Skip to content
  • 6,816 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

36LRS SOIL REMOVAL

FA524026Q0047

Department of the Air Force, FA5240 36 Cons LGC. Hazardous Waste Treatment and Disposal.

Response deadline

September 16, 2026 at 8:00 PM EDT

Closed 44 days ago. Posted September 14, 2026, first published September 9, 2026. Scheduled to archive October 2, 2026.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed 44 days ago

8 like it are open now in hazardous waste treatment and disposal

All 8 open in hazardous waste treatment and disposal

Description

As published on SAM.gov.

The Contractor shall provide all labor, supervision, equipment, materials, tools, transportation, packaging, sampling, laboratory analysis, and disposal services necessary to remediate residual petroleum-impacted soil and remove fuel-contaminated wastewater at the 36th Logistics Readiness Squadron (LRS) Petroleum, Oils, and Lubricants (POL) Compound, Andersen Air Force Base (AFB), Guam. The work addresses contamination associated with a fuel release near Building 26200 / Pumphouse 1 Generator and the contents of the Product Recovery Tank at Pumphouse 1.
The objective is to excavate and remove fuel-impacted soils to achieve the applicable cleanup goals, properly package, transport, and dispose of all generated waste (soil and liquid), confirm attainment of cleanup standards through laboratory analysis, and restore the excavated area to match surrounding grade and pre-existing conditions. All work shall be performed in a manner that minimizes disruption to flight operations and base activities.

Amendment 0001 - Updated SOW to = Attachment 1 - Statement of Work (SOW)_14SEP26, edits made in RED TEXT 

Section 4.4 "Product Recovery Tank and Fuel Bowser Wastewater Removal"
"The Contractor shall remove up to 900 gallons of fuel-contaminated wastewater / product from the Product Recovery Tank located at Pumphouse 1, additionally 1 Fuel Bowser with 600 gallons of fuel-contaminated wastewater (combined total of approximately 1500 gallons)."

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 9, 2026

    Combined synopsis and solicitation

    Due September 16, 2026 at 8:00 PM EDT. SAM.gov, notice 1d7e6caaba71461d9fd3035d7946ad63

    3 revisions on SAM
    • September 14, 2026: publish, combined synopsis and solicitation
    • September 14, 2026: publish, combined synopsis and solicitation
    • September 9, 2026: publish, combined synopsis and solicitation
  2. September 14, 2026

    Combined synopsis and solicitation

    Due September 16, 2026 at 8:00 PM EDT. SAM.gov, notice 040fc9f030b1420e8c63aa013fb27f21

    3 revisions on SAM
    • September 14, 2026: publish, combined synopsis and solicitation
    • September 14, 2026: publish, combined synopsis and solicitation
    • September 9, 2026: publish, combined synopsis and solicitation
  3. September 14, 2026

    Combined synopsis and solicitation

    Due September 16, 2026 at 8:00 PM EDT. SAM.gov, notice e9e8c83e636a42b99c5af31e134a9dc9

    3 revisions on SAM
    • September 14, 2026: publish, combined synopsis and solicitation
    • September 14, 2026: publish, combined synopsis and solicitation
    • September 9, 2026: publish, combined synopsis and solicitation

Points of contact