Skip to content
Abierto

Justification

KPSFS Power Plant Automatic Control System

FA521526P0020

Department of the Air Force, FA5215 766 Ess PKP. Electronic and Precision Equipment Repair and Maintenance.

Status

Justification

Posted August 28, 2026. Scheduled to archive September 27, 2026.

Description

As published on SAM.gov.

Kaena Point Space Force Station has a critical requirement for highly specialized engineering labor, trouble shooting, and software repair services for the failed Power Plant Automatic Control System (ACS). The scope of this effort requires the contractor to safely assess, test, evaluate, troubleshoot, and repair the localized, closed loop computer logic controller that operates the installations power plant emergency automatic control system.

The repaired system must successfully achieve automated outage sensing and transition capabilities, transferring critical satellite tracking mission loads to emergency backup generators within approximately 30 seconds of a commercial grid failure. Testing must be non-destructive to ensure the total structural and software integrity of the existing generator switch gears and breakers.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 28, 2026

    Justification

    SAM.gov, notice c362428bef354a4797791237ca01dac2

Points of contact