japan regulatory requirements not specifically stated elsewhere in this project statement of work to provide a complete and usable facility upon completion. The detailed Scope of Work is described here-in below and the attached supporting documents.
Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 130 (Work Clearance). The Contractor shall coordinate on-site safety requirements through 718th Civil Engineer Squadron (718 CES)
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 30, 2025
Presolicitation
Due April 2, 2025 at 1:30 AM EDT. SAM.gov, notice 27aa62c95a1c462d957d8f906ff56f02
May 29, 2025
Presolicitation
Due April 2, 2025 at 1:30 AM EDT. SAM.gov, notice 1ee8b85417ce47bd9930c3713da858d0
May 29, 2025
Solicitation
REPAIR INTERIOR CEILING, B224
Due June 30, 2025 at 1:00 AM EDT. SAM.gov, notice a9f240d2fa544239b121c48f1f03d91d
May 29, 2025
Presolicitation
Due April 2, 2025 at 1:30 AM EDT. SAM.gov, notice f61b9348cb8744838add9d550e28b3a9
Points of contact
- Victor T. Cannon Jr.victor.cannon.2@us.af.mil3156341837
- Nicholas Cripenicholas.cripe@us.af.mil3156344343