Combined synopsis and solicitation, total small business set-aside
JBER 2 Rivers Flooring replacement
FA500024Q4218
Department of the Air Force, F1w3ce 673 Cons Contracting. Flooring Contractors.
Response deadline
September 6, 2024 at 4:00 PM EDT
Closed 786 days ago. Posted September 3, 2024, first published August 9, 2024. Scheduled to archive September 21, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
9 like it are open now in flooring contractors
- UNITED STATES COAST GUARD KETCHIKAN ALASKA NEW CARPET INSTALLATION
US Coast Guard, Base Ketchikan
Combined synopsis and solicitationNAICS 238330Anywhere in the USUNITEDSTATESCOASTGUARDKETCHNEWCARPETCloses in 12 daysNov 13 - Replace Operating Room 5 Flooring
Department of Veterans Affairs, Network Contract Office 23
SolicitationSDVOSBNAICS 238330Des Moines, IA36C26327Q0019Closes in 2 daysNov 3 - Grout Maintenance for the Puget Sound VA
Department of Veterans Affairs, 260-Network Contract Office 20
SolicitationSmall businessNAICS 238330Washington36C26026Q0827Closes in 4 daysNov 5
Description
As published on SAM.gov.
UPDATE PROVIDED AS OF 3 SEPTEMBER 2024 Asbestos testing results uploaded as an attachment.
End of Update---------- UPDATE PROVIDED AS OF 29 AUGUST 2024 Bldg 297 CAD drawings are now provided in the attachments section. We have also updated the drawing on page 1 of the PWS changing the flooring makeup of Room A to Carpet all the way to the begining of both side hallways as indicated in the PWS Page 1 Drawing Update also provided in the attachements section of this post.
End of Update---------- This requirement is for the procurement of 2 Rivers Flooring Replacement as required and defined for the in Attachment 2 -Performance Work Statement (PWS). Requirement is to remove existing flooring, properly prep floor and install new commercial grade carpet, luxury vinyl tile/plank, and cove base in building 297 as outlined in the PWS. All items shall be completed within 180 day after contract award.
A site visit is planned and willl be held on 29 Aug 2024 at 12:00pm (AKST) at Building 297 6th st, Joint Base Elmendorf Richardson AK 99505. Atendees must be pre-cleared to access the base. All interested contractors should contact Captain Logue at David.logue.1@us.af.mil prior to site visit, No later than 27 August at 12:00pm (AKST), to request clearance for base access.
Please forward all questions to Lt McKenna Hendrix and Captain David Logue no later than 12:00pm Alaska Daylight Time 30 August 2024 to McKenna.hendrix@us.af.mil and David.logue.1@us.af.mil Quotes are due no later than 12:00pm Alaska Daylight Time on 6 September 2024 emailed to McKenna.hendrix@us.af.mil and David.logue.1@us.af.mil
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 9, 2024
Combined synopsis and solicitation
Due August 30, 2024 at 4:00 PM EDT. SAM.gov, notice cc82fe13cfd441689523ba4a5df3d7f3
August 22, 2024
Combined synopsis and solicitation
Due September 6, 2024 at 4:00 PM EDT. SAM.gov, notice 15daeeaf64f847dbb3a6d37a9f0608be
August 29, 2024
Combined synopsis and solicitation
Due September 6, 2024 at 4:00 PM EDT. SAM.gov, notice b281297248ac4d0ebf2c0e92d9d40a12
September 3, 2024
Combined synopsis and solicitation
Due September 6, 2024 at 4:00 PM EDT. SAM.gov, notice 4fd864367a2d4d89a299669cff85cdcc
Points of contact
- McKenna Hendrixmckenna.hendrix@us.af.mil9075525448
- David Loguedavid.logue.1@us.af.mil9075526769